1899Year Built
2Stories
B3Building Class
R6BZoning
1,276 sfGross Floor Area
2Units
Two family converted from one family · 1,792 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/31/2021$1.5M—Private party → Private party$1,176/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INDETAIL ARCHITECTURAL AND ENGIN208/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STELLAR INDUSTRIES INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INDETAIL DESIGN ARCHITECT4828208/11/2023
Building Lifecycle
All (33)Filed (2)Permit Issued (1)Signed Off (1)Inspection (1)Objection (16)Special Inspection (12)
08/24/2023
Signed off — Alteration
ALT 2 TO FILE EXCAVATION FOR THE CELLAR LEVEL FOR 18" ( 2 FEET AWAYFROM THE FOUNDATIONS) AS PER PLANS , THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00826518-I1
08/21/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/15/2023
Special inspection requirement — Insulation placement and R values
Jonathan Chin
08/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
Jonathan Chin
08/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jonathan Chin
08/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jonathan Chin
08/15/2023
Special inspection requirement — Energy Code Compliance Inspections
Jonathan Chin
08/15/2023
Special inspection requirement — Interior lighting power
Jonathan Chin
08/11/2023
Filed — Alteration
ALT 2 TO FILE EXCAVATION FOR THE CELLAR LEVEL FOR 18" ( 2 FEET AWAYFROM THE FOUNDATIONS) AS PER PLANS , THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00826518-P1
08/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jonathan Chin
08/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
Jonathan Chin
08/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Jonathan Chin
08/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jonathan Chin
08/11/2023
Special inspection requirement — Insulation placement and R values
Jonathan Chin
08/11/2023
Special inspection requirement — Interior lighting power
Jonathan Chin
05/24/2023
Permit issued — General Construction
B00826518-I1-GC
03/03/2023
Objection raised — Energy
03/03/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Structural
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Structural
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Admin
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Structural
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Structural
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Admin
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Structural
02/16/2023
Objection resolved — Addressed
02/14/2023
Filed — Alteration
ALT 2 TO FILE EXCAVATION FOR THE CELLAR LEVEL FOR 18" ( 2 FEET AWAYFROM THE FOUNDATIONS) AS PER PLANS , THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00826518-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSTELLAR INDUSTRIES INC05/24/2023
1 project · most recent 06/20/2023
General Wiring
FiledStatusContractorScope
06/20/2023CompleteC & A ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/21/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/15/2023Insulation placement and R valuesJonathan Chinenergy_progress
08/15/2023Tenant Protection Plan ComplianceJonathan Chinspecial
08/15/2023Fire-Resistant Penetrations and JointsJonathan Chinspecial
08/15/2023Fire-Resistance Rated ConstructionJonathan Chinprogress
08/15/2023Energy Code Compliance InspectionsJonathan Chinprogress
08/15/2023Interior lighting powerJonathan Chinenergy_progress
08/11/2023Fire-Resistant Penetrations and JointsJonathan Chinspecial
08/11/2023Tenant Protection Plan ComplianceJonathan Chinspecial
08/11/2023Energy Code Compliance InspectionsJonathan Chinprogress
08/11/2023Fire-Resistance Rated ConstructionJonathan Chinprogress
08/11/2023Insulation placement and R valuesJonathan Chinenergy_progress
08/11/2023Interior lighting powerJonathan Chinenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00826518-P1Request digital key ↗
08/15/2026B00826518-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026B00826518-P1Open ↗
08/28/2026B00826518-P1Open ↗
08/28/2026B00826518-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00826518-P1Open ↗
08/27/2026B00826518-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00826518-P1Open ↗
08/28/2026B00826518-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00826518-P1Open ↗
08/15/2026B00826518-I1Open ↗