← Back
Miscellaneous two family
157 CORBIN PLACE
BROOKLYN · BIN 3245717
💬 Discuss this project
1930Year Built
1Stories
B9Building Class
R6Zoning
1,917 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 2,090 sf lot · 0.92 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Floor 18p · 3 filings · 20 docs
Basement4p · 2 filings · 16 docs
Sub-Basement4p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SAVOY YORK CONSULTING INC.610/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DARIUS TORABY ARCHITECTS P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLENWOOD CONSTRUCTION CORGeneral Contractor603/21/2026
SUPREME CONSTRUCTION ANDGeneral Contractor107/08/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOKA ENGINEERING PC1158310/04/2023
Building Lifecycle
All (24)Filed (6)Permit Issued (4)Signed Off (2)Violation (1)Inspection (6)Special Inspection (5)
10/16/2024
Signed off — Alteration
Installation of two air conditioning/heat pump units as per plans.
B00653395-I1
04/15/2024
Permit issued — Mechanical Systems
B00653395-I1-MS
04/04/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/29/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/27/2024
Signed off — Alteration
Proposed interior alterations. No change in use, egress, or occupancy.
B00447929-I1
10/04/2023
Filed — Alteration
Installation of two air conditioning/heat pump units as per plans.
B00653395-I1
07/13/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/19/2022
Permit issued — General Construction
B00447929-I1-GC
12/23/2021
Special inspection requirement — Mechanical Systems
Leonid Kuzmin
12/23/2021
Special inspection requirement — Final
FARID ISMAYILOV
12/21/2021
Filed — Alteration
Proposed interior alterations. No change in use, egress, or occupancy.
B00447929-S1
12/21/2021
Special inspection requirement — Final
10/08/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/21/2021
Filed — Alteration
Installation of new and relocation of existing plumbing fixtures.
B00447953-P1
08/12/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/06/2021
Permit issued — Plumbing
B00447953-I1-PL
08/03/2021
Filed — Alteration
Installation of new and relocation of existing plumbing fixtures.
B00447953-I1
08/03/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leonid Kuzmin
08/03/2021
Special inspection requirement — Final
FARID ISMAYILOV
07/30/2021
Filed — Alteration
Proposed interior alterations. No change in use, egress, or occupancy.
B00447929-P1
06/03/2021
Permit issued — General Construction
B00447929-I1-GC
05/24/2021
Filed — Alteration
Proposed interior alterations. No change in use, egress, or occupancy.
B00447929-I1
10/18/2008
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSUPREME CONSTRUCTION AND04/15/2024
DOB NOWGeneral ConstructionSigned-offGLENWOOD CONSTRUCTION COR05/19/2022
DOB NOWPlumbingPermit IssuedGREGG NY PLUMBING, INC08/06/2021
DOB NOWGeneral ConstructionSigned-offGLENWOOD CONSTRUCTION COR06/03/2021
1 project · most recent 09/21/2021
Gas Water/Sanitary
FiledStatusContractorScope
09/21/2021Permit IssuedGREGG NY PLUMBING, INCGas, Water/Sanitary
2 projects · most recent 08/18/2022
General Wiring
FiledStatusContractorScope
08/18/2022CompleteAP ELECTL SER & MAIN INCGeneral Wiring
02/24/2022Permit IssuedAP ELECTL SER & MAIN INC2 meters, 2 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/04/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/13/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/08/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/23/2021Mechanical SystemsLeonid Kuzminspecial
12/23/2021FinalFARID ISMAYILOVprogress
12/21/2021Final—progress
08/03/2021Structural Stability – Alterations of existing buildingsLeonid Kuzminspecial
08/03/2021FinalFARID ISMAYILOVprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch2
09/01/2026B00447929-S1Request digital key ↗
08/26/2026B00653395-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00447929-I1Request digital key ↗
09/01/2026B00447929-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00447953-I1Request digital key ↗
08/15/2026B00447953-P1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00447929-P1Open ↗
09/01/2026B00447929-I1Open ↗
09/01/2026B00447929-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B00447929-I1Open ↗
08/24/2026B00653395-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B00447929-I1Open ↗
08/24/2026B00653395-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00447929-P1Open ↗
09/01/2026B00447929-I1Open ↗
09/01/2026B00447929-S1Open ↗
Showing 3 of 6 on file for this type