← Back
BuildNYC
Primarily 4 family with 1 store or office
157 BEACH 116TH STREET
QUEENS · BIN 4304793
💬 Discuss this project
1912Year Built
3Stories
S4Building Class
R7AZoning
3,900 sfGross Floor Area
5Units
Rent Stabilized6 Active Violations 4 unresolved · 2 paperwork only 2 likely answered 1 old, status unconfirmed ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: 157 B 116 St · 2,000 sf lot · 1.95 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Plumbing fixtures installation at nail store4p · 1 filing · 10 docs
Cellar1p · 1 filing · 3 docs
Site & exteriorPlumbing fixtures installation at nail store3p · 1 filing · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/30/2025$905K—— → —$232/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Huan Design106/23/2025
Square Arch106/23/2025
Askon Architects112/22/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Building AssociatesGeneral Contractor204/09/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Huan Design7669206/23/2025
Askon Architect3596112/22/2021
Building Lifecycle
All (63)Filed (3)Permit Issued (4)Signed Off (2)Violation (33)Inspection (6)Objection (2)Special Inspection (13)
05/07/2026
Violation issued (HPD, open)
A
12/26/2025
Signed off — Alteration
FILE CONSTRUCTION WORK ON 1ST FLOOR NAIL STORE TO REMOVE PARTITIONS, REPLACE STOREFRONT, INSTALL NEW PARTITIONS AND INTERIOR FINISHES AND MECHANICAL WORK OF EXHAUST SYSTEM PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01238909-I1
12/26/2025
Signed off — Alteration
FILE CONSTRUCTION WORK ON 1ST FLOOR NAIL STORE TO REMOVE PARTITIONS, REPLACE STOREFRONT, INSTALL NEW PARTITIONS AND INTERIOR FINISHES AND MECHANICAL WORK OF EXHAUST SYSTEM PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01238909-S1
12/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/21/2025
Violation issued (HPD, open)
I
09/29/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/29/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2025
Permit issued — Mechanical Systems
Q01238909-I1-GC
06/25/2025
Permit issued — Plumbing
Q01238909-S1-PL
06/25/2025
Permit issued — General Construction
Q01238909-I1-MS
06/23/2025
Filed — Alteration
FILE CONSTRUCTION WORK ON 1ST FLOOR NAIL STORE TO REMOVE PARTITIONS, REPLACE STOREFRONT, INSTALL NEW PARTITIONS AND INTERIOR FINISHES AND MECHANICAL WORK OF EXHAUST SYSTEM PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01238909-I1
06/23/2025
Filed — Alteration
FILE CONSTRUCTION WORK ON 1ST FLOOR NAIL STORE TO REMOVE PARTITIONS, REPLACE STOREFRONT, INSTALL NEW PARTITIONS AND INTERIOR FINISHES AND MECHANICAL WORK OF EXHAUST SYSTEM PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01238909-S1
06/12/2025
Violation issued (HPD, open)
A
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
06/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
06/10/2025
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
06/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
06/10/2025
Special inspection requirement — Final
Kaijin Liang
06/10/2025
Special inspection requirement — Air barrier - visual inspection
ZHENHUAN XU
06/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
ZHENHUAN XU
06/10/2025
Special inspection requirement — Fenestration air leakage
ZHENHUAN XU
06/10/2025
Special inspection requirement — Fenestration areas
ZHENHUAN XU
06/10/2025
Special inspection requirement — Interior lighting power
ZHENHUAN XU
06/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ZHENHUAN XU
09/03/2023
Violation issued (HPD, closed)
A
09/03/2023
Violation issued (HPD, closed)
A
09/03/2023
Violation issued (HPD, closed)
A
09/03/2023
Violation issued (HPD, closed)
A
09/03/2023
Violation issued (HPD, closed)
A
09/03/2023
Violation issued (HPD, closed)
A
09/03/2023
Violation issued (HPD, closed)
B
09/03/2023
Violation issued (HPD, closed)
B
09/03/2023
Violation issued (HPD, open)
C
03/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/24/2022
Permit issued — Plumbing
Q00651937-I1-PL
12/27/2021
Objection raised — Admin
12/27/2021
Objection resolved — Addressed
12/22/2021
Filed — Alteration
Q00651937-I1
12/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
11/05/2021
Violation issued (ECB, closed)
Construction
11/05/2021
Violation issued (ECB, open)
Plumbing
11/05/2021
Violation issued (ECB, open)
Construction
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/01/2019
Violation issued (HPD, closed)
I
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2017
Violation issued (HPD, closed)
I
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/21/2016
Violation issued (HPD, closed)
I
11/25/2014
Violation issued (HPD, closed)
B
11/25/2014
Violation issued (HPD, closed)
B
12/13/2011
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/13/2004
Violation issued (ECB, closed)
Construction
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNY Building Associates06/25/2025
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp06/25/2025
DOB NOWGeneral ConstructionSigned-offNY Building Associates06/25/2025
DOB NOWPlumbingPermit IssuedAll Pro Plumbing & Heating01/24/2022
BIS—ISSUEDDavid Millner Architects Assoc.q07/27/1995
1 project · most recent 12/22/2021
Gas
FiledStatusContractorScope
12/22/2021Permit IssuedAll Pro Plumbing & HeatingGas
2 projects · most recent 04/14/2026
General Wiring
FiledStatusContractorScope
04/14/2026Permit IssuedKJK Electric6 meters, 5 new_meters
07/01/2025CompleteA.C. Morgan ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/29/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/29/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/10/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
06/10/2025Tenant Protection Plan ComplianceZHENHUAN XUspecial
06/10/2025Mechanical SystemsZHENHUAN XUspecial
06/10/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
06/10/2025Fire-Resistance Rated ConstructionZHENHUAN XUprogress
06/10/2025FinalKaijin Liangprogress
06/10/2025Air barrier - visual inspectionZHENHUAN XUenergy_progress
06/10/2025Duct leakage testing, insulation and designZHENHUAN XUenergy_progress
06/10/2025Fenestration air leakageZHENHUAN XUenergy_progress
06/10/2025Fenestration areasZHENHUAN XUenergy_progress
06/10/2025Interior lighting powerZHENHUAN XUenergy_progress
06/10/2025Fenestration and door U-factor and product ratingsZHENHUAN XUenergy_progress
12/21/2021Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026Q01238909-S1Request digital key ↗
08/19/2026Q01238909-I1Request digital key ↗
08/15/2026Q00651937-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00651937-I1Open ↗
08/13/2026Q01238909-S1Open ↗
08/13/2026Q01238909-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026Q01238909-I1Open ↗
09/23/2026Q01238909-I1Open ↗
09/23/2026Q01238909-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q01238909-I1Open ↗
08/28/2026Q00651937-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01238909-I1Open ↗
08/13/2026Q01238909-S1Open ↗