← Back
Condo, residential unit, 1-3 unit building (orig. class 1)
1568 38TH STREET
BROOKLYN · Borough Park · BIN 3125856
💬 Discuss this project
1930Year Built
3Stories
R6Building Class
R6Zoning
5,137 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Condo, residential unit, 1-3 unit building (orig. class 1) · 1,940 sf lot · 2.65 FAR built · Flood zone X
Locations of Work
Fire Protection
Roof3p · 1 filing · 8 docs
Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WJP BUILDERS1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EYAL LEVITT ARCHITECT PC205/04/2022
DAVID SILBERMAN, P.E.204/02/2020
ASHER ARCHITECT111/26/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERETZ BUILDERS ASSISTANCE.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WJP BUILDERS CORPGeneral Contractor907/08/2026
ORBIT SPRINKLERPlumbing303/22/2026
ORBIT PLBG & HTG INCPlumbing203/22/2026
ASHER HERSHKOWITZElectrical103/21/2026
CAPORASO & SONS PLBG INCElectrical103/21/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-TECH ENGINEERING, P.C.6659205/04/2022
GREENLINE DEVELOPERS, LLC3447104/02/2020
IP CONCRETE TESTING AND I6252108/07/2019
Building Lifecycle
All (75)Filed (5)Permit Issued (6)Signed Off (3)Violation (17)Inspection (2)Objection (22)Special Inspection (20)
05/23/2022
Signed off — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13R 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION WITH NYC DOB ALT-1 JOB#: 321949086.
B00529755-I1
05/11/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/05/2022
Special inspection requirement — Sprinkler Systems
ALBERTO ROMAN
05/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
05/04/2022
Filed — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13R 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION WITH NYC DOB ALT-1 JOB#: 321949086.
B00529755-P1
04/27/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/13/2022
Signed off — Alteration
VERTICAL AND HORIZONTAL ENLARGEMENT TO EXISTING 2 STORY AND CELLAR.
B00203292-I1
04/13/2022
Signed off — Alteration
B00271954-I1
04/12/2022
Permit issued — Structural
B00203292-I1-ST
04/08/2022
Permit issued — Sprinklers
B00529755-I1-EW-SP
02/10/2022
Permit issued — Construction Fence
B00271954-I1-FN
02/10/2022
Violation issued (ECB, closed)
Construction
02/10/2022
Violation issued (ECB, closed)
Unknown
12/14/2021
Violation issued (ECB, closed)
Construction
12/14/2021
Violation issued (ECB, closed)
Unknown
12/14/2021
Violation issued (ECB, closed)
Construction
12/14/2021
Violation issued (ECB, closed)
Construction
12/14/2021
Violation issued (ECB, closed)
Unknown
12/14/2021
Violation issued (ECB, closed)
Unknown
12/14/2021
Violation issued (ECB, closed)
Construction
06/01/2021
Filed — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13R 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION WITH NYC DOB ALT-1 JOB#: 321949086.
B00529755-I1
05/18/2021
Violation issued (ECB, closed)
Construction
03/02/2021
Permit issued — Construction Fence
B00271954-I1-FN
04/30/2020
Special inspection requirement — Final
NAVEEN KUMAR
04/30/2020
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
04/30/2020
Special inspection requirement — Structural Cold-Formed Steel
INDARDEO PARBHUNATH
04/30/2020
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
04/30/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
04/30/2020
Special inspection requirement — Concrete - Cast-In-Place
INDARDEO PARBHUNATH
04/30/2020
Special inspection requirement — Structural Steel - Details
INDARDEO PARBHUNATH
04/30/2020
Special inspection requirement — Structural Steel - High Strength Bolting
INDARDEO PARBHUNATH
04/30/2020
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
04/27/2020
Objection resolved — Addressed
04/08/2020
Objection raised — Admin
04/02/2020
Filed — Alteration
VERTICAL AND HORIZONTAL ENLARGEMENT TO EXISTING 2 STORY AND CELLAR.
B00203292-P1
04/02/2020
Special inspection requirement — Concrete - Cast-In-Place
DAVID SILBERMAN
04/02/2020
Special inspection requirement — Structural Cold-Formed Steel
DAVID SILBERMAN
04/02/2020
Special inspection requirement — Structural Stability – Alterations of existing buildings
DAVID SILBERMAN
04/02/2020
Special inspection requirement — Structural Steel - Details
DAVID SILBERMAN
04/02/2020
Special inspection requirement — Structural Steel - High Strength Bolting
DAVID SILBERMAN
04/02/2020
Special inspection requirement — Final
DAVID SILBERMAN
04/02/2020
Special inspection requirement — Fire-Resistance Rated Construction
DAVID SILBERMAN
04/02/2020
Special inspection requirement — Masonry
DAVID SILBERMAN
04/02/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID SILBERMAN
03/12/2020
Violation issued (ECB, closed)
Construction
03/12/2020
Violation issued (ECB, closed)
Site Safety
03/11/2020
Violation issued (ECB, closed)
Construction
03/11/2020
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
03/11/2020
Violation issued (ECB, closed)
Construction
03/11/2020
Violation issued (ECB, closed)
Unknown
03/11/2020
Violation issued (ECB, closed)
Construction
03/04/2020
Permit issued — Construction Fence
B00271954-I1-FN
12/02/2019
Permit issued — Construction Fence
B00271954-I1-FN
11/26/2019
Filed — Alteration
B00271954-I1
10/23/2019
Objection resolved — Addressed
09/20/2019
Objection resolved — Addressed
09/20/2019
Objection resolved — Addressed
09/20/2019
Objection resolved — Addressed
09/20/2019
Objection resolved — Addressed
09/20/2019
Objection resolved — Addressed
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offWJP BUILDERS CORP04/12/2022
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP04/08/2022
DOB NOWConstruction FenceSigned-offWJP BUILDERS CORP02/10/2022
DOB NOWConstruction FenceSigned-offWJP BUILDERS CORP03/02/2021
DOB NOWConstruction FenceSigned-offWJP BUILDERS CORP03/04/2020
DOB NOWConstruction FenceSigned-offWJP BUILDERS CORP12/02/2019
BISPLISSUEDORBIT PLBG & HTG INC06/14/2022
2 projects · most recent 10/31/2022
General Wiring
FiledStatusContractorScope
10/31/2022CompleteKINGS ELECTRIC CO., INC.General Wiring
10/31/2022CompleteKINGS ELECTRIC CO., INC.4 meters, 4 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/11/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/27/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/05/2022Sprinkler SystemsALBERTO ROMANspecial
05/05/2022Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
04/30/2020FinalNAVEEN KUMARprogress
04/30/2020MasonryINDARDEO PARBHUNATHspecial
04/30/2020Structural Cold-Formed SteelINDARDEO PARBHUNATHspecial
04/30/2020Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
04/30/2020Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
04/30/2020Concrete - Cast-In-PlaceINDARDEO PARBHUNATHspecial
04/30/2020Structural Steel - DetailsINDARDEO PARBHUNATHspecial
04/30/2020Structural Steel - High Strength BoltingINDARDEO PARBHUNATHspecial
04/30/2020Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
04/02/2020Concrete - Cast-In-PlaceDAVID SILBERMANspecial
04/02/2020Structural Cold-Formed SteelDAVID SILBERMANspecial
04/02/2020Structural Stability – Alterations of existing buildingsDAVID SILBERMANspecial
04/02/2020Structural Steel - DetailsDAVID SILBERMANspecial
04/02/2020Structural Steel - High Strength BoltingDAVID SILBERMANspecial
04/02/2020FinalDAVID SILBERMANprogress
04/02/2020Fire-Resistance Rated ConstructionDAVID SILBERMANprogress
04/02/2020MasonryDAVID SILBERMANspecial
04/02/2020Fire-Resistant Penetrations and JointsDAVID SILBERMANspecial
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch2
09/01/2026B00529755-P1Request digital key ↗
09/01/2026B00529755-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/15/2026B00203292-P1Request digital key ↗
08/14/2026B00203292-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00271954-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION10
12/07/2022321949086Open ↗
07/07/2022321949086Open ↗
07/05/2022321949086Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION5
05/18/2021321949086Open ↗
09/14/2020321949086Open ↗
03/05/2020321949086Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/14/2022321949086Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING EXHIBIT I: CERTIFICATION2
11/08/2021322101505Open ↗
06/28/2019321949086Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/30/2019321949086Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/14/2022321949086Open ↗
▸BISZONING DIAGRAM1
10/29/2019321949086Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/28/2019321949086Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/08/2021322101505Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/08/2021322101505Open ↗
▸BISVERIFY TAX LOT1
04/07/2022321949086Open ↗
▸Seals & Professional Certifications28
▸DOB NOWSpecial Inspector Seal & Signature16
08/29/2026B00203292-P1Open ↗
08/29/2026B00203292-P1Open ↗
08/29/2026B00203292-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00529755-P1Open ↗
09/01/2026B00529755-I1Open ↗
08/13/2026B00203292-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026B00203292-P1Open ↗
08/29/2026B00203292-P1Open ↗
08/25/2026B00203292-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/17/2019321949086Open ↗
08/08/2019321949086Open ↗
05/30/2019321949086Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING3
06/30/2021321949086Open ↗
06/29/2021321949086Open ↗
06/21/2021321949086Open ↗
▸BISWATER CUT-OFF1
08/29/2019321949086Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/30/2019321949086Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/08/2022321949086Open ↗
▸Safety & Tenant Protection7
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
12/17/2019321949086Open ↗
12/17/2019321949086Open ↗
12/17/2019321949086Open ↗
▸BISSTREET TREE CHECKLIST1
05/30/2019321949086Open ↗
▸BISSTREET TREE SIGNOFF1
04/13/2022321949086Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/17/2019321949086Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/17/2019321949086Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00529755-P1Open ↗
09/01/2026B00529755-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/17/2019321949086Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/17/2019321949086Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00203292-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/14/2022321949086Open ↗
02/14/2022321949086Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/30/2019321949086Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/14/2022321949086Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/14/2022321949086Open ↗
02/14/2022321949086Open ↗
▸BISSOIL REPORT1
08/08/2019321949086Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION4
11/08/2021322101505Open ↗
11/08/2021322101505Open ↗
11/08/2021322101505Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
07/07/2022321949086Open ↗
07/05/2022321949086Open ↗
05/30/2019321949086Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT2
08/08/2019321949086Open ↗
05/30/2019321949086Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
03/05/2020321949086Open ↗
12/17/2019321949086Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
03/05/2020321949086Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/14/2022321949086Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION5
12/07/2022321949086Open ↗
07/13/2022321949086Open ↗
07/27/2021321949086Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
11/01/2021322101505Open ↗
05/30/2019321949086Open ↗
▸Other Documents5
▸BISPLOT DIAGRAM2
11/08/2021322101505Open ↗
05/30/2019321949086Open ↗
▸BISSURVEY1
12/07/2022321949086Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
03/05/2020321949086Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/14/2022321949086Open ↗