ECB07/08/2024NO EN DRAWING APPROVED FROM DOB PROVIDED IN THE JOB SITE AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUMENTS; PLEASE GO TO HTTPS://WWW1.NYC.GOV/SITE/BUILDINGS/CODES/ENERGY-CONSERVATION-CODE.PAGE AND$6K due
ECB05/16/2024OBSERVED MISSING CONSTRUCTION FENCE AT EXP#2, EXP#3 AND EXP#4. PLANS CALL FOR 8FT HEIGH CONSTRUCTION FENCE AT ALL EXPOSURES OF THE JOBSITE. BUILDING IS NOT ENCLOSED WITH HAZARDS ON SITE. JOBSITE IS ACCESSIBLE T$5K due
Two stories - detached, small or mid-size · 8,900 sf lot · 0.37 FAR built · Flood zone X