← Back
Two family frame
1562 EAST 3 STREET
BROOKLYN · Mapleton-Midwood (West) · BIN 3173593
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R5Zoning
2,544 sfGross Floor Area
2Units
Two family frame · 2,731 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Floor 219p · 2 filings · 20 docs
Floor 119p · 2 filings · 20 docs
Cellar26p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/04/2022$1.8M—Private party → Private party$708/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIS CONSULTING509/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SELF EMPLOYED503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PALACE HOUSING CORPGeneral Contractor603/21/2026
RITE WAY HEATING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JS BUILDING CONSULTING4959204/21/2023
Building Lifecycle
All (51)Filed (5)Permit Issued (4)Inspection (6)Objection (6)Special Inspection (30)
07/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2025
Permit issued — Plumbing
B00754015-I1-PL
04/10/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/07/2023
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH ALT TYPE 1. REMOVAL OF ALL PLUMBING FIXTURES ON THE BUILIDNG . INSTALLATION OF NEW PLUMBING FIXTURES AND RISERS.
B00754015-P1
06/27/2023
Objection resolved — Resolved
06/27/2023
Objection resolved — Resolved
06/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/27/2023
Objection raised — Other
04/27/2023
Objection raised — Energy
04/27/2023
Objection raised — Other
04/27/2023
Objection raised — Other
04/21/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
B00753921-P1
03/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julian Saavedra
02/28/2023
Special inspection requirement — Mechanical Systems
Julian Saavedra
02/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Julian Saavedra
02/28/2023
Special inspection requirement — Final
Julian Saavedra
02/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Julian Saavedra
02/28/2023
Special inspection requirement — Electric vehicle service equipment requirements
Julian Saavedra
02/28/2023
Special inspection requirement — Fenestration areas
Julian Saavedra
02/28/2023
Special inspection requirement — Metering
Julian Saavedra
02/28/2023
Special inspection requirement — Fenestration air leakage
Julian Saavedra
02/28/2023
Special inspection requirement — Insulation placement and R values
Julian Saavedra
02/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
Julian Saavedra
02/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
Julian Saavedra
02/28/2023
Special inspection requirement — Permanent certificate
Julian Saavedra
02/28/2023
Special inspection requirement — Interior lighting power
Julian Saavedra
02/28/2023
Special inspection requirement — Air barrier — testing
Julian Saavedra
02/28/2023
Special inspection requirement — Air barrier - visual inspection
Julian Saavedra
02/28/2023
Special inspection requirement — Ventilation and air distribution system
Julian Saavedra
02/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Julian Saavedra
02/28/2023
Special inspection requirement — Protection of exposed foundation insulation
Julian Saavedra
02/28/2023
Special inspection requirement — Maintenance information
Julian Saavedra
01/13/2023
Permit issued — General Construction
B00753921-I1-GC-CX
12/14/2022
Special inspection requirement — Electric vehicle service equipment requirements
Julian Saavedra
11/16/2022
Permit issued — Plumbing
B00754015-I1-PL
09/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
Julian Saavedra
09/26/2022
Special inspection requirement — Metering
Julian Saavedra
09/26/2022
Special inspection requirement — Permanent certificate
Julian Saavedra
09/26/2022
Special inspection requirement — Air barrier — testing
Julian Saavedra
09/26/2022
Special inspection requirement — Protection of exposed foundation insulation
Julian Saavedra
09/26/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Julian Saavedra
09/26/2022
Special inspection requirement — Air barrier - visual inspection
Julian Saavedra
09/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Julian Saavedra
08/10/2022
Permit issued — Construction Fence
B00744354-I1-FN
08/04/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
B00753921-I1
08/01/2022
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH ALT TYPE 1. REMOVAL OF ALL PLUMBING FIXTURES ON THE BUILIDNG . INSTALLATION OF NEW PLUMBING FIXTURES AND RISERS.
B00754015-I1
08/01/2022
Filed — Alteration
B00744354-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedLS PLUMBING CORP07/23/2025
DOB NOWGeneral ConstructionPermit IssuedPALACE HOUSING CORP01/13/2023
DOB NOWPlumbingPermit IssuedLS PLUMBING CORP11/16/2022
DOB NOWConstruction FencePermit IssuedPALACE HOUSING CORP08/10/2022
1 project · most recent 09/07/2023
Gas Water/Sanitary
FiledStatusContractorScope
09/07/2023Permit IssuedLS PLUMBING CORPGas, Water/Sanitary
1 project · most recent 11/23/2022
General Wiring
FiledStatusContractorScope
11/23/2022Permit IssuedMEIR ELECTRIC CO.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
03/23/2023Structural Stability – Alterations of existing buildings—special
02/28/2023Fire-Resistant Penetrations and JointsJulian Saavedraspecial
02/28/2023Mechanical SystemsJulian Saavedraspecial
02/28/2023Energy Code Compliance InspectionsJulian Saavedraprogress
02/28/2023FinalJulian Saavedraprogress
02/28/2023Fenestration and door U-factor and product ratingsJulian Saavedraenergy_progress
02/28/2023Electric vehicle service equipment requirementsJulian Saavedraenergy_progress
02/28/2023Fenestration areasJulian Saavedraenergy_progress
02/28/2023MeteringJulian Saavedraenergy_progress
02/28/2023Fenestration air leakageJulian Saavedraenergy_progress
02/28/2023Insulation placement and R valuesJulian Saavedraenergy_progress
02/28/2023HVAC-R and service water heating equipmentJulian Saavedraenergy_progress
02/28/2023HVAC-R and service water heating system controlsJulian Saavedraenergy_progress
02/28/2023Permanent certificateJulian Saavedraenergy_progress
02/28/2023Interior lighting powerJulian Saavedraenergy_progress
02/28/2023Air barrier — testing Julian Saavedraenergy_progress
02/28/2023Air barrier - visual inspectionJulian Saavedraenergy_progress
02/28/2023Ventilation and air distribution systemJulian Saavedraenergy_progress
02/28/2023HVAC-R and service water piping design and insulationJulian Saavedraenergy_progress
02/28/2023Protection of exposed foundation insulationJulian Saavedraenergy_progress
02/28/2023Maintenance informationJulian Saavedraenergy_progress
12/14/2022Electric vehicle service equipment requirementsJulian Saavedraenergy_progress
09/26/2022HVAC-R and service water heating system controlsJulian Saavedraenergy_progress
09/26/2022MeteringJulian Saavedraenergy_progress
09/26/2022Permanent certificateJulian Saavedraenergy_progress
Latest 25 of 41.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026B00744354-I1Request digital key ↗
08/27/2026B00753921-I1Request digital key ↗
08/27/2026B00753921-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00753921-P1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/25/2026B00753921-I1Open ↗
08/25/2026B00753921-I1Open ↗
08/25/2026B00753921-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026B00744354-I1Open ↗
08/27/2026B00753921-I1Open ↗
08/27/2026B00753921-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B00753921-I1Open ↗
08/25/2026B00753921-P1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00753921-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026B00753921-I1Open ↗
08/27/2026B00753921-P1Open ↗
08/26/2026B00754015-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents5
▸DOB NOWSite Survey: Initial2
08/13/2026B00753921-P1Open ↗
08/13/2026B00753921-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/27/2026B00753921-P1Open ↗
08/27/2026B00753921-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00753921-P1Open ↗