← Back
BuildNYC
Two stories - detached, small or mid-size
157 WATERBURY AVENUE
STATEN ISLAND · BIN 5083042
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R3XZoning
3,284 sfGross Floor Area
2Units
2 Active Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 8,900 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 2Unit PH519p · 2 filings · 20 docs
Floor 116p · 2 filings · 20 docs
Basement4p · 2 filings · 20 docs
Sub-Basement13p · 1 filing · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ryan Design Architecture603/12/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Porto ConstructionGeneral Contractor407/08/2026
Charles J. Dehart JR P&HPlumbing207/08/2026
Porto ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Design Architecture7159503/12/2025
Building Lifecycle
03/06/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
S00931072-I1-PL
09/18/2025
Objection raised — Other
09/18/2025
Objection resolved — Resolved
09/05/2025
Objection resolved — Resolved
08/01/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S00855733-I1-GC
64 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCharles J. Dehart JR P&H03/06/2025
DOB NOWGeneral ConstructionPermit IssuedPorto Construction10/11/2024
DOB NOWPlumbingPermit IssuedCharles J. Dehart JR P&H04/10/2024
DOB NOWConstruction FencePermit IssuedPorto Construction01/19/2024
DOB NOWGeneral ConstructionPermit IssuedPorto Construction01/04/2024
1 project · most recent 03/12/2025
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
03/12/2025Permit IssuedCharles J. Dehart JR P&HGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 02/06/2024
FiledStatusContractorScope
02/06/2024Permit IssuedNewbridge Electl Contng—
1 project · most recent 01/09/2024
Fence
FiledStatusContractorScope
01/09/2024Permit IssuedPorto ConstructionFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/23/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/30/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/25/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDaniel Ryanspecial
03/25/2025HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
03/25/2025Maintenance informationDaniel Ryanenergy_progress
03/25/2025HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
03/25/2025HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
03/25/2025Energy Code Compliance InspectionsDaniel Ryanprogress
03/25/2025Fire-Resistant Penetrations and JointsDaniel Ryanspecial
03/10/2025HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
03/10/2025Fire-Resistant Penetrations and JointsDaniel Ryanspecial
03/10/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDaniel Ryanspecial
03/10/2025Energy Code Compliance InspectionsDaniel Ryanprogress
03/10/2025HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
03/10/2025HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
03/10/2025Maintenance informationDaniel Ryanenergy_progress
05/02/2024Energy Code Compliance InspectionsDaniel Ryanprogress
05/02/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDaniel Ryanspecial
05/02/2024Fire-Resistant Penetrations and JointsDaniel Ryanspecial
05/02/2024HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
05/02/2024HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
05/02/2024HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
05/02/2024Maintenance informationDaniel Ryanenergy_progress
09/15/2023Maintenance informationDaniel Ryanenergy_progress
09/15/2023Permanent certificateDaniel Ryanenergy_progress
09/15/2023MeteringDaniel Ryanenergy_progress
06/26/2023Fire-Resistant Penetrations and JointsDaniel Ryanspecial
Latest 25 of 38.
83 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account