Two stories - detached, small or mid-size
157-15 11 AVENUE
QUEENS · BIN 4103649
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R2AZoning
2,865 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 7,500 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 3 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/06/2023$985K—— → —$344/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLS DESIGNS305/20/2025
Trinity Solar LLC205/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.M.A. GENERAL CONTR. INCGeneral Contractor507/08/2026
ARCHWELL CONTRACTING COGeneral Contractor303/21/2026
SUPERB PLUMBING & HEATINGPlumbing207/08/2026
TRINITY SOLAR LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JLS DESIGNS1377205/20/2025
JAY KAVI CORPORATION8500205/07/2024
Building Lifecycle
All (57)Filed (5)Permit Issued (7)Signed Off (3)Inspection (2)Objection (14)Special Inspection (26)
08/19/2025
Signed off — Alteration
Proposed kitchen extension at rear with screened in porch and interior renovations to an existing 2 story one family dwelling. No change to use, egress, or occupancy
Q00505411-I1
08/08/2025
Permit issued — Foundation
Q00505411-I1-FO
06/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Footing and Foundation
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Final
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Insulation placement and R values
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Interior lighting power
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Fenestration air leakage
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Air barrier — testing
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Fenestration areas
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Air barrier - visual inspection
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Subgrade Inspections
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JOSEPH SULTANA, JR
06/02/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
05/20/2025
Filed — Alteration
Proposed kitchen extension at rear with screened in porch and interior renovations to an existing 2 story one family dwelling. No change to use, egress, or occupancy
Q00505411-P1
04/09/2025
Signed off — Alteration
replace existing plumbing fixture on existing roughing and 1 new shower at 2nd floor
Q00592111-I1
07/08/2024
Signed off — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q00972653-I1
05/07/2024
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q00972653-P1
05/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jay Kavi
05/07/2024
Special inspection requirement — Energy Code Compliance Inspections
IHOR BOJCUN
05/07/2024
Special inspection requirement — Final
IHOR BOJCUN
05/07/2024
Special inspection requirement — Air barrier - visual inspection
IHOR BOJCUN
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
05/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jay Kavi
05/07/2024
Special inspection requirement — Energy Code Compliance Inspections
IHOR BOJCUN
05/07/2024
Special inspection requirement — Final
IHOR BOJCUN
05/07/2024
Special inspection requirement — Air barrier - visual inspection
IHOR BOJCUN
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
12/20/2023
Permit issued — Solar
Q00972653-I1-SL
12/18/2023
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q00972653-I1
03/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/13/2022
Permit issued — Plumbing
Q00592111-I1-PL
01/14/2022
Permit issued — General Construction
Q00505411-I1-GC
10/19/2021
Permit issued — General Construction
Q00505411-I1-GC
09/16/2021
Permit issued — Plumbing
Q00592111-I1-PL
09/11/2021
Filed — Alteration
replace existing plumbing fixture on existing roughing and 1 new shower at 2nd floor
Q00592111-I1
08/06/2021
Permit issued — Foundation
Q00505411-I1-GC
07/20/2021
Objection raised — Other
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection raised — Other
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection raised — Other
07/20/2021
Objection resolved — Addressed
05/24/2021
Objection raised — Other
05/24/2021
Objection resolved — Addressed
05/24/2021
Objection raised — Other
05/24/2021
Objection resolved — Addressed
05/24/2021
Objection raised — Zoning
05/24/2021
Objection resolved — Addressed
05/24/2021
Objection raised — Other
05/24/2021
Objection resolved — Addressed
04/22/2021
Filed — Alteration
Proposed kitchen extension at rear with screened in porch and interior renovations to an existing 2 story one family dwelling. No change to use, egress, or occupancy
Q00505411-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offARCHWELL CONTRACTING CO08/08/2025
DOB NOWSolarSigned-offTRINITY SOLAR LLC12/20/2023
DOB NOWPlumbingSigned-offSUPERB PLUMBING & HEATING06/13/2022
DOB NOWGeneral ConstructionSigned-offKATS, JASON01/14/2022
DOB NOWGeneral ConstructionSigned-offKATS, JASON10/19/2021
DOB NOWPlumbingSigned-offSUPERB PLUMBING & HEATING09/16/2021
DOB NOWFoundationSigned-offKATS, JASON08/06/2021
2 projects · most recent 01/24/2024
General Wiring
FiledStatusContractorScope
01/24/2024CompleteREDLINE ELECTRIC INC—
08/01/2021CompleteTM SELECT ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
06/02/2025Fenestration and door U-factor and product ratingsJOSEPH SULTANA, JRenergy_progress
06/02/2025Fire-Resistance Rated ConstructionJOSEPH SULTANA, JRprogress
06/02/2025Footing and FoundationJOSEPH SULTANA, JRprogress
06/02/2025FinalJOSEPH SULTANA, JRprogress
06/02/2025Energy Code Compliance InspectionsJOSEPH SULTANA, JRprogress
06/02/2025Insulation placement and R valuesJOSEPH SULTANA, JRenergy_progress
06/02/2025Interior lighting powerJOSEPH SULTANA, JRenergy_progress
06/02/2025Fenestration air leakageJOSEPH SULTANA, JRenergy_progress
06/02/2025Air barrier — testing JOSEPH SULTANA, JRenergy_progress
06/02/2025Fenestration areasJOSEPH SULTANA, JRenergy_progress
06/02/2025Air barrier - visual inspectionJOSEPH SULTANA, JRenergy_progress
06/02/2025Concrete - Cast-In-PlaceJOSEPH SULTANA, JRspecial
06/02/2025Fire-Resistant Penetrations and JointsJOSEPH SULTANA, JRspecial
06/02/2025Subgrade InspectionsJOSEPH SULTANA, JRspecial
06/02/2025Exterior Insulation and Finish Systems (EIFS)JOSEPH SULTANA, JRspecial
06/02/2025Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
05/07/2024Structural Stability – Alterations of existing buildingsJay Kavispecial
05/07/2024Energy Code Compliance InspectionsIHOR BOJCUNprogress
05/07/2024FinalIHOR BOJCUNprogress
05/07/2024Air barrier - visual inspectionIHOR BOJCUNenergy_progress
05/07/2024Fire-Resistant Penetrations and JointsJay Kavispecial
05/07/2024Structural Stability – Alterations of existing buildingsJay Kavispecial
05/07/2024Energy Code Compliance InspectionsIHOR BOJCUNprogress
05/07/2024FinalIHOR BOJCUNprogress
05/07/2024Air barrier - visual inspectionIHOR BOJCUNenergy_progress
Latest 25 of 26.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00505411-P1Request digital key ↗
08/27/2026Q00592111-I1Request digital key ↗
08/23/2026Q00972653-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026Q00505411-I1Open ↗
08/13/2026Q00505411-P1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q00972653-I1Open ↗
09/01/2026Q00972653-I1Open ↗
09/01/2026Q00972653-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00972653-I1Open ↗
09/01/2026Q00972653-I1Open ↗
08/28/2026Q00505411-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00505411-I1Open ↗
08/23/2026Q00972653-P1Open ↗
08/23/2026Q00972653-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026Q00972653-P1Open ↗
08/23/2026Q00972653-I1Open ↗
08/15/2026Q00505411-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00505411-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/15/2026Q00505411-I1Open ↗
08/13/2026Q00505411-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00505411-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00505411-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00972653-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/15/2026Q00505411-I1Open ↗
08/13/2026Q00505411-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026Q00505411-I1Open ↗
08/13/2026Q00505411-P1Open ↗
▸DOB NOWPlot Diagram2
08/15/2026Q00505411-I1Open ↗
08/13/2026Q00505411-P1Open ↗