← Back
Walk-up cooperative
157 WEST 105 STREET
MANHATTAN · Upper West Side-Manhattan Valley · BIN 1055929
💬 Discuss this project
1930Year Built
5Stories
C6Building Class
R8BZoning
17,860 sfGross Floor Area
20Units
Rent Stabilized3 Open Violations ▸
Walk-up cooperative · Owner of record: 157-161 WEST 105 STREET HDFC · 5,046 sf lot · 3.54 FAR built · Flood zone X
Locations of Work
Architecture
Floor 37p · 1 filing · 9 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
157-161 WEST 105 STREET HDFC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT PIA212/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANARK CONSULTING ENGINEERING DPC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL BOROUGH RENOVATIONS CGeneral Contractor603/21/2026
Building Lifecycle
All (49)Filed (2)Permit Issued (2)Signed Off (1)Violation (40)Special Inspection (4)
12/22/2025
Violation issued (HPD, closed)
C
12/22/2025
Violation issued (HPD, closed)
C
06/04/2025
Violation issued (HPD, closed)
A
02/12/2025
Signed off — Alteration
Interior renovation to Apt 3EF; modification to interior non-load bearing partitions, and new interior finishes as per plans. No change to use, egress, or occupancy.
M01116115-I1
12/18/2024
Filed — Alteration
Interior renovation to Apt 3EF; modification to interior non-load bearing partitions, and new interior finishes as per plans. No change to use, egress, or occupancy.
M01116115-P1
12/18/2024
Special inspection requirement — Energy Code Compliance Inspections
REJEP KOLAR
12/18/2024
Special inspection requirement — Final
REJEP KOLAR
12/18/2024
Special inspection requirement — Lighting controls
REJEP KOLAR
12/18/2024
Special inspection requirement — Lighting in dwelling units
REJEP KOLAR
11/29/2024
Permit issued — General Construction
M01116115-I1-GC
11/22/2024
Violation issued (HPD, closed)
I
10/07/2024
Permit issued — General Construction
M01116115-I1-GC
09/25/2024
Filed — Alteration
Interior renovation to Apt 3EF; modification to interior non-load bearing partitions, and new interior finishes as per plans. No change to use, egress, or occupancy.
M01116115-I1
02/24/2024
Violation issued (HPD, closed)
C
11/23/2011
Violation issued (HPD, closed)
A
05/19/1999
Violation issued (HPD, closed)
B
05/19/1999
Violation issued (HPD, closed)
B
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/1989
Violation issued (HPD, closed)
B
08/09/1989
Violation issued (HPD, closed)
B
05/12/1988
Violation issued (HPD, closed)
B
05/12/1988
Violation issued (HPD, closed)
C
05/12/1988
Violation issued (HPD, closed)
B
05/12/1988
Violation issued (HPD, closed)
B
05/12/1988
Violation issued (HPD, closed)
C
05/12/1988
Violation issued (HPD, closed)
C
05/12/1988
Violation issued (HPD, closed)
B
05/12/1988
Violation issued (HPD, closed)
B
05/12/1988
Violation issued (HPD, closed)
B
05/12/1988
Violation issued (HPD, closed)
C
05/12/1988
Violation issued (HPD, closed)
B
05/12/1988
Violation issued (HPD, closed)
B
05/12/1988
Violation issued (HPD, closed)
A
05/12/1988
Violation issued (HPD, closed)
C
05/12/1988
Violation issued (HPD, closed)
B
01/25/1988
Violation issued (HPD, open)
C
01/25/1988
Violation issued (HPD, closed)
B
01/25/1988
Violation issued (HPD, closed)
B
01/25/1988
Violation issued (HPD, closed)
B
01/25/1988
Violation issued (HPD, closed)
C
01/25/1988
Violation issued (HPD, closed)
B
01/25/1988
Violation issued (HPD, closed)
C
01/25/1988
Violation issued (HPD, open)
C
12/21/1985
Violation issued (HPD, open)
C
12/21/1985
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offALL BOROUGH RENOVATIONS C11/29/2024
DOB NOWGeneral ConstructionSigned-offALL BOROUGH RENOVATIONS C10/07/2024
BISOTISSUEDHARON PLG & HTG CORP10/15/1991
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
12/18/2024Energy Code Compliance InspectionsREJEP KOLARprogress
12/18/2024FinalREJEP KOLARprogress
12/18/2024Lighting controlsREJEP KOLARenergy_progress
12/18/2024Lighting in dwelling unitsREJEP KOLARenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026M01116115-P1Request digital key ↗
08/25/2026M01116115-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026M01116115-I1Open ↗
08/25/2026M01116115-I1Open ↗
08/25/2026M01116115-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026M01116115-I1Open ↗
08/13/2026M01116115-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M01116115-P1Open ↗
08/13/2026M01116115-I1Open ↗