← Back
STATEN ISLAND
157 LANDER AVENUE
STATEN ISLAND · BIN 5176767
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureFire Protection
Floor 221p · 2 filings · 20 docs
Floor 120p · 1 filing · 20 docs
Basement20p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A E H BUILDERS2107/08/2026
A E DEVELOPMENT404/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS PONISI, ARCHITECT512/26/2025
A TECH ENGINEERING NYC, PLLC.203/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DAWN PONISI403/21/2026
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.E.H BUILDERS CORPGeneral Contractor304/09/2026
FINE MECHANICAL CORPPlumbing207/08/2026
JM MECHANICAL HVAC LLCGeneral Contractor104/09/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738412/26/2025
Building Lifecycle
All (62)Filed (7)Permit Issued (7)Signed Off (5)Inspection (13)Special Inspection (30)
04/29/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/26/2025
Filed — New Building
NEW PLUMBING FIXTURES IN CONJUNCTION WITH NB APPLICATION
S01112396-P1
12/24/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
12/24/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
12/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/24/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
12/24/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
12/24/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
12/24/2025
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
12/24/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/24/2025
Special inspection requirement — Final
anthony santoro
12/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
12/24/2025
Special inspection requirement — Footing and Foundation
anthony santoro
12/24/2025
Special inspection requirement — Preliminary
anthony santoro
12/24/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
12/24/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
12/24/2025
Special inspection requirement — Air barrier — testing
anthony santoro
12/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
12/24/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
12/24/2025
Special inspection requirement — Metering
anthony santoro
12/24/2025
Special inspection requirement — Fenestration areas
anthony santoro
12/24/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
12/24/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
12/24/2025
Special inspection requirement — Permanent certificate
anthony santoro
12/24/2025
Special inspection requirement — Interior lighting power
anthony santoro
12/24/2025
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
12/24/2025
Special inspection requirement — Maintenance information
anthony santoro
10/20/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/14/2025
Signed off — New Building
NEW PLUMBING FIXTURES IN CONJUNCTION WITH NB APPLICATION
S01112396-S1
10/10/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/18/2025
Signed off — Alteration
S01143104-I1
09/16/2025
Permit issued — Mechanical Systems
S01143104-I1-MS
08/21/2025
Signed off — Alteration
INSTALLATION OF FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01138828-I1
08/21/2025
Signed off — Alteration
S01112411-I1
08/20/2025
Signed off — New Building
NEW PLUMBING FIXTURES IN CONJUNCTION WITH NB APPLICATION
S01112396-S2
07/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/22/2025
Permit issued — Curb Cut
S01112396-S1-CC
06/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/03/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
06/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/29/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
04/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/01/2025
Permit issued — Plumbing
S01138828-I1-PL
03/13/2025
Filed — Alteration
INSTALLATION OF FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01138828-I1
03/12/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/11/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/30/2025
Permit issued — Plumbing
S53024420-S2-PL
12/27/2024
Filed — Alteration
S01143104-I1
12/27/2024
Permit issued — Plumbing
S01112396-S2-PL
12/10/2024
Filed — New Building
NEW PLUMBING FIXTURES IN CONJUNCTION WITH NB APPLICATION
S01112396-S2
12/06/2024
Permit issued — General Construction
S01112396-I1-GC-CX
12/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/05/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
12/05/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
12/05/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/05/2024
Special inspection requirement — Permanent certificate
anthony santoro
11/27/2024
Filed — New Building
NEW PLUMBING FIXTURES IN CONJUNCTION WITH NB APPLICATION
S01112396-S1
11/15/2024
Filed — New Building
NEW PLUMBING FIXTURES IN CONJUNCTION WITH NB APPLICATION
S01112396-I1
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJM MECHANICAL HVAC LLC09/16/2025
DOB NOWCurb CutSigned-offA.E.H BUILDERS CORP07/22/2025
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP04/01/2025
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP01/30/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC12/27/2024
DOB NOWGeneral ConstructionPermit IssuedA.E.H BUILDERS CORP12/06/2024
DOB NOWConstruction FenceSigned-offA.E.H BUILDERS CORP09/19/2024
1 project · most recent 07/15/2025
FiledStatusContractorScope
07/15/2025CompleteA. J. CARUSO ELECTRICAL I2 meters, 2 new_meters
1 project · most recent 12/26/2025
Concrete Wood
FiledStatusContractorScope
12/26/2025Signed-offA.E.H BUILDERS CORPConcrete, Wood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/29/2026Pass-Final General Construction Non-Directive 14PassView ↗
10/20/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/10/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/03/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
06/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/29/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
04/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/12/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/11/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
12/24/2025Concrete - Cast-In-Placeanthony santorospecial
12/24/2025Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
12/24/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
12/24/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
12/24/2025Subgrade Inspectionsanthony santorospecial
12/24/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
12/24/2025Wood – Prefabricated I-Joistsanthony santorospecial
12/24/2025Energy Code Compliance Inspectionsanthony santoroprogress
12/24/2025Finalanthony santoroprogress
12/24/2025Fire-Resistance Rated Constructionanthony santoroprogress
12/24/2025Footing and Foundationanthony santoroprogress
12/24/2025Preliminaryanthony santoroprogress
12/24/2025Structural Wood Frameanthony santoroprogress
12/24/2025Fenestration air leakageanthony santoroenergy_progress
12/24/2025Air barrier — testing anthony santoroenergy_progress
12/24/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
12/24/2025Air barrier - visual inspectionanthony santoroenergy_progress
12/24/2025Meteringanthony santoroenergy_progress
12/24/2025Fenestration areasanthony santoroenergy_progress
12/24/2025Insulation placement and R valuesanthony santoroenergy_progress
12/24/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
12/24/2025Permanent certificateanthony santoroenergy_progress
12/24/2025Interior lighting poweranthony santoroenergy_progress
12/24/2025Protection of exposed foundation insulationanthony santoroenergy_progress
12/24/2025Maintenance informationanthony santoroenergy_progress
Latest 25 of 33.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026S01112411-I1Request digital key ↗
08/20/2026S01143104-I1Request digital key ↗
08/20/2026S01138828-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/12/2024540264239Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/26/2024540264239Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026S01112396-I1Open ↗
08/13/2026S01112396-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/17/2026S01112396-I1Open ↗
08/13/2026S01112396-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/17/2026S01112396-I1Open ↗
08/13/2026S01112396-P1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026S01112411-I1Open ↗
08/20/2026S01143104-I1Open ↗
08/20/2026S01138828-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026S01112396-P1Open ↗
08/29/2026S01112396-P1Open ↗
08/23/2026S01112396-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026S01112396-P1Open ↗
08/29/2026S01112396-P1Open ↗
08/23/2026S01112396-S2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/12/2024540264239Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/12/2024540264239Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/17/2026S01112396-I1Open ↗
08/13/2026S01112396-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/17/2026S01112396-I1Open ↗
08/13/2026S01112396-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01112396-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01112396-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01112396-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT3
08/17/2026S01112396-I1Open ↗
08/13/2026S01112396-P1Open ↗
08/13/2026S01112396-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S01112396-I1Open ↗
08/13/2026S01112396-S2Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
09/26/2024540264239Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/12/2024540264239Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/26/2024540264239Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
09/26/2024540264239Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/12/2024540264239Open ↗
▸Other Documents15
▸BISBPP - SUPPORTING DOCUMENTATION4
09/26/2024540264239Open ↗
09/26/2024540264239Open ↗
09/26/2024540264239Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/17/2026S01112396-I1Open ↗
08/13/2026S01112396-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026S01112396-I1Open ↗
08/13/2026S01112396-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026S01112396-I1Open ↗
08/13/2026S01112396-P1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
09/26/2024540264239Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
09/26/2024540264239Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
09/26/2024540264239Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/26/2024540264239Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01112396-I1Open ↗