← Back
MANHATTAN
1568 AIR BROADWAY
MANHATTAN · BIN 1085494
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Rent Stabilized0 Open ViolationsFISP: SAFE
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Bulkhead1p · 1 filing · 3 docs
Floor 481p · 1 filing · 3 docs
Floor 473p · 2 filings · 6 docs
Floor 462p · 2 filings · 5 docs
Floor 452p · 2 filings · 5 docs
Floor 442p · 2 filings · 5 docs
Floor 432p · 2 filings · 5 docs
Floor 422p · 2 filings · 5 docs
Floor 412p · 2 filings · 5 docs
Floor 402p · 2 filings · 5 docs
Floor 392p · 2 filings · 5 docs
Floor 382p · 2 filings · 5 docs
Floor 372p · 2 filings · 5 docs
Floor 362p · 2 filings · 5 docs
Floor 352p · 2 filings · 5 docs
Floor 342p · 2 filings · 5 docs
Floor 332p · 2 filings · 5 docs
Floor 322p · 2 filings · 5 docs
Floor 312p · 2 filings · 5 docs
Floor 302p · 2 filings · 5 docs
Floor 292p · 2 filings · 5 docs
Floor 282p · 2 filings · 5 docs
Floor 272p · 2 filings · 5 docs
Floor 262p · 2 filings · 5 docs
Floor 252p · 2 filings · 5 docs
Floor 242p · 2 filings · 5 docs
Floor 232p · 2 filings · 5 docs
Floor 222p · 2 filings · 5 docs
Floor 212p · 2 filings · 5 docs
Floor 202p · 2 filings · 5 docs
Floor 192p · 2 filings · 5 docs
Floor 182p · 2 filings · 5 docs
Floor 172p · 2 filings · 5 docs
Floor 162p · 2 filings · 5 docs
Floor 152p · 2 filings · 11 docs
Floor 143p · 3 filings · 17 docs
Floor 1310p · 6 filings · 20 docs
Floor 124p · 4 filings · 20 docs
Floor 117p · 8 filings · 20 docs
Floor 102p · 2 filings · 11 docs
Floor 93p · 3 filings · 13 docs
Floor 82p · 2 filings · 11 docs
Floor 72p · 2 filings · 11 docs
Floor 62p · 2 filings · 11 docs
Floor 52p · 2 filings · 11 docs
Floor 42p · 2 filings · 11 docs
Floor 32p · 2 filings · 11 docs
Floor 22p · 2 filings · 11 docs
Floor 12p · 2 filings · 11 docs
Sub-Cellar3p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TIMES SQUARE HOTEL OWNER, LLC43407/08/2026
SL GREEN507/08/2026
1568 BROADWAY ASSOCIATES103/21/2026
DOUBLETREE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP1503/21/2026
A1 EXPEDITING SERVICE4203/21/2026
MRA ENGINEERING P C803/21/2026
HOWARD I SHAPIRO ASSOCIATES803/21/2026
LOUIS STRIAR403/21/2026
D R BROWN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAFWAY ATLANTIC, LLCGeneral Contractor16707/08/2026
A M A HOLDINGSScaffold6807/08/2026
LANDMARK SIGNS ELECL MAScaffold6807/08/2026
GAMMA USA INCGeneral Contractor2507/08/2026
LANDMARK SIGNS ELEC MAIScaffold2307/08/2026
INTERBORO SIGN ELECL MAIScaffold2207/08/2026
SANSI NORTH AMERICA LLCGeneral Contractor2007/08/2026
PAVARINI MCGOVERN LLCGeneral Contractor1907/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection1407/08/2026
BALATON CONSULTING LLCScaffold1107/08/2026
LANDMARK SIGN & ELECTRICALGeneral Contractor707/08/2026
PACE PLUMBING CORPPlumbing507/08/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor404/09/2026
A.M.A. HOLDINGS INCGeneral Contractor407/08/2026
YORK SCAFFOLD EQUIPMENT CORP.General Contractor307/08/2026
INTERBORO SIGN & MAINTENANCEGeneral Contractor307/08/2026
NORTH SHORE NEON SIGN LLCGeneral Contractor207/08/2026
ULTIMATE SIGNS DESIGNSScaffold207/08/2026
MARTIN ASSOCIATES INCGeneral Contractor107/08/2026
CORPORATE ELEC. GROUP INCElectrical103/22/2026
POLARIS ELEC'L CONST CORPElectrical103/22/2026
STANDARD FIRE PROTECT LLCFire Protection107/08/2026
COAST TO COAST PERMITSLLCGeneral Contractor107/08/2026
COIRO JOSEPHGeneral Contractor103/21/2026
HOME CRAFTS, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADG ACHITECTURE AND DESIG3044110/25/2024
CODEGREEN510107/01/2024
MT GROUP798608/31/2023
ROBERT F. GERMAIN JR. PE5100106/20/2023
BAZINI ENGINEERING, P.C.1808112/08/2022
HANSEN ENGINEERING PC8174110/26/2022
Building Lifecycle
All (196)Filed (45)Permit Issued (80)Signed Off (28)Facade (FISP) (10)Inspection (4)Objection (2)Special Inspection (27)
12/11/2025
Signed off — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE IN SIDEWALK/ROADWAY.
M00874352-I1
12/11/2025
Signed off — Alteration
M08015637-I1
02/06/2025
Signed off — Alteration
Installation and use of Building Maintenance Unit (BMU) for window facade panels, replacement, repair, or other construction use as per plans filed herewith.
M00745808-I1
11/06/2024
Signed off — Alteration
Temporary Installations to be used on a temporary even "KILN event". All installation shall be removed upon completion of the event,
M01132357-I1
11/01/2024
Permit issued — General Construction
M01132357-I1-GC
10/25/2024
Filed — Alteration
Temporary Installations to be used on a temporary even "KILN event". All installation shall be removed upon completion of the event,
M01132357-I1
10/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Carrano
10/24/2024
Special inspection requirement — Final
Christopher Carrano
09/09/2024
Signed off — Alteration
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01053300-I1
07/16/2024
Permit issued — Mechanical Systems
M01053300-I1-MS
07/02/2024
Signed off — Alteration
M07993781-I1
07/01/2024
Filed — Alteration
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01053300-I1
06/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
HATIM ELSAID
06/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
HATIM ELSAID
06/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
HATIM ELSAID
06/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
HATIM ELSAID
06/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
05/17/2024
Special inspection requirement — Final
HATIM ELSAID
05/17/2024
Special inspection requirement — Mechanical Systems
HATIM ELSAID
04/25/2024
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00869553-I1
03/19/2024
Signed off — Alteration
Structural support of trolley beams and acoustical soffit in the areas around the dynamic stage door below the fifth floor steel for the terrace structure. No change of use, egress or occupancy
M00665583-I1
01/23/2024
Signed off — Alteration
General construction for temporary installation of terrace screens on the 11th floor.
M00905282-I1
01/05/2024
Permit issued — Protection and Mechanical Methods
M00745808-I1-PM
01/04/2024
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00869553-P2
12/26/2023
Signed off — Alteration
Modifications of dry standpipe for building core and shell taking place on sub cellar, cellar, 1-48 as per drawings filed herewith. No change in use, egress or occupancy.
M00639031-I1
12/26/2023
Signed off — Alteration
Modifications of dry standpipe for theater taking place on sub cellar, cellar, floors 1 - 7 as per drawings filed herewith. No change in use, egress or occupancy.
M00636851-I1
12/06/2023
Signed off — Alteration
TEMPORARY OVERHEAD PROTECTION AT ALLEYWAY DURING BUILDING ALTERATION FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00874350-I1
12/06/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTY (155 WEST 46 STREET) DURING BLDG ALTERATION, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00680444-I1
11/22/2023
Signed off — Alteration
M08024075-I1
11/20/2023
Signed off — Alteration
SOUTH VAULT: TEMPORARY SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00593491-I1
11/20/2023
Signed off — Alteration
M00653217-I1
11/20/2023
Signed off — Alteration
EAST ALLEY: TEMPORARY SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00593511-I1
11/20/2023
Signed off — Alteration
M00816222-I1
11/20/2023
Signed off — Alteration
TEMPORARY STORAGE ON TOP OF OVERHEAD PROTECTION AT 9TH FLOOR AS PER PLANS. OVERHEAD PROTECTION FILED SEPARATELY UNDER APPLICATION # M00816222. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00823597-I1
11/20/2023
Signed off — Alteration
M00663088-I1
11/14/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00869553-P1
11/14/2023
Filed — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE IN SIDEWALK/ROADWAY.
M00874352-P1
11/06/2023
Filed — Alteration
Installation and use of Building Maintenance Unit (BMU) for window facade panels, replacement, repair, or other construction use as per plans filed herewith.
M00745808-P1
10/06/2023
Permit issued — General Construction
M00905282-I1-GC
09/28/2023
Permit issued — Sidewalk Shed
M00869553-I1-SH
09/27/2023
Permit issued — Protection and Mechanical Methods
M00874350-I1-PMM
09/27/2023
Permit issued — Protection and Mechanical Methods
M00680444-I1-PM
09/27/2023
Permit issued — Construction Fence
M00874352-I1-FN
09/27/2023
Permit issued — Protection and Mechanical Methods
M00816222-I1-PMM
09/15/2023
Filed — No Work
M00933193-I1
09/14/2023
Filed — No Work
M00933188-I1
08/31/2023
Filed — Alteration
General construction for temporary installation of terrace screens on the 11th floor.
M00905282-I1
08/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
Marisa Harte
08/11/2023
Signed off — Alteration
M00831116-I1
08/09/2023
Signed off — Alteration
M00886486-I1
08/09/2023
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON FACE OF MARQUEE PERMITTED UNDER JOB NO: 14101935 - TEMPO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00886483-I1
08/09/2023
Permit issued — Sign
M00352572-I1-SG
08/09/2023
Permit issued — Sign
M00352523-I1-SG
08/09/2023
Permit issued — Sign
M00352583-I1-SG
08/09/2023
Permit issued — Sign
M00352922-I1-SG
08/09/2023
Permit issued — Sign
M00352498-I1-SG
08/09/2023
Permit issued — Sign
M00352510-I1-SG
08/09/2023
Permit issued — Sign
M00352599-I1-SG
08/09/2023
Permit issued — Sign
M00352547-I1-SG
08/09/2023
Permit issued — Sign
M00352604-I1-SG
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCOAST TO COAST PERMITSLLC11/01/2024
DOB NOWMechanical SystemsSigned-offMARTIN ASSOCIATES INC07/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offPAVARINI MCGOVERN LLC01/05/2024
DOB NOWGeneral ConstructionSigned-offPAVARINI MCGOVERN LLC10/06/2023
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC09/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC09/27/2023
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC09/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC09/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC09/27/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO08/09/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO08/09/2023
DOB NOWStructuralSigned-offNORTH SHORE NEON SIGN LLC08/09/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO08/09/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO08/09/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO08/09/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO08/09/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO08/09/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO08/09/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO08/09/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO08/09/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO08/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC08/01/2023
DOB NOWStructuralSigned-offSANSI NORTH AMERICA LLC07/12/2023
DOB NOWStructuralSigned-offSANSI NORTH AMERICA LLC07/12/2023
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO06/26/2023
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO06/26/2023
DOB NOWGeneral ConstructionSigned-offHOME CRAFTS06/22/2023
DOB NOWProtection and Mechanical MethodsSigned-offPAVARINI MCGOVERN LLC06/15/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC05/15/2023
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC05/13/2023
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC05/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offGAMMA USA INC05/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offGAMMA USA INC05/01/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedGAMMA USA INC05/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC03/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC02/04/2023
DOB NOWStructuralSigned-offSANSI NORTH AMERICA LLC01/31/2023
DOB NOWStructuralSigned-offSANSI NORTH AMERICA LLC01/31/2023
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC01/25/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC01/24/2023
+ 15 more permits on file
25 projects · most recent 04/10/2024
General Wiring
FiledStatusContractorScope
04/10/2024CompleteCITY ELEC'L SIGN ERECTORS—
12/18/2023CompleteB & G ELECL CONTR OF NY IGeneral Wiring
12/18/2023CompleteCITY ELEC'L SIGN ERECTORS—
04/30/2023CancelledA.M.A HOLDINGS INC.D/B/A—
04/30/2023CancelledA.M.A HOLDINGS INC.D/B/A—
08/05/2022CompleteA.M.A HOLDINGS INC.D/B/A—
08/05/2022CompleteA.M.A HOLDINGS INC.D/B/A—
07/17/2022CompleteA.M.A HOLDINGS INC.D/B/A—
06/30/2022CompleteCORPORATE ELEC. GROUP INC—
02/08/2022Permit IssuedS. J. ELECTRIC INC.General Wiring
02/08/2022CompleteS. J. ELECTRIC INC.—
09/09/2021CancelledLANDMARK SIGNS & ELEC'L—
05/07/2021CancelledLANDMARK SIGNS & ELEC'L—
05/07/2021CancelledLANDMARK SIGNS & ELEC'L—
05/03/2021CancelledLANDMARK SIGNS & ELEC'L—
1 project · most recent 11/30/2021
FiledStatusContractorScope
11/30/2021——2 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/20/2023Pass-Final Boiler Equipment InspectionPassView ↗
12/19/2022Pass-Final Boiler Equipment InspectionPassView ↗
01/07/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
01/03/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
10/24/2024Tenant Protection Plan ComplianceChristopher Carranospecial
10/24/2024FinalChristopher Carranoprogress
06/26/2024HVAC-R and service water heating equipmentHATIM ELSAIDenergy_progress
06/26/2024HVAC-R and service water piping design and insulationHATIM ELSAIDenergy_progress
06/26/2024HVAC-R and service water heating system controlsHATIM ELSAIDenergy_progress
06/18/2024Tenant Protection Plan ComplianceHATIM ELSAIDspecial
06/18/2024Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
05/17/2024FinalHATIM ELSAIDprogress
05/17/2024Mechanical SystemsHATIM ELSAIDspecial
08/25/2023Tenant Protection Plan ComplianceMarisa Hartespecial
08/08/2023Wall Panels, Curtain Walls, and VeneersMarisa Hartespecial
08/08/2023Mastic and Intumescent Fire-resistant CoatingsMarisa Hartespecial
08/08/2023Sprayed fire-resistant materialsMarisa Hartespecial
07/17/2023FinalMarisa Harteprogress
06/23/2023FinalINDRAJEET VAGHAprogress
11/02/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
09/21/2022Public Assembly Emergency LightingMarisa Harteprogress
01/20/2022Structural Steel - High Strength BoltingMarisa Hartespecial
01/20/2022Structural Steel - DetailsMarisa Hartespecial
01/20/2022FinalJAMIE DAVISprogress
01/20/2022Structural Steel - WeldingMarisa Hartespecial
12/20/2021Fire-Resistant Penetrations and JointsMarisa Hartespecial
11/30/2021Structural Steel - WeldingMarisa Hartespecial
11/30/2021FinalJames Scheldprogress
11/29/2021FinalJames Scheldprogress
Latest 25 of 27.
▾Documents — 124 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch39
09/03/2026M00593491-I1Request digital key ↗
09/03/2026M00593511-I1Request digital key ↗
09/03/2026M00634775-I1Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly4
08/30/2026M00900579-I1Request digital key ↗
08/29/2026M00902984-I1Request digital key ↗
08/29/2026M00933188-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
09/01/2026M08007648-I1Request digital key ↗
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature46
09/03/2026M00637014-P1Open ↗
09/03/2026M00637014-I1Open ↗
09/03/2026M00653217-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M08032953-I1Open ↗
09/18/2026M00636851-I1Open ↗
09/18/2026M00636851-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/30/2026M00637014-P1Open ↗
08/29/2026M00886483-I1Open ↗
08/28/2026M00905282-I1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00637014-P1Open ↗
09/03/2026M00637014-I1Open ↗
08/23/2026M01040077-I1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M08024075-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M07995761-P1Open ↗