← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1560 SELWYN AVENUE
BRONX · BIN 2007827
💬 Discuss this project
1926Year Built
6Stories
D1Building Class
R7-1Zoning
61,806 sfGross Floor Area
64Units
LL97 CoveredRent Stabilized135 Active Violations 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 1560 Selwyn LLC C/O M · 14,250 sf lot · 4.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 6Unit 6L, Unit 6M5p · 1 filing · 5 docs
Floor 5Unit 5L, Unit 5M4p · 1 filing · 5 docs
Floor 4Unit 4N4p · 1 filing · 5 docs
Floor 3
Floor 2
Floor 1Heavy duty sidewalk shed1p · 1 filing · 2 docs
Cellar1 filing · 8 docs
Site & exteriorHeavy duty sidewalk shed installation4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1560 Selwyn1203/22/2026
LLC407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rise Architecture206/17/2026
Indrajeet Vagha PE102/09/2023
Bangash Associates104/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jack Jaffa & Associates203/21/2026
Atlantic Building Supply203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nya ConstructionScaffold1707/08/2026
Net Power ElectricElectrical503/21/2026
Mka General ConstructionScaffold303/21/2026
National MicrowaveGeneral Contractor103/21/2026
Squan Construction ServicesGeneral Contractor103/21/2026
Clean Tech MechanicalPlumbing107/08/2026
Lime Stone BuildersGeneral Contractor111/13/2020
Vertical SolutionsGeneral Contractor108/05/2005
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Biz Designs6312106/17/2026
Sia Inspections7306101/11/2021
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/09/2026
Boiler inspection report filed
Initial · no defects · Accepted
08/15/2026
§27-2104(b) hmc post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the…
HPD violation · open
08/15/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH LEADING TO FIRE ESCAPE IN THE 4th ROOM FROM…
HPD violation · open
08/15/2026
§ 27-2042 ADM code provide a mirror in self-service elevator arranged so as to enable a person entering, to view inside of elevator number ,
HPD violation · open
225 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offMka General Construction02/10/2023
DOB NOWSidewalk ShedSigned-offNya Construction04/06/2022
DOB NOWSidewalk ShedSigned-offNya Construction05/17/2021
DOB NOWPlumbingSigned-offClean Tech Mechanical01/20/2021
DOB NOWSidewalk ShedSigned-offNya Construction04/09/2020
DOB NOWSidewalk ShedSigned-offNya Construction03/23/2020
DOB NOWSidewalk ShedSigned-offNya Construction10/04/2019
DOB NOWSidewalk ShedSigned-offNya Construction09/27/2019
DOB NOWSidewalk ShedSigned-offNya Construction04/18/2019
BIS—ISSUEDLime Stone Builders11/13/2020
BISOTISSUEDSquan Construction Services10/16/2015
BISOTISSUEDSquan Construction Services04/24/2015
BISOTISSUEDNational Microwave02/11/2013
BISOTISSUEDVertical Solutions08/05/2005
BISFSISSUEDIrving Bauer07/20/2001
BISFBISSUEDIrving Bauer07/16/2001
BISFSISSUEDG. Bauer03/27/1995
5 projects · most recent 06/18/2026
General Wiring
FiledStatusContractorScope
06/18/2026Permit IssuedWatts Up Electric NYGeneral Wiring
11/07/2022CompleteNet Power ElectricGeneral Wiring
06/24/2022CompleteAmerican Power ElectricGeneral Wiring
04/17/2019CompleteRichard Neu—
09/18/2018CompleteR.C.M. ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/11/2026Tenant Protection Plan ComplianceJeff Akermanspecial
06/10/2026Fire-Resistance Rated ConstructionJeff Akermanprogress
06/10/2026Fire-Resistant Penetrations and JointsJeff Akermanspecial
06/10/2026Insulation placement and R valuesJeff Akermanenergy_progress
06/10/2026Energy Code Compliance InspectionsJeff Akermanprogress
06/08/2026FinalRachel Paskeszprogress
12/08/2020Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
107 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account