Elevator cooperative
157 EAST 75 STREET
MANHATTAN · BIN 1043146
💬 Discuss this project
1882Year Built
5Stories
D4Building Class
R8BZoning
13,040 sfGross Floor Area
12Units
Rent Stabilized3 Open Violations ▸
Elevator cooperative · Owner of record: 157 E75 ST CP · 3,848 sf lot · 3.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction39p · 2 filings · 20 docs
Floor 5Under Construction43p · 1 filing · 20 docs
Floor 4
Floor 31p · 1 filing · 5 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GPG MANAGEMENT404/09/2026
157 E 75 ST CP303/22/2026
157 E 75TH STREET403/21/2026
157 EAST 75TH STREET703/21/2026
157 E75 CP403/21/2026
157 EAST 75 STREET303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANDRA CONSTANTIN EXPEDITER603/21/2026
RIP CC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL DIMENSION HOME IMPROVEMENTGeneral Contractor907/08/2026
NAC RESTORATION LLCGeneral Contractor507/17/2026
DUTCHESS CABINETS OF NY *General Contractor407/08/2026
COTTAM HEATING & AIR CONDIT.General Contractor203/21/2026
CONWAY, JR, WILLIAMElectrical103/21/2026
DUBOFF, LElectrical103/21/2026
ESPOSITO, RICHARDElectrical103/21/2026
GEORGE BASSOLINOElectrical103/21/2026
JOSEPH ALOIAElectrical103/21/2026
RICHARD ESPOSITOElectrical103/21/2026
WIESLAW MAKSIMElectrical103/21/2026
BLAZE PLUMBING & HEATINGPlumbing107/08/2026
CITY GAS HTG SVC CO INCPlumbing107/08/2026
AURICCHIO, ANNIELLEElectrical103/21/2026
VILLAGE P & H NY INCPlumbing107/08/2026
BENHARD HUQIElectrical103/21/2026
BILLS, ANTHONYElectrical103/21/2026
BRENNAN, WILLIAMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STUDIO NYANDAK ARCHITECTU8378701/27/2026
CHANDA ENG. CONSULTANT PC6842211/24/2025
HOTTENROTH & JOSEPH ARCHI1160203/28/2023
INTEGRITY CONSULTING SERV666110/19/2021
Building Lifecycle
All (127)Filed (15)Permit Issued (17)Signed Off (7)Violation (25)Inspection (9)Objection (32)Special Inspection (22)
07/16/2026
Permit issued — General Construction
M01199679-I1-GC
07/16/2026
Permit issued — Structural
M01199679-S1-ST
06/12/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/25/2026
Special inspection requirement — Structural Steel - Details
TENZIN NYANDAK
02/25/2026
Special inspection requirement — Structural Steel - Welding
TENZIN NYANDAK
02/25/2026
Special inspection requirement — Final
TENZIN NYANDAK
02/24/2026
Signed off — Alteration
RECONFIGURATION AND RENOVATION OF KITCHEN AND BATHROOM IN APARTMENT 3E.
M01257389-I1
02/09/2026
Permit issued — Mechanical Systems
M01199679-S2-MS
01/27/2026
Filed — Alteration
INSTALL NEW 3.5 TON AIR CONDITIONING SPLIT SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01199679-P3
01/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/21/2026
Special inspection requirement — Structural Steel - Details
TENZIN NYANDAK
01/21/2026
Special inspection requirement — Structural Steel - Welding
TENZIN NYANDAK
01/21/2026
Special inspection requirement — Final
TENZIN NYANDAK
01/11/2026
Filed — Alteration
INSTALL NEW 3.5 TON AIR CONDITIONING SPLIT SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01199679-S2
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/11/2025
Objection raised — Admin
12/11/2025
Objection raised — Admin
11/25/2025
Objection resolved — Addressed
11/24/2025
Filed — Alteration
RECONFIGURATION AND RENOVATION OF KITCHEN AND BATHROOM IN APARTMENT 3E.
M01257389-P1
11/19/2025
Objection raised — Scope
11/19/2025
Special inspection requirement — Final
Anh Montgomery
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
11/14/2025
Filed — Alteration
INSTALL NEW 3.5 TON AIR CONDITIONING SPLIT SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01199679-P2
11/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/12/2025
Special inspection requirement — Final
ROMIT GAJJAR
11/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TENZIN NYANDAK
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TENZIN NYANDAK
11/01/2025
Filed — Alteration
INSTALL NEW 3.5 TON AIR CONDITIONING SPLIT SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01199679-P1
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TENZIN NYANDAK
10/21/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
10/16/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/12/2025
Permit issued — Plumbing
M01199679-S3-PL
09/09/2025
Permit issued — Structural
M01199679-S1-ST
09/02/2025
Permit issued — General Construction
M01257389-I1-GC
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TENZIN NYANDAK
08/21/2025
Permit issued — General Construction
M01199679-I1-GC
08/15/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Admin
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Cost
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Admin
08/11/2025
Objection resolved — Addressed
07/31/2025
Filed — Alteration
RECONFIGURATION AND RENOVATION OF KITCHEN AND BATHROOM IN APARTMENT 3E.
M01257389-I1
07/31/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/11/2025
Objection raised — Admin
07/11/2025
Objection raised — Inspections
07/11/2025
Objection raised — Admin
07/11/2025
Objection raised — Other
07/11/2025
Objection raised — Admin
07/11/2025
Objection raised — Scope
07/11/2025
Objection raised — Scope
07/11/2025
Objection raised — Scope
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNAC RESTORATION LLC07/16/2026
DOB NOWStructuralPermit IssuedNAC RESTORATION LLC07/16/2026
DOB NOWMechanical SystemsPermit IssuedNAC RESTORATION LLC02/09/2026
DOB NOWPlumbingPermit IssuedBLAZE PLUMBING & HEATING09/12/2025
DOB NOWStructuralPermit IssuedNAC RESTORATION LLC09/09/2025
DOB NOWGeneral ConstructionSigned-offDUTCHESS CABINETS OF NY *09/02/2025
DOB NOWGeneral ConstructionPermit IssuedNAC RESTORATION LLC08/21/2025
DOB NOWPlumbingSigned-offCITY GAS HTG SVC CO INC06/01/2023
DOB NOWMechanical SystemsSigned-offCOTTAM HEATING AIR COND05/22/2023
DOB NOWGeneral ConstructionSigned-offDUTCHESS CABINETS OF NY *05/18/2023
DOB NOWGeneral ConstructionSigned-offALL DIMENSION HOME IMPROV10/28/2022
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC12/28/2021
DOB NOWGeneral ConstructionSigned-offALL DIMENSION HOME IMPROV11/10/2021
DOB NOWConstruction FenceSigned-offALL DIMENSION HOME IMPROV11/08/2021
DOB NOWConstruction FenceSigned-offALL DIMENSION HOME IMPROV11/08/2021
DOB NOWConstruction FenceSigned-offALL DIMENSION HOME IMPROV11/08/2021
DOB NOWConstruction FenceSigned-offALL DIMENSION HOME IMPROV10/21/2021
BISOTISSUEDNICK VILLANI AND CO., INC09/12/2016
BISPLISSUEDFIVE STAR P&H CO,INC01/19/2016
BISMHISSUEDGLEN WAY CORP01/13/2016
BISOTISSUEDGLEN WAY CORP12/15/2015
BISPLISSUEDAP PLUMBING & HVAC LLC11/30/2015
BISPLISSUEDAPOLLO PLBG & HTG INC09/28/2015
BISOTISSUEDNICK VILLANI AND CO., INC09/25/2015
BISOTISSUEDNICK VILLANI AND CO., INC09/24/2015
BISPLISSUEDCROSSFIELD PLBG.&HTG09/09/2015
BISOTISSUEDNICK VILLANI AND CO., INC08/28/2015
BISPLISSUEDAP PLUMBING & HVAC LLC12/18/2014
BISMHISSUEDNICK VILLANI AND CO., INC11/05/2014
BISOTISSUEDNICK VILLANI AND CO., INC11/05/2014
BISOTISSUEDALPINE CONSTR & DEV. LLC ELOPMEN04/25/2008
BISEQISSUEDOUTDOOR INSTALLATIONS LLC02/26/2008
BISEQISSUEDOUTDOOR INSTALLATIONS LLC11/16/2007
BISEQISSUEDOUTDOOR INSTALLATIONS LLC04/20/2007
BISEQISSUEDOUTDOOR INSTALLATIONS LLC04/19/2007
BISPLISSUEDPP COUSIN INC11/19/2004
BISEQISSUEDSTONELEDGE SCAFFOLDING CORP06/29/2004
BISOTISSUEDWESTCHESTER CUSTON KITCHENS INC06/11/2004
BISBLISSUEDROCKWAY FUEL OIL CORP02/03/1998
BISFBISSUEDROCKAWAY FUEL OIL CORP.02/19/1991
1 project · most recent 01/27/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/27/2026Permit IssuedNAC RESTORATION LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEAD-AA24NL 24,000 BTU · Vrf Indoor ×1
PEAD-AA42NL 44,000 BTU · Vrf Indoor ×1
PUZ-AH24NL 21,200 BTU · Split System ×1
PUZ-AKA42NL 42,000 BTU · Split System ×1
1 project · most recent 01/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/27/2026Permit IssuedBLAZE PLUMBING & HEATINGGas, Water/Sanitary
4 projects · most recent 06/10/2026
General Wiring
FiledStatusContractorScope
06/10/2026CompleteBNH ELECTRICAL CORPGeneral Wiring
03/06/2026Permit IssuedBNH ELECTRICAL CORPGeneral Wiring
12/16/2025Permit IssuedDENMAR ELECTRIC CORPGeneral Wiring
07/10/2023CompleteCAVAN ELECTRIC CORP.General Wiring
1 project · most recent 01/27/2026
Steel
FiledStatusContractorScope
01/27/2026Permit IssuedNAC RESTORATION LLCSteel
1 project · most recent 11/24/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
11/24/2025Signed-offDUTCHESS CABINETS OF NY *Tenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/12/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
10/16/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/25/2026Structural Steel - DetailsTENZIN NYANDAKspecial
02/25/2026Structural Steel - WeldingTENZIN NYANDAKspecial
02/25/2026FinalTENZIN NYANDAKprogress
01/21/2026Structural Steel - DetailsTENZIN NYANDAKspecial
01/21/2026Structural Steel - WeldingTENZIN NYANDAKspecial
01/21/2026FinalTENZIN NYANDAKprogress
11/19/2025FinalAnh Montgomeryprogress
11/19/2025Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
11/14/2025Fire-Resistance Rated Construction—progress
11/12/2025FinalROMIT GAJJARprogress
11/12/2025Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
11/07/2025Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
10/29/2025Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
08/27/2025Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
03/24/2025Mechanical SystemsTENZIN NYANDAKspecial
03/24/2025FinalTENZIN NYANDAKprogress
03/10/2023Fire-Resistant Penetrations and JointsDavid Hottenrothspecial
03/10/2023Mechanical SystemsDavid Hottenrothspecial
03/10/2023FinalDavid Hottenrothprogress
03/10/2023FinalDavid Hottenrothprogress
10/01/2021FinalEdward Gutermanprogress
10/01/2021Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
▾Documents — 184 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/03/2026M00602595-I1Request digital key ↗
09/03/2026M00597427-I1Request digital key ↗
09/03/2026M00597437-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits35
▸DOB NOWLPC Approval/Permit14
09/03/2026M00597437-I1Open ↗
08/13/2026M00842564-I1Open ↗
08/13/2026M01257389-I1Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION12
09/28/2016122431984Open ↗
01/28/2016122522010Open ↗
01/22/2016122522010Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
02/17/2016122522010Open ↗
12/11/2015122263004Open ↗
10/30/2015122522010Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications50
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
08/10/2018122431984Open ↗
07/25/2016122263004Open ↗
04/27/2016122136919Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/03/2026M00597437-I1Open ↗
08/31/2026M00842430-I1Open ↗
08/31/2026M00842560-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M00842560-I1Open ↗
09/01/2026M00602595-I1Open ↗
08/27/2026M01199679-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026M00842560-I1Open ↗
09/01/2026M00597437-I1Open ↗
08/27/2026M01199679-P3Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/07/2007110038646Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/07/2007110038646Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
02/17/2016122522010Open ↗
12/11/2015122263004Open ↗
10/30/2015122522010Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
01/11/2016122431984Open ↗
11/03/2015122136919Open ↗
▸BISSCHEDULE B - PLUMBING1
03/10/2015122263004Open ↗
▸Safety & Tenant Protection2
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/14/2015122522010Open ↗
▸BISSTREET TREE CHECKLIST1
10/30/2015122522010Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/03/2026M00597437-I1Open ↗
08/21/2026M01199679-P3Open ↗
08/21/2026M01199679-S2Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)5
03/10/2015122263004Open ↗
03/10/2015122263004Open ↗
03/10/2015122263004Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/17/2015122522010Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/07/2007110038646Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026M01199679-S3Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
04/27/2016122136919Open ↗
04/27/2016122263004Open ↗
04/05/2016122136919Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/10/2018122431984Open ↗
04/27/2016122263004Open ↗
03/31/2016122136919Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/10/2015122263004Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLANDMARKS APPROVAL7
07/25/2016122263004Open ↗
03/31/2016122136919Open ↗
12/14/2015122522010Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/10/2018122431984Open ↗
09/12/2016122263004Open ↗
09/12/2016122263004Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/05/2016122136919Open ↗
12/17/2015122522010Open ↗
▸BISSUPERSEDING LETTER1
12/28/2015122263004Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/07/2007110038646Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
08/10/2018122431984Open ↗
04/05/2016122136919Open ↗
10/30/2015122522010Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
10/30/2015122522010Open ↗
07/13/2015122431984Open ↗
03/10/2015122263004Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
01/25/2016122522010Open ↗
▸BISBOROUGH INTAKE FORM1
08/10/2018122431984Open ↗
▸Other Documents11
▸DOB NOWProof of Historic Building7
08/13/2026M01257389-I1Open ↗
08/13/2026M01257389-P1Open ↗
08/13/2026M01199679-P2Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
12/17/2015122522010Open ↗
10/12/2015122263004Open ↗
10/12/2015122263004Open ↗
Showing 3 of 4 on file for this type