← Back
Two family converted from one family
157-44 20 ROAD
QUEENS · Whitestone-Beechhurst · BIN 4107749
💬 Discuss this project
1960Year Built
2Stories
B3Building Class
R3-1Zoning
2,358 sfGross Floor Area
2Units
Rent Stabilized0 Open Violations
Two family converted from one family · 4,000 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
MechanicalCivil
Floor 21p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KALICO GROUP2207/08/2026
OWNER OF PROPERTY AT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/22/2025$1.9M—— → —$785/sf building
01/11/2024$995K—— → —$422/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP602/28/2025
TABRIZ GROUP ENTERPRISES207/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ GROUP ENTERPRISE303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor507/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275612/04/2024
Building Lifecycle
All (53)Filed (8)Permit Issued (4)Signed Off (3)Violation (3)Inspection (5)Special Inspection (30)
03/31/2025
Signed off — Alteration CO
MECHANICAL FILING FOR HVAC SYSTEM IN CONJUNCTION WITH ALT#q01022238-I1.
Q01022238-S1
03/26/2025
Permit issued — Mechanical Systems
Q01022238-S1-MS
03/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BAKHTIAR SHAMLOO
03/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
03/03/2025
Special inspection requirement — Mechanical Systems
BAKHTIAR SHAMLOO
03/03/2025
Special inspection requirement — Final
HARI SONI
03/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
BAKHTIAR SHAMLOO
03/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
BAKHTIAR SHAMLOO
02/28/2025
Filed — Alteration CO
MECHANICAL FILING FOR HVAC SYSTEM IN CONJUNCTION WITH ALT#q01022238-I1.
Q01022238-P2
02/28/2025
Special inspection requirement — Mechanical Systems
02/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/28/2025
Special inspection requirement — Final
02/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
02/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
02/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
02/05/2025
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#Q01022238
Q01033086-I1
01/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/12/2024
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Final
HARI SONI
12/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
12/12/2024
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
12/06/2024
Signed off — Alteration
Q00990194-I1
12/04/2024
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#Q01022238
Q01033086-P2
12/04/2024
Violation issued (HPD, closed)
I
10/30/2024
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#Q01022238
Q01033086-P1
10/21/2024
Filed — Alteration CO
MECHANICAL FILING FOR HVAC SYSTEM IN CONJUNCTION WITH ALT#q01022238-I1.
Q01022238-S1
08/16/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/16/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/05/2024
Permit issued — Plumbing
Q01033086-I1-PL
07/30/2024
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#Q01022238
Q01033086-I1
07/29/2024
Filed — Alteration CO
MECHANICAL FILING FOR HVAC SYSTEM IN CONJUNCTION WITH ALT#q01022238-I1.
Q01022238-P1
07/03/2024
Permit issued — Earth Work
Q01022238-I1-GC-CX
03/20/2024
Filed — Alteration CO
MECHANICAL FILING FOR HVAC SYSTEM IN CONJUNCTION WITH ALT#q01022238-I1.
Q01022238-I1
01/17/2024
Permit issued — Construction Fence
Q00990194-I1-FN
01/15/2024
Filed — Alteration
Q00990194-I1
11/29/2023
Violation issued (HPD, closed)
I
04/13/2016
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJ&J DESIGNS INC03/26/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR08/05/2024
DOB NOWEarth WorkPermit IssuedJ&J DESIGNS INC07/03/2024
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC01/17/2024
1 project · most recent 02/28/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/28/2025Signed-offJ&J DESIGNS INCHeating and Air Conditioning Systems
Heat / Cool
Goodman GOODMAN GSXN3 48,000 BTU · Furnace ×16
1 project · most recent 08/06/2024
General Wiring
FiledStatusContractorScope
08/06/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/16/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/16/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
03/03/2025HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
03/03/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
03/03/2025Mechanical SystemsBAKHTIAR SHAMLOOspecial
03/03/2025FinalHARI SONIprogress
03/03/2025HVAC-R and service water heating equipmentBAKHTIAR SHAMLOOenergy_progress
03/03/2025HVAC-R and service water heating system controlsBAKHTIAR SHAMLOOenergy_progress
02/28/2025Mechanical Systems—special
02/28/2025Structural Stability – Alterations of existing buildings—special
02/28/2025Final—progress
02/28/2025HVAC-R and service water heating system controls—energy_progress
02/28/2025HVAC-R and service water piping design and insulation—energy_progress
02/28/2025HVAC-R and service water heating equipment—energy_progress
12/12/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/12/2024MasonryBAKHTIAR SHAMLOOspecial
12/12/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
12/12/2024Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
12/12/2024Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
12/12/2024Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
12/12/2024Maintenance informationBAKHTIAR SHAMLOOenergy_progress
12/12/2024Permanent certificateBAKHTIAR SHAMLOOenergy_progress
12/12/2024Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
12/12/2024FinalHARI SONIprogress
12/12/2024Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
12/12/2024Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
12/12/2024Footing and FoundationBAKHTIAR SHAMLOOprogress
Latest 25 of 56.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026Q00990194-I1Request digital key ↗
08/21/2026Q01033086-P2Request digital key ↗
08/21/2026Q01033086-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026Q01022238-I1Open ↗
08/13/2026Q01022238-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026Q01022238-I1Open ↗
08/13/2026Q01022238-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026Q01022238-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026Q01022238-P1Open ↗
09/23/2026Q01022238-P1Open ↗
09/01/2026Q01022238-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026Q00990194-I1Open ↗
08/21/2026Q01033086-P2Open ↗
08/21/2026Q01033086-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026Q01022238-P1Open ↗
09/23/2026Q01022238-P1Open ↗
09/01/2026Q01022238-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/20/2026Q01022238-I1Open ↗
08/20/2026Q01022238-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026Q01033086-P2Open ↗
08/21/2026Q01033086-P1Open ↗
08/21/2026Q01033086-I1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/20/2026Q01022238-I1Open ↗
08/13/2026Q01022238-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/20/2026Q01022238-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/20/2026Q01022238-I1Open ↗
08/13/2026Q01022238-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026Q01022238-I1Open ↗
08/13/2026Q01022238-P1Open ↗
▸DOB NOWPlot Diagram2
08/20/2026Q01022238-I1Open ↗
08/13/2026Q01022238-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026Q01022238-I1Open ↗
08/20/2026Q01022238-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/20/2026Q01022238-I1Open ↗
▸DOB NOWFinal Survey1
08/20/2026Q01022238-I1Open ↗