2 Open Violations 0 unresolved · 2 paperwork only▸
ECB05/21/2026DURING INSPECTION OF A CONSTRUCTION SITE, I OBSERVED AN EXCAVATOR IN THE SITE, SOIL REMOVED AND WOOD FORMS IN PLACE AT THE FOUNDATION LEVEL, AFTER RESEARCH ON DOBNOW NO NOTIFICATION OF EARTHWORK PRIOR TO THE STHearing held — result not yet published$2K proposed
ECB05/21/2026BC 3307.2.1 OBSERVED AN EXCAVATOR ON THE PROPERTY WITHOUT ANY DOT PERMITS. ANY TIME A MACHINE CROSSES A SIDEWALK TO BE STATIONED ON A PROPERTY A DOT PERMIT IS REQUIRED. RESEARCH OF DOT SYSTEM REVEALED THERE ISHearing held — result not yet published$2K proposed
Two stories - detached, small or mid-size · 6,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.