← Back
Elevator apt, semi-fireproof without stores
1560 OCEAN PARKWAY
BROOKLYN · Mapleton-Midwood (West) · BIN 3174958
💬 Discuss this project
1931Year Built
6Stories
D1Building Class
R6AZoning
60,350 sfGross Floor Area
59Units
LL97 CoveredRent Stabilized30 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: STEELMONT HOLDINGS LLC · 16,850 sf lot · 3.58 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalEquipmentGeneral
Roof2p · 1 filing · 12 docs
Floor 17p · 1 filing · 2 docs
Site & exterior11p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEWPORT MANAGEMENT807/08/2026
GOLDMONT REALTY509/12/2026
J G CONSTRUCTION SRVCS507/08/2026
STEELMONT HOLDINGS303/22/2026
HKS CONSTRUCTION203/21/2026
GUAVA REALTY203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2013$1.2M—— → —$20/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PACIFICO ENGINEERING PC207/24/2026
ASHRAF CORP110/14/2024
KZ ENGINEERING, P.C111/29/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SILVERCUP SCFFLDNG I LLCGeneral Contractor1607/08/2026
KANE, PAPAElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
INTERBORO PLBG & HTG CORPElectrical103/21/2026
BEST ENERGY POWER 2015 LLGeneral Contractor104/09/2026
J & G CONSTRUCTION SVCSGeneral Contractor107/08/2026
SPADARO, JERRYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PACIFICO ENGINEERING PC3157207/24/2026
Building Lifecycle
All (80)Filed (4)Permit Issued (8)Signed Off (3)Violation (60)Special Inspection (5)
07/29/2026
Signed off — Alteration
Installation of roof mounted solar pv system on roof. no change of use, egress, or occupancy.
B01305662-I1
07/24/2026
Filed — Alteration
Installation of roof mounted solar pv system on roof. no change of use, egress, or occupancy.
B01305662-P1
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
07/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
07/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
07/23/2026
Special inspection requirement — Final
Ralph Pacifico
07/23/2026
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
03/20/2026
Violation issued (HPD, closed)
C
03/20/2026
Violation issued (HPD, closed)
B
03/20/2026
Violation issued (HPD, closed)
C
03/20/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
C
03/18/2026
Violation issued (HPD, closed)
A
03/18/2026
Violation issued (HPD, closed)
C
02/20/2026
Violation issued (HPD, closed)
B
02/20/2026
Violation issued (HPD, closed)
C
02/20/2026
Violation issued (HPD, closed)
B
02/03/2026
Violation issued (HPD, closed)
C
02/03/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
C
01/07/2026
Violation issued (HPD, closed)
B
12/19/2025
Violation issued (HPD, closed)
B
12/19/2025
Violation issued (HPD, closed)
C
12/19/2025
Violation issued (HPD, closed)
B
12/19/2025
Violation issued (HPD, closed)
A
12/19/2025
Violation issued (HPD, closed)
B
12/19/2025
Violation issued (HPD, closed)
B
12/19/2025
Violation issued (HPD, closed)
C
12/17/2025
Violation issued (HPD, closed)
B
12/17/2025
Violation issued (HPD, open)
B
12/17/2025
Violation issued (HPD, closed)
C
12/17/2025
Violation issued (HPD, closed)
B
12/17/2025
Violation issued (HPD, closed)
B
12/17/2025
Violation issued (HPD, closed)
C
12/17/2025
Violation issued (HPD, closed)
C
12/17/2025
Violation issued (HPD, closed)
C
12/17/2025
Violation issued (HPD, closed)
C
12/01/2025
Permit issued — Solar
B01305662-I1-SL
11/20/2025
Violation issued (HPD, closed)
I
11/19/2025
Filed — Alteration
Installation of roof mounted solar pv system on roof. no change of use, egress, or occupancy.
B01305662-I1
10/17/2025
Violation issued (HPD, closed)
C
08/06/2025
Violation issued (HPD, closed)
C
08/06/2025
Violation issued (HPD, closed)
B
07/26/2025
Violation issued (HPD, closed)
B
07/20/2025
Violation issued (HPD, open)
B
07/20/2025
Violation issued (HPD, closed)
C
07/03/2025
Violation issued (HPD, closed)
C
07/03/2025
Violation issued (HPD, closed)
B
01/29/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01125017-I1
01/27/2025
Violation issued (HPD, closed)
B
01/27/2025
Violation issued (HPD, closed)
B
12/07/2024
Violation issued (HPD, open)
C
12/07/2024
Violation issued (HPD, closed)
C
12/07/2024
Violation issued (HPD, closed)
C
12/07/2024
Violation issued (HPD, closed)
B
12/07/2024
Violation issued (HPD, closed)
C
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBEST ENERGY POWER 2015 LL12/01/2025
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS10/15/2024
DOB NOWSidewalk ShedSigned-offSILVERCUP SCFFLDNG I LLC08/27/2019
DOB NOWSidewalk ShedSigned-offSILVERCUP SCFFLDNG I LLC08/27/2019
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC04/13/2018
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC04/11/2018
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC11/29/2017
DOB NOWSidewalk ShedSigned-offSILVERCUP SCFFLDNG I LLC11/29/2017
BISOTISSUEDCARNEGIE MANGEMENT INC03/14/2018
BISOTISSUEDCARNEGIE MANGEMENT INC12/07/2017
BISEQISSUEDHKS CONSTRUCTION CORP07/16/2015
BISOTISSUEDALAMIN CONSTRUCTION INC07/01/2015
BISSPISSUEDAPPLE INCINERATOR AND COMPACTION02/14/1992
BISOTISSUEDAPPLE INCINERATOR AND COMPACTION02/04/1992
3 projects · most recent 04/22/2026
FiledStatusContractorScope
04/22/2026CompleteBERGER QUALITY ELEC'L CON—
10/09/2024CompleteRICHARD NEU—
04/26/2018Permit IssuedCONTACT PLUS ELEC'L CORP—
1 project · most recent 07/24/2026
FiledStatusContractorScope
07/24/2026Signed-offBEST ENERGY POWER 2015 LL188 panels, 79.58 kw, 9,504 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/23/2026Fire-Resistant Penetrations and JointsRalph Pacificospecial
07/23/2026Structural Stability – Alterations of existing buildingsRalph Pacificospecial
07/23/2026Energy Code Compliance InspectionsRalph Pacificoprogress
07/23/2026FinalRalph Pacificoprogress
07/23/2026Air barrier - visual inspectionRalph Pacificoenergy_progress
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026B00002180-I1Request digital key ↗
08/23/2026B01125017-I1Request digital key ↗
08/19/2026B01305662-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION4
03/15/2018321686724Open ↗
12/11/2017321686724Open ↗
07/14/2015340281135Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
03/02/2018321686724Open ↗
11/22/2017321686724Open ↗
07/14/2015340281135Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/28/2018321686724Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026B00002180-I1Open ↗
08/19/2026B01305662-P1Open ↗
08/19/2026B01305662-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/22/2017321686724Open ↗
07/14/2015340281135Open ↗
06/29/2015340276579Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
02/22/2018321686724Open ↗
12/11/2017321686724Open ↗
11/22/2017321686724Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026B01305662-P1Open ↗
08/27/2026B01305662-P1Open ↗
08/27/2026B01305662-P1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/14/2015340281135Open ↗
06/29/2015340276579Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/14/2015340281135Open ↗
06/29/2015340276579Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B01305662-P1Open ↗
08/27/2026B01305662-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/22/2017321686724Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
11/24/2017321686724Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026B01305662-P1Open ↗
08/19/2026B01305662-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/22/2017321686724Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/29/2015340276579Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/29/2015340276579Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/14/2015340281135Open ↗
06/29/2015340276579Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/19/2026B01305662-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/22/2017321686724Open ↗
06/29/2015340276579Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
07/14/2015340281135Open ↗
06/29/2015340276579Open ↗
▸BISEFILING COVER SHEET1
11/20/2017321686724Open ↗