← Back
Primarily 4 family with 1 store or office
157 AVENUE U
BROOKLYN · BIN 3191156
💬 Discuss this project
1931Year Built
3Stories
S4Building Class
R5BZoning
3,600 sfGross Floor Area
5Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: 159 AVENUE U LLC · 1,600 sf lot · 2.25 FAR built · Flood zone X500
Locations of Work
Plumbing
Cellar1p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
159 AVENUE U LLC203/22/2026
CRISIC AVE U LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP312/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
T C DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONTROL PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371112/01/2025
NIC DESIGN INC9758210/30/2025
Building Lifecycle
All (25)Filed (3)Permit Issued (2)Signed Off (2)Violation (3)Inspection (5)Special Inspection (10)
01/26/2026
Signed off — Alteration
PLUMBING WORK ON CELLAR AND 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01209721-I1
01/13/2026
Signed off — Alteration
INSTALL 4 NEW COMBI BOILER AT CELLAR. PLUMBINGWORK AS PER PLANS, NO CHANGE TO USE,EGRESS OROCCUPANCY
B01310498-I1
01/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/31/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2025
Filed — Alteration
PLUMBING WORK ON CELLAR AND 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01209721-P1
11/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
ANDREW GOODRICH
11/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
ANDREW GOODRICH
11/26/2025
Special inspection requirement — Maintenance information
ANDREW GOODRICH
11/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANDREW GOODRICH
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
11/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
ANDREW GOODRICH
11/18/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/06/2025
Permit issued — Boiler Equipment
B01310498-I1-BE
10/30/2025
Filed — Alteration
INSTALL 4 NEW COMBI BOILER AT CELLAR. PLUMBINGWORK AS PER PLANS, NO CHANGE TO USE,EGRESS OROCCUPANCY
B01310498-I1
10/29/2025
Special inspection requirement — Heating Systems
Eric Sun
10/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
08/20/2025
Permit issued — Plumbing
B01209721-I1-PL
04/29/2025
Filed — Alteration
PLUMBING WORK ON CELLAR AND 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01209721-I1
11/21/2023
Violation issued (HPD, closed)
I
08/26/2002
Violation issued (ECB, closed)
Boilers
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCONTROL PLBG & HTG INC11/06/2025
DOB NOWPlumbingSigned-offCONTROL PLBG & HTG INC08/20/2025
1 project · most recent 04/11/2025
FiledStatusContractorScope
04/11/2025CompleteR.C.M. ELECTRIC CORP.6 meters, 5 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/26/2025HVAC-R and service water heating system controlsANDREW GOODRICHenergy_progress
11/26/2025HVAC-R and service water heating equipmentANDREW GOODRICHenergy_progress
11/26/2025Maintenance informationANDREW GOODRICHenergy_progress
11/26/2025HVAC-R and service water piping design and insulationANDREW GOODRICHenergy_progress
11/26/2025Fire-Resistant Penetrations and JointsEric Sunspecial
11/26/2025Tenant Protection Plan Compliance—special
11/26/2025Energy Code Compliance InspectionsANDREW GOODRICHprogress
10/29/2025Heating SystemsEric Sunspecial
10/29/2025Tenant Protection Plan ComplianceEric Sunspecial
10/29/2025Fire-Resistant Penetrations and JointsEric Sunspecial
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01209721-I1Request digital key ↗
08/21/2026B01209721-P1Request digital key ↗
08/20/2026B01310498-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01209721-I1Open ↗
08/21/2026B01209721-P1Open ↗
08/13/2026B01310498-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B01209721-P1Open ↗
08/25/2026B01209721-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B01310498-I1Open ↗
08/25/2026B01209721-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B01209721-I1Open ↗
08/21/2026B01209721-P1Open ↗