← Back
BuildNYC
Office only, 2-6 stories
1567 63RD STREET
BROOKLYN · Bensonhurst · BIN 3259616
💬 Discuss this project
2019Year Built
2Stories
O2Building Class
M1-1Zoning
7,637 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Office only, 2-6 stories · Owner of record: YDC 1567 63 · 3,967 sf lot · 1.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCommunity facility conversion and renovationUnder Construction50p · 2 filings · 20 docs
BulkheadCommunity facility conversion and renovationUnder Construction4p · 1 filing · 20 docs
Floor 3Community facility conversion and renovationUnder Construction55p · 2 filings · 20 docs
Floor 2Community facility conversion and renovationUnder Construction54p · 2 filings · 20 docs
Floor 1Community facility conversion and renovationUnder Construction57p · 4 filings · 20 docs
CellarCommunity facility conversion and renovationUnder Construction47p · 1 filing · 20 docs
Site & exteriorTemporary pipe scaffold installationUnder Construction16p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Yeshiva Darkei Chaim2009/18/2026
1567 63 LLC603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/10/2023$4.0M—1567 63 LLC → YDC 1567 63 LLC$524/sf building
07/30/2019$1.7M—— → —$223/sf building
05/04/2016$1.7M—Private party → NEW HOPE AUTO TRANSPORTATION LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Soni Engineering Consulting208/28/2025
Associates304/23/2025
Conapac Services, Dba110/01/2024
HY PE Structural Engineering109/21/2023
Jay Architect & Engineering108/29/2023
Asif Jamil, RA201/14/2021
Ashraf107/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KD Designs303/21/2026
Redcut Expediting603/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wifi ConstructionScaffold1407/08/2026
Pragmatic DevelopersGeneral Contractor809/18/2026
Plumbing P & HPlumbing407/08/2026
Core Scaffold SystemsScaffold408/26/2026
Tristate Fire SprinklersFire Protection207/08/2026
Pragmatic DevelopersScaffold204/09/2026
New American ConstructionScaffold107/08/2026
Bruche Mechanical NYFire Protection107/08/2026
KJK ElectricElectrical103/22/2026
Solas ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616504/23/2025
Building Lifecycle
All (143)Filed (11)Permit Issued (24)Signed Off (2)Violation (7)Inspection (1)Objection (68)Special Inspection (30)
09/17/2026
Permit issued — General Construction
B00913325-I1-GC
08/25/2026
Permit issued — Supported Scaffold
B01278500-I1-SF
08/17/2026
Permit issued — Sidewalk Shed
B01278496-I1-SH
06/10/2026
Permit issued — Sprinklers
B00913325-S3-EW-SP
12/09/2025
Permit issued — Plumbing
B00913325-S3-PL
10/17/2025
Permit issued — Construction Fence
B01118188-I1-FN
10/16/2025
Permit issued — General Construction
B00913325-I1-GC
08/28/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01278500-I1
08/28/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01278496-I1
08/28/2025
Permit issued — Sidewalk Shed
B01278496-I1-SH
08/28/2025
Permit issued — Supported Scaffold
B01278500-I1-SF
06/11/2025
Permit issued — Plumbing
B00913325-S3-EW-SP
05/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/12/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/12/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/12/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
04/23/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATIONS TO AN EXISTING 2-STORY & CELLAR COMMERCIAL BUILDING, CONVERTING INTO A 3-STORY COMMUNITY FACILITY BUILDING.
B00913325-P1
04/23/2025
Permit issued — Structural
B00913325-S1-ST
03/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/24/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
03/24/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/24/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
03/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
01/17/2025
Permit issued — General Construction
B00913325-I1-GC
12/06/2024
Permit issued — Sprinklers
B00913325-S3-EW-SP
12/06/2024
Permit issued — Sprinklers
B00913325-S3-PL
10/02/2024
Permit issued — Construction Fence
B01118188-I1-FN
10/01/2024
Filed — Alteration
Construction Fence as shown on drawings. No change in use egress or occupanny. We shall comply with chapter 33 of 2022 B.C
B01118188-I1
09/19/2024
Permit issued — General Construction
B00913325-I1-GC
09/16/2024
Permit issued — Mechanical Systems
B00913325-S4-MS
11/07/2023
Objection resolved — Addressed
11/07/2023
Objection resolved — Addressed
11/07/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
10/30/2023
Objection raised — Zoning
10/30/2023
Objection raised — Structural
10/30/2023
Objection raised — Scope
10/30/2023
Objection raised — Admin
10/30/2023
Objection raised — Structural
10/30/2023
Objection raised — Structural
10/30/2023
Objection raised — Fire_Protection
10/30/2023
Objection raised — Other
10/30/2023
Objection raised — Scope
10/30/2023
Objection raised — Structural
10/30/2023
Objection raised — Admin
10/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
10/24/2023
Objection resolved — Addressed
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPragmatic Developers09/17/2026
DOB NOWSupported ScaffoldPermit IssuedCore Scaffold Systems08/25/2026
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems08/17/2026
DOB NOWSprinklersPermit IssuedTristate Fire Sprinklers06/10/2026
DOB NOWPlumbingPermit IssuedPlumbing P & H12/09/2025
DOB NOWConstruction FencePermit IssuedPragmatic Developers10/17/2025
DOB NOWGeneral ConstructionPermit IssuedPragmatic Developers10/16/2025
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems08/28/2025
DOB NOWSupported ScaffoldPermit IssuedCore Scaffold Systems08/28/2025
DOB NOWSprinklersPermit IssuedTristate Fire Sprinkler06/11/2025
DOB NOWStructuralPermit IssuedPragmatic Developers04/23/2025
DOB NOWGeneral ConstructionPermit IssuedPragmatic Developers01/17/2025
DOB NOWSprinklersPermit IssuedBruche Mechanical NY12/06/2024
DOB NOWPlumbingPermit IssuedPlumbing P & H12/06/2024
DOB NOWConstruction FencePermit IssuedPragmatic Developers10/02/2024
DOB NOWGeneral ConstructionPermit IssuedPragmatic Developers09/19/2024
DOB NOWMechanical SystemsPermit IssuedPragmatic Developers09/16/2024
DOB NOWSupported ScaffoldSigned-offWifi Construction10/20/2020
DOB NOWSupported ScaffoldSigned-offWifi Construction10/20/2020
DOB NOWSupported ScaffoldSigned-offNew American Construction07/13/2020
DOB NOWSupported ScaffoldSigned-offWifi Construction03/04/2020
DOB NOWSidewalk ShedSigned-offWifi Construction03/03/2020
DOB NOWSupported ScaffoldSigned-offWifi Construction02/14/2020
DOB NOWSupported ScaffoldSigned-offWifi Construction02/14/2020
BIS—ISSUEDAlef Construction03/11/2021
BIS—ISSUEDAlef Construction02/22/2021
BISPLISSUEDPlumbing P & H12/21/2020
BIS—ISSUEDAlef Construction12/10/2020
BISEQISSUEDAlef Construction11/25/2020
BISEQISSUEDAlef Construction10/03/2019
BIS—ISSUEDAlef Construction10/03/2019
BIS—ISSUEDAlef Construction10/03/2019
BIS—ISSUEDL. Richards Plumbing and Heating05/09/1996
1 project · most recent 04/23/2025
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/23/2025Permit IssuedPragmatic DevelopersAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Daikin RK12NMVJU 10,900 BTU · Heat Pump Outdoor ×1
Heat / Cool
Daikin RXYQ120XATJA 129,000 BTU · Vrf Outdoor ×2
RXTQ48TAVJUA 52,000 BTU · Vrf Outdoor ×1
RXYQ96XATJA 103,000 BTU · Vrf Outdoor ×1
Lg ARUNO48GSS4 54,000 BTU · Vrf Outdoor ×3
Carrier 62XX20 600MBH GH 293,200 BTU ×1
Trane YSD180G3RHC 350,000 BTU · Rooftop Unit ×1
Ventilation
Greenheck CUBE-360XP-VGD 5,650 CFM · Exhaust Fan ×1
SQ-60-VG 40 CFM · Exhaust Fan ×1
1 project · most recent 04/23/2025
Sprinkler System
FiledStatusContractorScope
04/23/2025Permit IssuedTristate Fire SprinklerSprinkler System
1 project · most recent 04/23/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/23/2025Permit IssuedBruche Mechanical NYGas, Storm, Water/Sanitary
4 projects · most recent 08/27/2025
General Wiring
FiledStatusContractorScope
08/27/2025Permit IssuedSolas Electrical—
04/27/2021CompleteKJK ElectricGeneral Wiring
08/02/2020CompleteGrey Goose Electric—
02/07/2020CompleteTop Shelf Electric—
1 project · most recent 04/23/2025
Steel Concrete
FiledStatusContractorScope
04/23/2025Permit IssuedPragmatic DevelopersSteel, Concrete
3 projects · most recent 08/28/2025
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
08/28/2025Permit IssuedCore Scaffold SystemsSidewalk Shed
08/28/2025Permit IssuedCore Scaffold SystemsScaffold
10/01/2024Permit IssuedPragmatic DevelopersFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
05/12/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/12/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/12/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/12/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/12/2025Maintenance informationFAHAD FATEHenergy_progress
05/12/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/12/2025Sprinkler SystemsFAHAD FATEHspecial
03/24/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/24/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/24/2025Sprinkler SystemsFAHAD FATEHspecial
03/24/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
03/24/2025Maintenance informationFAHAD FATEHenergy_progress
03/24/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/24/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
10/30/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
10/13/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/13/2023Shutoff dampersFAHAD FATEHenergy_progress
10/13/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
10/13/2023Maintenance informationFAHAD FATEHenergy_progress
10/13/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
10/13/2023Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
10/13/2023Heating SystemsFAHAD FATEHspecial
10/13/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/21/2023Structural Steel - DetailsFAHAD FATEHspecial
09/21/2023Concrete - Cast-In-PlaceFAHAD FATEHspecial
Latest 25 of 33.
▾Documents — 233 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/26/2026B00913325-S3Request digital key ↗
08/26/2026B00913325-P1Request digital key ↗
08/26/2026B00913325-S4Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00368995-I1Request digital key ↗
▸Applications & Permits46
▸BISPLAN / WORK APPROVAL APPLICATION24
01/05/2022321378736Open ↗
07/16/2021301187230Open ↗
07/16/2021321378736Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION14
03/11/2021340772088Open ↗
02/24/2021321378736Open ↗
01/27/2021321378736Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
02/25/2020321378736Open ↗
09/20/2019321378736Open ↗
09/03/2019321378736Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
06/08/2021340772088Open ↗
05/20/2021321378736Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/10/2020340716657Open ↗
▸Zoning, Tax Lot & Property Records13
▸BISZONING DIAGRAM3
11/02/2020340772088Open ↗
10/26/2019321378736Open ↗
07/29/2016321378736Open ↗
▸BISVERIFY TAX LOT2
08/17/2021321378736Open ↗
08/17/2021340772088Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP2
08/17/2021321378736Open ↗
08/17/2021340772088Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/02/2020340772088Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/25/2016321378736Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/02/2020340772088Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00913325-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00913325-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00913325-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026B00368995-I1Open ↗
08/26/2026B00913325-S1Open ↗
08/26/2026B00913325-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
10/02/2026B00913325-S4Open ↗
10/02/2026B00913325-S4Open ↗
08/25/2026B00913325-S3Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
10/07/2019321378736Open ↗
10/07/2019321378736Open ↗
02/27/2017321378736Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
10/02/2026B00913325-S4Open ↗
08/25/2026B00913325-S3Open ↗
08/22/2026B00913325-P1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
10/07/2020340772088Open ↗
02/10/2020340716657Open ↗
08/30/2016340397412Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/07/2020340772088Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING6
07/16/2021321378736Open ↗
07/07/2021321378736Open ↗
06/30/2021321378736Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
09/09/2019321378736Open ↗
07/25/2016321378736Open ↗
07/25/2016321378736Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
09/21/2016321378736Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
08/24/2021321378736Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00913325-I1Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST5
11/18/2020340772088Open ↗
11/02/2020340772088Open ↗
02/28/2020340716657Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE SIGNOFF1
08/17/2021340772088Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/30/2020340772088Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00913325-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00913325-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/25/2016321378736Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
07/22/2021321378736Open ↗
07/22/2021340772088Open ↗
07/16/2021321378736Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/07/2019321378736Open ↗
02/27/2017321378736Open ↗
05/09/2016321378736Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/17/2021321378736Open ↗
08/17/2021340772088Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/07/2020340772088Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY12
07/22/2021321378736Open ↗
07/22/2021321378736Open ↗
07/22/2021321378736Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
11/30/2020340772088Open ↗
03/01/2017321378736Open ↗
03/01/2017321378736Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
11/02/2020340772088Open ↗
11/02/2020340772088Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
11/30/2020340772088Open ↗
03/01/2017321378736Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
08/17/2021340772088Open ↗
11/30/2020340772088Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT2
08/24/2021340772088Open ↗
08/17/2021321378736Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
11/18/2021321378736Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
07/26/2016321378736Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
09/21/2016321378736Open ↗
▸BISSOIL REPORT1
10/07/2020340772088Open ↗
▸Approvals, Objections & Sign-offs23
▸BISSCHEDULE A - OCCUPANCY / USE8
06/02/2021321378736Open ↗
05/27/2021321378736Open ↗
05/27/2021340772088Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026B00913325-S3Open ↗
08/13/2026B00913325-S4Open ↗
08/13/2026B00913325-S1Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/02/2020340772088Open ↗
12/02/2020340772088Open ↗
12/02/2020321378736Open ↗
▸BISBPP: FINAL SIGNOFF2
08/26/2021340772088Open ↗
08/26/2021321378736Open ↗
▸BISSUPERSEDING LETTER2
02/24/2021321378736Open ↗
08/20/2019321378736Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/15/2021340716657Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/02/2020321378736Open ↗
▸Cost, Insurance & Ownership12
▸BISPROJECT-SPECIFIC GL INSURANCE5
12/22/2020340772088Open ↗
12/11/2020321378736Open ↗
11/30/2020340772088Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT3
07/15/2020321378736Open ↗
10/07/2019321378736Open ↗
05/09/2016321378736Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
12/18/2020340772088Open ↗
11/30/2020340772088Open ↗
08/20/2019321378736Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
12/18/2020340772088Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION12
06/17/2021340772088Open ↗
12/22/2020340772088Open ↗
12/02/2020321378736Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET3
09/19/2016321378736Open ↗
07/25/2016321378736Open ↗
05/09/2016321378736Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
10/07/2020340772088Open ↗
02/10/2020340716657Open ↗
08/30/2016340397412Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/10/2020340716657Open ↗
▸BISBOROUGH INTAKE FORM1
12/18/2020321378736Open ↗
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
07/15/2020321378736Open ↗
07/15/2020321378736Open ↗
03/01/2017321378736Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM2
07/25/2016321378736Open ↗
05/09/2016321378736Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/07/2020340772088Open ↗
▸DOB NOWProperty Ownership Certification1
08/26/2026B00913325-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00913325-S1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00913325-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00913325-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00913325-I1Open ↗