← Back
Two stories - detached, small or mid-size
157-59 12 AVENUE
QUEENS · Whitestone-Beechhurst · BIN 4103666
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R2AZoning
2,559 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,000 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Attic1 filing · 10 docs
Floor 27p · 2 filings · 16 docs
Floor 17p · 2 filings · 16 docs
Cellar8p · 2 filings · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/24/2024$1.2M—— → —$469/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI611/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CROWN PLUMBING INCPlumbing207/08/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394311/01/2024
Building Lifecycle
All (24)Filed (6)Permit Issued (3)Signed Off (2)Violation (2)Inspection (5)Special Inspection (6)
01/06/2026
Violation issued (ECB, closed)
Construction
01/06/2026
Violation issued (ECB, closed)
Zoning
12/06/2024
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST & SECOND FLOOR AND ATTIC WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW COMBI. BOILER IN CELLAR;NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01044584-I1
11/27/2024
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST & SECOND FLOOR AND ATTIC WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01044581-I1
11/27/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/27/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/01/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST & SECOND FLOOR AND ATTIC WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01044581-P2
11/01/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST & SECOND FLOOR AND ATTIC WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW COMBI. BOILER IN CELLAR;NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01044584-P2
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
10/31/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
10/31/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
09/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2024
Permit issued — Plumbing
Q01044584-I1-PL
07/17/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST & SECOND FLOOR AND ATTIC WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW COMBI. BOILER IN CELLAR;NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01044584-P1
07/17/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST & SECOND FLOOR AND ATTIC WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01044581-P1
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/17/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
07/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
05/24/2024
Permit issued — Plumbing
Q01044584-I1-PL
05/08/2024
Permit issued — General Construction
Q01044581-I1-GC
05/03/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST & SECOND FLOOR AND ATTIC WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW COMBI. BOILER IN CELLAR;NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01044584-I1
05/03/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST & SECOND FLOOR AND ATTIC WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01044581-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROWN PLUMBING INC09/03/2024
DOB NOWPlumbingSigned-offCROWN PLUMBING INC05/24/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC05/08/2024
1 project · most recent 06/04/2024
General Wiring
FiledStatusContractorScope
06/04/2024CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/27/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/31/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/31/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/31/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/17/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/17/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/17/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/22/2026Q01044581-P1Request digital key ↗
08/22/2026Q01044581-I1Request digital key ↗
08/22/2026Q01044581-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/22/2026Q01044581-P1Open ↗
08/22/2026Q01044581-I1Open ↗
08/22/2026Q01044581-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01044581-P1Open ↗
08/23/2026Q01044581-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01044581-P1Open ↗
08/23/2026Q01044581-P2Open ↗