← Back
BuildNYC
Two family frame
157 FOCH AVENUE
STATEN ISLAND · BIN 5047791
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3XZoning
2,512 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.63 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 20 docs
Attic3p · 1 filing · 20 docs
Floor 210p · 1 filing · 20 docs
Floor 1Proposed 8' construction fence33p · 2 filings · 20 docs
Cellar11p · 1 filing · 20 docs
Site & exterior3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rogers Calvanico Group504/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rogers Calvanico Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fas BuildingGeneral Contractor807/08/2026
Fas BuildingScaffold403/21/2026
S.T.K. ElectricalElectrical103/22/2026
MPC Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738212/16/2022
SRA Planning & Expediting5677212/16/2022
Building Lifecycle
08/13/2023
Permit expired, never signed off — Foundation
The city's record still shows this permit as issued, with no sign-off on its filing
S00752035-I1-GC-CX
04/25/2023
Signed off — New Building
CONSTRUCT TWO FAMILY DETACHED RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR 2 CARS AND DETACHED ONE CAR GARAGE FILED UNDER SEPARATE APPLICATION.
S00752035-S2
04/24/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/20/2023
Signed off — New Building
CONSTRUCT TWO FAMILY DETACHED RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR 2 CARS AND DETACHED ONE CAR GARAGE FILED UNDER SEPARATE APPLICATION.
S00752035-S1
04/18/2023
Signed off — Alteration
S00681466-I1
56 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offFas Building04/18/2023
DOB NOWConstruction FenceSigned-offFas Building03/31/2023
DOB NOWFoundationPermit IssuedFas Building02/15/2023
DOB NOWStructuralPermit IssuedFas Building09/29/2022
DOB NOWPlumbingSigned-offMPC Plumbing & Heating09/03/2022
DOB NOWStructuralPermit IssuedFas Building08/11/2022
DOB NOWConstruction FenceSigned-offFas Building03/10/2022
BIS—ISSUEDFas Building03/31/2022
1 project · most recent 04/14/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/14/2023Signed-offMPC Plumbing & HeatingGas, Storm, Water/Sanitary
1 project · most recent 12/08/2022
General Wiring
FiledStatusContractorScope
12/08/2022CompleteS.T.K. ElectricalGeneral Wiring
1 project · most recent 04/14/2023
Steel Wood
FiledStatusContractorScope
04/14/2023Signed-offFas BuildingSteel, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/24/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
04/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
12/19/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
12/19/2022Subgrade InspectionsWILLIAM MONTAGUEspecial
12/19/2022Structural Steel - WeldingWILLIAM MONTAGUEspecial
12/19/2022Mechanical SystemsWILLIAM MONTAGUEspecial
12/19/2022Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
12/19/2022Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
12/19/2022Footing and FoundationWILLIAM MONTAGUEprogress
12/19/2022Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
12/19/2022FinalWILLIAM MONTAGUEprogress
12/19/2022Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
12/19/2022Structural Wood FrameWILLIAM MONTAGUEprogress
12/19/2022HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
12/19/2022Fenestration air leakageWILLIAM MONTAGUEenergy_progress
12/19/2022Permanent certificateWILLIAM MONTAGUEenergy_progress
12/19/2022Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
12/19/2022Fenestration areasWILLIAM MONTAGUEenergy_progress
12/19/2022Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
12/19/2022Maintenance informationWILLIAM MONTAGUEenergy_progress
12/19/2022MeteringWILLIAM MONTAGUEenergy_progress
12/19/2022Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
12/19/2022HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
12/19/2022Interior lighting powerWILLIAM MONTAGUEenergy_progress
12/19/2022Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
12/19/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
12/19/2022Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
Latest 25 of 62.
85 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account