← Back
Three families
157 BAY 38 STREET
BROOKLYN · Gravesend (West) · BIN 3186127
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R5Zoning
2,256 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 2,900 sf lot · 0.78 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FENG GROUP LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2025$1.6M—FENG GROUP LLC → Private party$691/sf building
10/11/2018$1.4M—— → —$616/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI707/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394306/18/2025
Building Lifecycle
All (26)Filed (7)Permit Issued (2)Signed Off (2)Violation (1)Inspection (5)Special Inspection (9)
07/22/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
B01179007-I1
07/14/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
B01179007-P3
07/08/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR IN REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01178998-I1
07/07/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/20/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/18/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR IN REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01178998-P2
06/18/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
B01179007-P2
06/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/18/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
05/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/11/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
B01179007-P1
04/11/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR IN REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01178998-P1
04/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
04/11/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
04/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
04/08/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/13/2025
Permit issued — General Construction
B01178998-I1-GC
02/12/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
B01179007-I1
02/12/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR IN REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01178998-I1
02/12/2025
Permit issued — Plumbing
B01179007-I1-PL
09/24/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC02/13/2025
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC02/12/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/07/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/20/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/20/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/20/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/18/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/18/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/18/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
04/11/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
04/11/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
04/11/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/22/2026B01178998-P2Request digital key ↗
08/22/2026B01178998-P1Request digital key ↗
08/22/2026B01178998-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/22/2026B01178998-P2Open ↗
08/22/2026B01178998-P1Open ↗
08/22/2026B01178998-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01178998-P2Open ↗
08/24/2026B01178998-I1Open ↗
08/23/2026B01178998-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01178998-P2Open ↗
08/24/2026B01178998-I1Open ↗
08/23/2026B01178998-P1Open ↗