← Back
Primarily 1 family with 2 stores or offices
157-08 45 AVENUE
QUEENS · BIN 4123031
💬 Discuss this project
1931Year Built
2Stories
S0Building Class
R4-1Zoning
2,200 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 1 family with 2 stores or offices · Owner of record: WX&YY LLC · 4,000 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 22p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
1 job · most recent 05/07/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2026Signed-offCS RENOVATION INCAir Conditioning Systems, Ventilation Systems
Cooling
Gree LIV09HP115V1R32AH 9,000 BTU · Ahu ×12
LIV09HP115V1R32AO 9,000 BTU · Condensing Unit ×12
Ventilation
Panasonic FV-0510VSL1 50 CFM · Exhaust Fan ×32
1 job · most recent 05/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/07/2026Signed-offTRI STATE PLBG & HTG INCGas, Water/Sanitary
2 jobs · most recent 06/08/2026
General Wiring
FiledStatusContractorScope
06/08/2026CompleteACCORD POWER ELECTRIC LLC—
12/05/2025CompleteGOODALL ELECTRIC CORPGeneral Wiring
1 job · most recent 05/07/2026
Wood
FiledStatusContractorScope
05/07/2026Signed-offCS RENOVATION INCWood
1 job · most recent 06/03/2026
FiledStatusContractorScope
06/03/2026Signed-offACCORD POWER INC10 panels, 4.4 kw, 1,717.83 roof_area_sqft
Building Lifecycle
All (74)Filed (10)Permit Issued (8)Signed Off (4)Violation (1)Inspection (9)Objection (12)Special Inspection (30)
08/21/2026
Signed off — Alteration
Installation of 4.4 kw solar energy system on roof. No change of occupancy, use or egress.
Q01411283-I1
06/08/2026
Permit issued — Solar
Q01411283-I1-SL
06/03/2026
Filed — Alteration
Installation of 4.4 kw solar energy system on roof. No change of occupancy, use or egress.
Q01411283-I1
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
06/03/2026
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
06/03/2026
Special inspection requirement — Final
Malathi Ananthakrishnan
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
06/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
05/26/2026
Special inspection requirement — Fenestration air leakage
QIUFAN JIANG
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
05/26/2026
Special inspection requirement — Fenestration areas
QIUFAN JIANG
05/26/2026
Special inspection requirement — Permanent certificate
QIUFAN JIANG
05/26/2026
Special inspection requirement — Final
QIUFAN JIANG
05/26/2026
Special inspection requirement — Maintenance information
QIUFAN JIANG
05/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
QIUFAN JIANG
05/26/2026
Special inspection requirement — Air barrier - visual inspection
QIUFAN JIANG
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
05/26/2026
Special inspection requirement — Interior lighting power
QIUFAN JIANG
05/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIUFAN JIANG
05/26/2026
Special inspection requirement — Insulation placement and R values
QIUFAN JIANG
05/26/2026
Special inspection requirement — Wood – Prefabricated I-Joists
QIUFAN JIANG
05/26/2026
Special inspection requirement — Electric vehicle service equipment requirements
QIUFAN JIANG
05/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
QIUFAN JIANG
05/26/2026
Special inspection requirement — Metering
QIUFAN JIANG
05/07/2026
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH DOB NOW ALT-1 JOB #Q01152959-I1 AS PER PLAN FILED HEREWITH.
Q01152959-P6
04/30/2026
Special inspection requirement — Fenestration air leakage
QIUFAN JIANG
04/30/2026
Special inspection requirement — Permanent certificate
QIUFAN JIANG
04/30/2026
Special inspection requirement — Maintenance information
QIUFAN JIANG
04/30/2026
Special inspection requirement — Final
QIUFAN JIANG
04/30/2026
Special inspection requirement — Interior lighting power
QIUFAN JIANG
04/30/2026
Special inspection requirement — Metering
QIUFAN JIANG
04/30/2026
Special inspection requirement — Fenestration areas
QIUFAN JIANG
04/30/2026
Special inspection requirement — Wood – Prefabricated I-Joists
QIUFAN JIANG
04/30/2026
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
04/08/2026
Signed off — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH DOB NOW ALT-1 JOB #Q01152959-I1 AS PER PLAN FILED HEREWITH.
Q01152959-S2
04/02/2026
Signed off — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH DOB NOW ALT-1 JOB #Q01152959-I1 AS PER PLAN FILED HEREWITH.
Q01152959-S1
03/31/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/09/2026
Signed off — Alteration
INSTALL NEW TEMPORARY WOOD CONSTRUCTION FENCE AND GATE IN OPEN SPACE.
Q01175661-I1
03/03/2026
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH DOB NOW ALT-1 JOB #Q01152959-I1 AS PER PLAN FILED HEREWITH.
Q01152959-P5
02/11/2026
Permit issued — General Construction
Q01152959-I1-ST
12/23/2025
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH DOB NOW ALT-1 JOB #Q01152959-I1 AS PER PLAN FILED HEREWITH.
Q01152959-P4
12/12/2025
Objection resolved — Addressed
12/03/2025
Objection raised — Other
11/30/2025
Permit issued — Mechanical Systems
Q01152959-S2-MS
11/28/2025
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH DOB NOW ALT-1 JOB #Q01152959-I1 AS PER PLAN FILED HEREWITH.
Q01152959-P2
11/28/2025
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH DOB NOW ALT-1 JOB #Q01152959-I1 AS PER PLAN FILED HEREWITH.
Q01152959-P3
11/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/06/2025
Permit issued — Plumbing
Q01152959-S1-PL
11/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/02/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/04/2025
Permit issued — Structural
Q01152959-I1-GC
05/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/25/2025
Permit issued — Plumbing
Q01152959-S1-PL
02/10/2025
Permit issued — Structural
Q01152959-I1-GC
02/10/2025
Permit issued — Construction Fence
Q01175661-I1-FN
02/04/2025
Filed — Alteration
INSTALL NEW TEMPORARY WOOD CONSTRUCTION FENCE AND GATE IN OPEN SPACE.
Q01175661-I1
Latest 60 of 74 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/06/2024$1.3M—PROMILA LLC → WX&YY LLC$589/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS106/03/2026
POLAR ENGINEERING, P.C.805/07/2026
NIC 88 CORP102/04/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS RENOVATION INCGeneral Contractor704/09/2026
TRI STATE PLBG & HTG INCPlumbing207/08/2026
ACCORD POWER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561106/03/2026
WELLDONE INSPECTION INC.8628805/07/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offACCORD POWER INC06/08/2026
DOB NOWGeneral ConstructionSigned-offCS RENOVATION INC02/11/2026
DOB NOWMechanical SystemsSigned-offCS RENOVATION INC11/30/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC11/06/2025
DOB NOWStructuralPermit IssuedCS RENOVATION INC06/04/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC02/25/2025
DOB NOWStructuralPermit IssuedCS RENOVATION INC02/10/2025
DOB NOWConstruction FenceSigned-offCS RENOVATION INC02/10/2025
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/31/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
06/03/2026Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
06/03/2026FinalMalathi Ananthakrishnanprogress
06/03/2026Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
06/03/2026Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
06/03/2026Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
05/26/2026Energy Code Compliance InspectionsQIUFAN JIANGprogress
05/26/2026Fenestration areasQIUFAN JIANGenergy_progress
05/26/2026Insulation placement and R valuesQIUFAN JIANGenergy_progress
05/26/2026Interior lighting powerQIUFAN JIANGenergy_progress
05/26/2026Maintenance informationQIUFAN JIANGenergy_progress
05/26/2026Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
05/26/2026Fenestration air leakageQIUFAN JIANGenergy_progress
05/26/2026Air barrier - visual inspectionQIUFAN JIANGenergy_progress
05/26/2026Fenestration and door U-factor and product ratingsQIUFAN JIANGenergy_progress
05/26/2026MeteringQIUFAN JIANGenergy_progress
05/26/2026Electric vehicle service equipment requirementsQIUFAN JIANGenergy_progress
05/26/2026Permanent certificateQIUFAN JIANGenergy_progress
05/26/2026Wood – Prefabricated I-JoistsQIUFAN JIANGspecial
05/26/2026Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
05/26/2026Fire-Resistance Rated ConstructionQIUFAN JIANGprogress
05/26/2026FinalQIUFAN JIANGprogress
04/30/2026Maintenance informationQIUFAN JIANGenergy_progress
04/30/2026Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
04/30/2026Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
04/30/2026Wood – Prefabricated I-JoistsQIUFAN JIANGspecial
Latest 25 of 76.
▾Documents — 129 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026Q01175661-I1Request digital key ↗
08/16/2026Q01152959-S1Request digital key ↗
08/16/2026Q01152959-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/16/2026Q01152959-P2Open ↗
08/16/2026Q01152959-P6Open ↗
08/14/2026Q01152959-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/16/2026Q01152959-P2Open ↗
08/16/2026Q01152959-P6Open ↗
08/14/2026Q01152959-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/16/2026Q01152959-P2Open ↗
08/14/2026Q01152959-I1Open ↗
▸Seals & Professional Certifications86
▸DOB NOWProgress Inspector Seal & Signature60
09/27/2026Q01152959-S1Open ↗
09/27/2026Q01152959-S1Open ↗
09/27/2026Q01152959-S1Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/27/2026Q01152959-S1Open ↗
08/31/2026Q01152959-P3Open ↗
08/30/2026Q01411283-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026Q01175661-I1Open ↗
08/16/2026Q01152959-S2Open ↗
08/16/2026Q01152959-S1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/16/2026Q01152959-P2Open ↗
08/16/2026Q01152959-P6Open ↗
08/14/2026Q01152959-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026Q01152959-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/16/2026Q01152959-S2Open ↗
08/16/2026Q01152959-S1Open ↗
08/16/2026Q01152959-P2Open ↗
Showing 3 of 8 on file for this type
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/16/2026Q01152959-P6Open ↗
08/16/2026Q01152959-P2Open ↗
08/14/2026Q01152959-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/16/2026Q01152959-P6Open ↗
08/16/2026Q01152959-P2Open ↗
08/14/2026Q01152959-I1Open ↗
▸DOB NOWPlot Diagram3
08/16/2026Q01152959-P2Open ↗
08/16/2026Q01152959-P6Open ↗
08/14/2026Q01152959-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/16/2026Q01152959-P2Open ↗
08/16/2026Q01152959-P6Open ↗
08/14/2026Q01152959-I1Open ↗
▸DOB NOWFinal Survey1
08/14/2026Q01152959-I1Open ↗