← Back
Large suburban residence
1560 EAST 7 STREET
BROOKLYN · Mapleton-Midwood (West) · BIN 3173829
💬 Discuss this project
1925Year Built
3Stories
A3Building Class
R5Zoning
4,450 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Large suburban residence · 3,333 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionGeneral
Roof6p · 2 filings · 20 docs
Attic16p · 1 filing · 20 docs
Floor 317p · 1 filing · 20 docs
Floor 230p · 1 filing · 20 docs
Floor 133p · 2 filings · 20 docs
Cellar35p · 1 filing · 20 docs
Site & exterior34p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RHY CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC607/09/2025
ALFRED MIERZEJEWSKI ARCHITECT103/13/2023
RAHMAN CONSULTING309/10/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RHY CONSTRUCTION LLCGeneral Contractor1607/08/2026
ABE HIMELFARBElectrical103/21/2026
JEM FIRE PREVENTION INCFire Protection107/08/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129907/09/2025
Building Lifecycle
All (134)Filed (9)Permit Issued (12)Signed Off (4)Violation (1)Inspection (10)Objection (68)Special Inspection (30)
08/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/06/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
07/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
07/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
07/28/2025
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
07/25/2025
Objection resolved — Addressed
07/23/2025
Objection raised — Other
07/09/2025
Filed — Alteration CO
creating structural design for 2 1/2 story horizontal to existing 2 1/2 story building. structural work in conjunction with GC B00764144-I1
B00764144-P4
07/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NANIK MASSAND
07/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
NANIK MASSAND
07/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
07/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
05/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/09/2024
Signed off — Alteration CO
creating structural design for 2 1/2 story horizontal to existing 2 1/2 story building. structural work in conjunction with GC B00764144-I1
B00764144-S3
12/09/2024
Signed off — Alteration CO
creating structural design for 2 1/2 story horizontal to existing 2 1/2 story building. structural work in conjunction with GC B00764144-I1
B00764144-S2
12/09/2024
Signed off — Alteration CO
creating structural design for 2 1/2 story horizontal to existing 2 1/2 story building. structural work in conjunction with GC B00764144-I1
B00764144-S4
11/29/2024
Special inspection requirement — Air barrier - visual inspection
NANIK MASSAND
11/29/2024
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
11/29/2024
Special inspection requirement — Interior lighting power
NANIK MASSAND
11/29/2024
Special inspection requirement — Metering
NANIK MASSAND
11/29/2024
Special inspection requirement — Fenestration air leakage
NANIK MASSAND
11/29/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NANIK MASSAND
11/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
11/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NANIK MASSAND
11/29/2024
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
11/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
11/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
NANIK MASSAND
11/29/2024
Special inspection requirement — Fenestration areas
NANIK MASSAND
10/11/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/02/2024
Signed off — Alteration CO
creating structural design for 2 1/2 story horizontal to existing 2 1/2 story building. structural work in conjunction with GC B00764144-I1
B00764144-S1
11/01/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/21/2023
Permit issued — Plumbing
B00764144-S5-PL
07/21/2023
Permit issued — Sprinklers
B00764144-S6-EW-SP
07/06/2023
Objection resolved — Addressed
07/05/2023
Objection raised — Scope
06/30/2023
Violation issued (ECB, open)
Construction
06/23/2023
Permit issued — Construction Fence
B00764144-S1-FN
06/23/2023
Permit issued — Support of Excavation
B00764144-S4-SE
06/23/2023
Permit issued — Structural
B00764144-S2-ST
06/23/2023
Permit issued — Foundation
B00764144-S3-FO
06/22/2023
Permit issued — General Construction
B00764144-I1-GC
06/21/2023
Filed — Alteration CO
creating structural design for 2 1/2 story horizontal to existing 2 1/2 story building. structural work in conjunction with GC B00764144-I1
B00764144-P1
06/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
NANIK MASSAND
06/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NANIK MASSAND
06/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
06/21/2023
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
06/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
05/22/2023
Permit issued — General Construction
B00764144-I1-GC
04/03/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NANIK MASSAND
03/13/2023
Filed — Alteration CO
creating structural design for 2 1/2 story horizontal to existing 2 1/2 story building. structural work in conjunction with GC B00764144-I1
B00764144-S6
02/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
01/31/2023
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFLAVIO MECHANICAL CORP07/21/2023
DOB NOWSprinklersPermit IssuedJEM FIRE PREVENTION INC07/21/2023
DOB NOWConstruction FenceSigned-offRHY CONSTRUCTION LLC06/23/2023
DOB NOWSupport of ExcavationSigned-offRHY CONSTRUCTION LLC06/23/2023
DOB NOWStructuralPermit IssuedRHY CONSTRUCTION LLC06/23/2023
DOB NOWFoundationPermit IssuedRHY CONSTRUCTION LLC06/23/2023
DOB NOWGeneral ConstructionPermit IssuedRHY CONSTRUCTION LLC06/22/2023
DOB NOWGeneral ConstructionPermit IssuedRHY CONSTRUCTION LLC05/22/2023
DOB NOWSupport of ExcavationSigned-offRHY CONSTRUCTION LLC01/12/2023
DOB NOWFoundationPermit IssuedRHY CONSTRUCTION LLC12/08/2022
DOB NOWStructuralPermit IssuedRHY CONSTRUCTION LLC10/27/2022
DOB NOWConstruction FenceSigned-offRHY CONSTRUCTION LLC09/06/2022
BIS—ISSUEDBOAZ CONTRACTING07/23/2004
BISEQISSUEDBOAZ CONTRACTING07/23/2004
BISPLISSUEDSCARPONI&SON PLBG&HTG COR05/25/2004
BISEQISSUEDBOAZ CONTRACTING02/27/2004
BIS—ISSUEDBOAZ CONTRACTING02/27/2004
1 project · most recent 07/09/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/09/2025Permit IssuedTRI CITY MECHANICAL GROUPGas, Water/Sanitary
1 project · most recent 10/29/2023
General Wiring
FiledStatusContractorScope
10/29/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
1 project · most recent 07/09/2025
Steel Wood
FiledStatusContractorScope
07/09/2025Permit IssuedTRI CITY MECHANICAL GROUPSteel, Wood
1 project · most recent 07/09/2025
Fence
FiledStatusContractorScope
07/09/2025Permit IssuedTRI CITY MECHANICAL GROUPFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
07/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
07/28/2025HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
07/28/2025HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
07/28/2025HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
07/28/2025Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
07/28/2025Energy Code Compliance InspectionsNANIK MASSANDprogress
07/09/2025HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
07/09/2025HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
07/09/2025HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
07/09/2025Energy Code Compliance InspectionsNANIK MASSANDprogress
07/09/2025Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
11/29/2024Air barrier - visual inspectionNANIK MASSANDenergy_progress
11/29/2024Insulation placement and R valuesNANIK MASSANDenergy_progress
11/29/2024Interior lighting powerNANIK MASSANDenergy_progress
11/29/2024MeteringNANIK MASSANDenergy_progress
11/29/2024Fenestration air leakageNANIK MASSANDenergy_progress
11/29/2024Excavations - Sheeting, Shoring, and BracingNANIK MASSANDspecial
11/29/2024Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
11/29/2024Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
11/29/2024Energy Code Compliance InspectionsNANIK MASSANDprogress
11/29/2024Fire-Resistance Rated ConstructionNANIK MASSANDprogress
11/29/2024Fenestration and door U-factor and product ratingsNANIK MASSANDenergy_progress
11/29/2024Fenestration areasNANIK MASSANDenergy_progress
06/21/2023HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
06/21/2023HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
06/21/2023HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
Latest 25 of 55.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B00764144-P3Request digital key ↗
08/28/2026B00764144-I1Request digital key ↗
08/28/2026B00764144-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
04/25/2025301443739Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/28/2026B00764144-P3Open ↗
08/13/2026B01364646-I1Open ↗
08/13/2026B00764144-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/28/2026B00764144-P3Open ↗
08/13/2026B00764144-I1Open ↗
08/13/2026B01364646-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00764144-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026B00764144-P3Open ↗
09/01/2026B00764144-P3Open ↗
09/01/2026B00764144-P3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/30/2026B00764144-S6Open ↗
09/01/2026B00764144-P3Open ↗
09/01/2026B00764144-P3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B00764144-P4Open ↗
08/28/2026B00764144-P3Open ↗
08/28/2026B00764144-I1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/28/2026B00764144-I1Open ↗
08/28/2026B00764144-P3Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00764144-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00764144-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026B00764144-P3Open ↗
08/28/2026B00764144-I1Open ↗
08/28/2026B00764144-S1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00764144-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B00764144-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00764144-S4Open ↗
▸Other Documents13
▸DOB NOWPlot Diagram4
08/28/2026B00764144-P3Open ↗
08/13/2026B00764144-S3Open ↗
08/13/2026B00764144-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/28/2026B00764144-P3Open ↗
08/13/2026B00764144-I1Open ↗
08/13/2026B01364646-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/28/2026B00764144-I1Open ↗
08/28/2026B00764144-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/28/2026B00764144-P3Open ↗
08/13/2026B00764144-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00764144-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00764144-S4Open ↗