Roof3 filings · 6 docs
MechanicalStructural
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods
Installation and use of Building Maintenance Unit (BMU) for window facade panels, replacement, repair, or other construction use as per plans filed herewith.
On file for this project
4 documents
INSTALLATION OF TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTY (155 WEST 46 STREET) DURING BLDG ALTERATION, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Floor 472p · 1 filing
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods · Standpipe
INSTALLATION OF 4 GAS BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
3 documents · 2 drawing sheets
Floor 461 filing · 2 docs
ArchitectureEquipmentFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALL (1) NEW GAS FIRED DIRECT VENT FIREPLACE WITH NEW DOUBLEWALL FLUE AND EXHAUSTO IN CONJUNCTION WITH ALT 121191236. ALL STRUCTURAL DETAILS, SUPPORTS AND GAS PIPING UNDER 121191236. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this project
2 documents
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 141p · 1 filing
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods · Standpipe · Supported Scaffold
Mechanical modifications taking place in sub-cellar and floors 12 through 14 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 138p · 4 filings
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods · Standpipe · Supported Scaffold
No filed description on record for this project.
On file for this project
11 documents · 5 drawing sheets
Mechanical modifications taking place in sub-cellar and floors 12 through 14 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON THE 12TH AND 13TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 122p · 2 filings
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods · Standpipe · Supported Scaffold
Mechanical modifications taking place in sub-cellar and floors 12 through 14 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON THE 12TH AND 13TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Floor 114p · 6 filings · 17 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Protection and Mechanical Methods · Standpipe · Supported Scaffold
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
General construction for temporary installation of terrace screens on the 11th floor.
On file for this project
5 documents
No filed description on record for this project.
On file for this project
2 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 101 filing
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods · Standpipe · Supported Scaffold
NORTH & SOUTH TRUSS DEMO SCAFFOLD: INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Floor 91p · 3 filings · 2 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods · Standpipe · Supported Scaffold
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING BLDG ALTERATION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
TEMPORARY STORAGE ON TOP OF OVERHEAD PROTECTION AT 9TH FLOOR AS PER PLANS. OVERHEAD PROTECTION FILED SEPARATELY UNDER APPLICATION # M00816222. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
NORTH & SOUTH TRUSS DEMO SCAFFOLD: INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Floor 84 filings
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
TEMPORARY DRY STANDPIPE WITH AIR COMPRESSOR AND SUPERVISORY ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH ALT-1 JOB # 121191236.
On file for this project
5 documents
Sprinkler modifications taking place on floors 2- 8 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
13 documents
NORTH & SOUTH TRUSS DEMO SCAFFOLD: INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 76 filings · 9 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
TEMPORARY DRY STANDPIPE WITH AIR COMPRESSOR AND SUPERVISORY ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH ALT-1 JOB # 121191236.
On file for this project
5 documents
Modifications of dry standpipe for theater taking place on sub cellar, cellar, floors 1 - 7 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
Mechanical modifications taking place on the sub-cellar, cellar and floors 1-7 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
64 documents
Latest 3 of 6 filings on this floor.
Floor 67 filings · 9 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
TEMPORARY DRY STANDPIPE WITH AIR COMPRESSOR AND SUPERVISORY ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH ALT-1 JOB # 121191236.
On file for this project
5 documents
Modifications of dry standpipe for theater taking place on sub cellar, cellar, floors 1 - 7 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
Mechanical modifications taking place on the sub-cellar, cellar and floors 1-7 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
64 documents
Latest 3 of 7 filings on this floor.
Floor 511 filings · 10 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Standpipe · Supported Scaffold
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON FACE OF MARQUEE PERMITTED UNDER JOB NO: 14101935 - TEMPO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON FACE OF MARQUEE PERMITTED UNDER JOB NO: 14101935 - TEMPO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
TEMPORARY DRY STANDPIPE WITH AIR COMPRESSOR AND SUPERVISORY ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH ALT-1 JOB # 121191236.
On file for this project
5 documents
Latest 3 of 11 filings on this floor.
Floor 412 filings · 10 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Standpipe · Supported Scaffold
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON FACE OF MARQUEE PERMITTED UNDER JOB NO: 14101935 - TEMPO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON FACE OF MARQUEE PERMITTED UNDER JOB NO: 14101935 - TEMPO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
TEMPORARY DRY STANDPIPE WITH AIR COMPRESSOR AND SUPERVISORY ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH ALT-1 JOB # 121191236.
On file for this project
5 documents
Latest 3 of 12 filings on this floor.
Floor 315 filings · 13 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Standpipe · Structural · Supported Scaffold
Temporary Installations to be used on a temporary even KILN event. All installation shall be removed upon completion of the event,
On file for this project
4 documents
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
4 documents
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON FACE OF MARQUEE PERMITTED UNDER JOB NO: 14101935 - TEMPO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 15 filings on this floor.
Floor 212 filings · 9 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Standpipe · Supported Scaffold
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON FACE OF MARQUEE PERMITTED UNDER JOB NO: 14101935 - TEMPO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON FACE OF MARQUEE PERMITTED UNDER JOB NO: 14101935 - TEMPO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Modifications of dry standpipe for theater taking place on sub cellar, cellar, floors 1 - 7 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 12 filings on this floor.
Floor 111 filings · 12 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Standpipe · Supported Scaffold
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON FACE OF MARQUEE PERMITTED UNDER JOB NO: 14101935 - TEMPO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON FACE OF MARQUEE PERMITTED UNDER JOB NO: 14101935 - TEMPO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
TEMPORARY SHORING AS PER DRAWINGS AT 1ST FLOOR SW CORNER. SHORING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Latest 3 of 11 filings on this floor.
Cellar7 filings · 14 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
TEMPORARY DRY STANDPIPE WITH AIR COMPRESSOR AND SUPERVISORY ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH ALT-1 JOB # 121191236.
On file for this project
5 documents
Modifications of dry standpipe for theater taking place on sub cellar, cellar, floors 1 - 7 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
Mechanical modifications taking place on the sub-cellar, cellar and floors 1-7 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
64 documents
Latest 3 of 7 filings on this floor.
Sub-Cellar2p · 6 filings · 14 docs
ElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Standpipe · Structural
Modifications of dry standpipe for theater taking place on sub cellar, cellar, floors 1 - 7 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
Mechanical modifications taking place on the sub-cellar, cellar and floors 1-7 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
64 documents
Plumbing modifications taking place on the sub-cellar, cellar, floors 1-7 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
9 documents
Latest 3 of 6 filings on this floor.
Site & exterior25 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Sign · Structural · Supported Scaffold
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
6 documents · 12 drawing sheets
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE IN SIDEWALK/ROADWAY.
On file for this project
4 documents · 6 drawing sheets
TEMPORARY OVERHEAD PROTECTION AT ALLEYWAY DURING BUILDING ALTERATION FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 25 filings on this floor.
Filed — no permit issued2 filings · 12 docs
ArchitectureGeneralStructural
No filed description on record for this project.
On file for this project
2 documents · 5 drawing sheets
INSTALLATION OF TEMPORARY SHORING TO FACILITATE CONCRETE COLUMN DEMOLITION AS PER PLANS FILED HEREWITH.
On file for this project
10 documents · 12 drawing sheets