← Back
BuildNYC
Two stories - detached, small or mid-size
157-11 12TH ROAD
QUEENS · BIN 4103706
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R2AZoning
1,658 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic4p · 1 filing · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar8p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/03/2023$1.2M—— → —$724/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Frank J Quatela Architects408/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Build Assist Planning and Consulting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Proto ConstructionGeneral Contractor407/08/2026
Delta-Sigma MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Frank J. Quatela, Architects1632408/19/2024
Building Lifecycle
All (53)Filed (4)Permit Issued (3)Signed Off (2)Inspection (4)Objection (10)Special Inspection (30)
01/31/2025
Signed off — Alteration
NEW PLUMBING FIXTURES AND REPLACEMENT OF PLUMBING FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH DOB NOW APPLICATION Q00915212. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00915212-I1
01/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
FRANK QUATELA
08/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
FRANK QUATELA
08/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK QUATELA
08/29/2024
Special inspection requirement — Mechanical Systems
FRANK QUATELA
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
08/29/2024
Special inspection requirement — Final
FRANK QUATELA
08/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
FRANK QUATELA
08/29/2024
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
08/29/2024
Special inspection requirement — Fenestration areas
FRANK QUATELA
08/29/2024
Special inspection requirement — Maintenance information
FRANK QUATELA
08/29/2024
Special inspection requirement — Interior lighting power
FRANK QUATELA
08/29/2024
Special inspection requirement — Permanent certificate
FRANK QUATELA
08/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANK QUATELA
08/29/2024
Special inspection requirement — Air barrier - visual inspection
FRANK QUATELA
08/29/2024
Special inspection requirement — Fenestration air leakage
FRANK QUATELA
08/19/2024
Filed — Alteration
NEW PLUMBING FIXTURES AND REPLACEMENT OF PLUMBING FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH DOB NOW APPLICATION Q00915212. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00915212-P3
07/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
FRANK QUATELA
07/30/2024
Special inspection requirement — Maintenance information
FRANK QUATELA
07/30/2024
Special inspection requirement — Permanent certificate
FRANK QUATELA
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
07/30/2024
Special inspection requirement — Mechanical Systems
FRANK QUATELA
07/30/2024
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
07/30/2024
Special inspection requirement — Final
FRANK QUATELA
07/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
FRANK QUATELA
07/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANK QUATELA
07/30/2024
Special inspection requirement — Fenestration areas
FRANK QUATELA
07/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK QUATELA
07/30/2024
Special inspection requirement — Air barrier - visual inspection
FRANK QUATELA
07/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
FRANK QUATELA
07/30/2024
Special inspection requirement — Interior lighting power
FRANK QUATELA
07/30/2024
Special inspection requirement — Fenestration air leakage
FRANK QUATELA
07/15/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/01/2024
Signed off — Alteration
NEW PLUMBING FIXTURES AND REPLACEMENT OF PLUMBING FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH DOB NOW APPLICATION Q00915212. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00915212-S1
05/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/11/2023
Objection resolved — Addressed
10/10/2023
Objection raised — Other
10/04/2023
Filed — Alteration
NEW PLUMBING FIXTURES AND REPLACEMENT OF PLUMBING FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH DOB NOW APPLICATION Q00915212. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00915212-P1
09/08/2023
Permit issued — General Construction
Q00915212-I1-MS
09/08/2023
Permit issued — Plumbing
Q00915212-S1-PL
08/24/2023
Permit issued — General Construction
Q00915212-I1-GC
08/17/2023
Objection raised — Scope
08/17/2023
Objection resolved — Addressed
08/17/2023
Objection raised — Zoning
08/17/2023
Objection resolved — Addressed
08/17/2023
Objection raised — Scope
08/17/2023
Objection resolved — Addressed
08/17/2023
Objection raised — Mechanical
08/17/2023
Objection resolved — Addressed
08/15/2023
Filed — Alteration
NEW PLUMBING FIXTURES AND REPLACEMENT OF PLUMBING FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH DOB NOW APPLICATION Q00915212. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00915212-I1
08/15/2023
Filed — Alteration
NEW PLUMBING FIXTURES AND REPLACEMENT OF PLUMBING FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH DOB NOW APPLICATION Q00915212. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00915212-S1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offProto Construction09/08/2023
DOB NOWPlumbingSigned-offDelta-Sigma Mechanical09/08/2023
DOB NOWGeneral ConstructionSigned-offProto Construction08/24/2023
2 projects · most recent 09/26/2023
General Wiring
FiledStatusContractorScope
09/26/2023CompleteBayside Electrical ContGeneral Wiring
09/08/2023CompleteBayside Electrical Cont1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/15/2024Fail-Final General Construction Non-Directive 14FailView ↗
05/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/29/2024HVAC-R and service water heating system controlsFRANK QUATELAenergy_progress
08/29/2024HVAC-R and service water heating equipmentFRANK QUATELAenergy_progress
08/29/2024HVAC-R and service water piping design and insulationFRANK QUATELAenergy_progress
08/29/2024Mechanical SystemsFRANK QUATELAspecial
08/29/2024Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
08/29/2024FinalFRANK QUATELAprogress
08/29/2024Fire-Resistance Rated ConstructionFRANK QUATELAprogress
08/29/2024Energy Code Compliance InspectionsFRANK QUATELAprogress
08/29/2024Fenestration areasFRANK QUATELAenergy_progress
08/29/2024Maintenance informationFRANK QUATELAenergy_progress
08/29/2024Interior lighting powerFRANK QUATELAenergy_progress
08/29/2024Permanent certificateFRANK QUATELAenergy_progress
08/29/2024Fenestration and door U-factor and product ratingsFRANK QUATELAenergy_progress
08/29/2024Air barrier - visual inspectionFRANK QUATELAenergy_progress
08/29/2024Fenestration air leakageFRANK QUATELAenergy_progress
07/30/2024HVAC-R and service water heating system controlsFRANK QUATELAenergy_progress
07/30/2024Maintenance informationFRANK QUATELAenergy_progress
07/30/2024Permanent certificateFRANK QUATELAenergy_progress
07/30/2024Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
07/30/2024Mechanical SystemsFRANK QUATELAspecial
07/30/2024Energy Code Compliance InspectionsFRANK QUATELAprogress
07/30/2024FinalFRANK QUATELAprogress
07/30/2024Fire-Resistance Rated ConstructionFRANK QUATELAprogress
07/30/2024Fenestration and door U-factor and product ratingsFRANK QUATELAenergy_progress
07/30/2024Fenestration areasFRANK QUATELAenergy_progress
Latest 25 of 36.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026Q00915212-I1Request digital key ↗
08/24/2026Q00915212-S1Request digital key ↗
08/24/2026Q00915212-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
09/14/2026Q00915212-I1Open ↗
09/14/2026Q00915212-I1Open ↗
08/23/2026Q00915212-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026Q00915212-P1Open ↗
08/24/2026Q00915212-S1Open ↗
08/24/2026Q00915212-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/14/2026Q00915212-I1Open ↗
08/23/2026Q00915212-P1Open ↗
08/23/2026Q00915212-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026Q00915212-S1Open ↗
08/24/2026Q00915212-I1Open ↗
08/24/2026Q00915212-P3Open ↗
Showing 3 of 4 on file for this type