Office with commercial, 7-19 stories
157 WEST 18 STREET
MANHATTAN · BIN 1014713
💬 Discuss this project
1906Year Built
7Stories
O6Building Class
C6-2AZoning
26,644 sfGross Floor Area
7Units
LL97 Covered3 Open Violations ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 157 W 18 OWNER LLC · 3,620 sf lot · 7.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionOther
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY2707/08/2026
157 W18 OWNER2203/22/2026
SHANON CONTRACTING LLC1603/22/2026
MJT REALTY1003/22/2026
M&J REALTY LLC103/22/2026
JSL DESIGN103/22/2026
GB II LLC GB III LLC GB IV903/21/2026
BILLY CONTRACTORS203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/20/2019$23.2M—GB II, LLC → 157 W 18 OWNER LLC$871/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KUSHNER STUDIOS312/12/2024
JACK STONE ENGINEERS, PC612/03/2024
SEAL ENGINEERING PC111/28/2023
ASIF JAMIL, RA511/03/2020
JOEL PHAGOO P.E. PLLC106/26/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS1003/21/2026
A1 EXPEDITING SERVICE1003/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor1707/08/2026
COCOZZA GROUP LLCGeneral Contractor707/08/2026
ISAAC ASTRACHANElectrical203/21/2026
CHRIS SIDERISElectrical203/21/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
STEPHEN ROSTOWSKYElectrical103/21/2026
J. CAIAZZO PLBG & HTG CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842912/12/2024
Building Lifecycle
All (159)Filed (16)Permit Issued (16)Signed Off (8)Facade (FISP) (9)Violation (60)Inspection (6)Objection (14)Special Inspection (30)
02/18/2026
Violation issued (ECB, open)
Unknown
02/18/2026
Violation issued (ECB, open)
Unknown
10/16/2025
Signed off — Alteration
RELOCATION OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS OFF OF THE EXISTING BUILDING SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS
M00914227-S4
09/18/2025
Signed off — Alteration
RELOCATION OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS OFF OF THE EXISTING BUILDING SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS
M00914227-I1
09/05/2025
Signed off — Alteration
RELOCATION OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS OFF OF THE EXISTING BUILDING SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS
M00914227-S3
08/19/2025
Signed off — Alteration
RELOCATION OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS OFF OF THE EXISTING BUILDING SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS
M00914227-S1
08/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/18/2025
Signed off — Alteration
RELOCATION OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS OFF OF THE EXISTING BUILDING SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS
M00914227-S2
08/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
CONNIE PISANI
06/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CONNIE PISANI
06/20/2025
Special inspection requirement — Maintenance information
CONNIE PISANI
06/20/2025
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
06/20/2025
Special inspection requirement — Final
CONNIE PISANI
06/20/2025
Special inspection requirement — Mechanical Systems
CONNIE PISANI
06/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
06/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
CONNIE PISANI
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
01/21/2025
Objection resolved — Addressed
01/16/2025
Objection raised — Energy
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
01/09/2025
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
01/09/2025
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
01/02/2025
Objection resolved — Addressed
12/27/2024
Special inspection requirement — Lighting controls
CONNIE PISANI
12/27/2024
Special inspection requirement — Fire-Resistance Rated Construction
CONNIE PISANI
12/27/2024
Special inspection requirement — Final
CONNIE PISANI
12/27/2024
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
12/27/2024
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
12/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
12/27/2024
Special inspection requirement — Fenestration air leakage
CONNIE PISANI
12/27/2024
Special inspection requirement — Exterior lighting power
CONNIE PISANI
12/27/2024
Special inspection requirement — Insulation placement and R values
CONNIE PISANI
12/27/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CONNIE PISANI
12/27/2024
Special inspection requirement — Interior lighting power
CONNIE PISANI
12/16/2024
Objection raised — Scope
12/16/2024
Objection raised — Scope
12/16/2024
Objection raised — Scope
12/12/2024
Filed — Alteration
RELOCATION OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS OFF OF THE EXISTING BUILDING SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS
M00914227-P1
12/12/2024
Special inspection requirement — Exterior lighting power
CONNIE PISANI
12/03/2024
Filed — Alteration
RELOCATION OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS OFF OF THE EXISTING BUILDING SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS
M00914227-P4
12/03/2024
Filed — Alteration
RELOCATION OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS OFF OF THE EXISTING BUILDING SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS
M00914227-P2
12/03/2024
Filed — Alteration
RELOCATION OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS OFF OF THE EXISTING BUILDING SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS
M00914227-P3
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2024
Permit issued — Structural
M00914227-S4-ST
11/13/2024
Permit issued — General Construction
M00914227-I1-GC
11/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CONNIE PISANI
11/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
11/13/2024
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
11/13/2024
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
11/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
CONNIE PISANI
11/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
CONNIE PISANI
11/13/2024
Special inspection requirement — Maintenance information
CONNIE PISANI
11/05/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/31/2024
Permit issued — Sprinklers
M00914227-S3-EW-SP
10/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2024
Permit issued — Structural
M00914227-S4-ST
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offCOCOZZA GROUP LLC11/14/2024
DOB NOWGeneral ConstructionSigned-offCOCOZZA GROUP LLC11/13/2024
DOB NOWSprinklersSigned-offANTHONY CAIAZZO10/31/2024
DOB NOWStructuralSigned-offCOCOZZA GROUP LLC05/20/2024
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR04/02/2024
DOB NOWGeneral ConstructionSigned-offCOCOZZA GROUP LLC03/15/2024
DOB NOWMechanical SystemsSigned-offCOCOZZA GROUP LLC03/15/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/12/2021
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC02/11/2021
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC11/05/2020
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/25/2020
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC09/18/2020
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC02/25/2020
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/25/2020
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC06/26/2019
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC04/05/2019
BIS—ISSUEDJSL DESIGN INC10/05/2022
BIS—ISSUEDJSL DESIGN INC08/22/2022
BISPLISSUEDRRP PLUMBING CORP02/04/2022
BISOTISSUEDJSL DESIGN INC12/08/2021
BISMHISSUEDJSL DESIGN INC12/08/2021
BISSPISSUEDRRP PLUMBING CORP09/27/2021
BIS—ISSUEDJSL DESIGN INC07/20/2021
BIS—ISSUEDSHANNON CONTRACTING LLC07/07/2021
BISMHISSUEDJSL DESIGN INC12/17/2020
BISOTISSUEDJSL DESIGN INC12/14/2020
BISMHISSUEDJSL DESIGN INC10/08/2020
BISOTISSUEDJSL DESIGN INC10/08/2020
BIS—ISSUEDSHANNON CONTRACTING LLC09/30/2020
BISPLISSUEDRRP PLUMBING CORP07/27/2020
BISSPISSUEDRRP PLUMBING CORP07/27/2020
BISMHISSUEDJSL DESIGN INC07/08/2020
BISOTISSUEDJSL DESIGN INC07/08/2020
BIS—ISSUEDSHANNON CONTRACTING LLC06/02/2020
BIS—ISSUEDSHANNON CONTRACTING LLC06/02/2020
BIS—ISSUEDSHANNON CONTRACTING LLC04/27/2020
BIS—ISSUEDSHANNON CONTRACTING LLC04/27/2020
BISPLISSUEDRRP PLUMBING CORP03/12/2020
BISMHISSUEDLEX CONTRACTING & CONSTRU02/11/2020
BISOTISSUEDLEX CONTRACTING & CONSTRU02/11/2020
+ 22 more permits on file
6 projects · most recent 03/13/2025
General Wiring Lighting
FiledStatusContractorScope
03/13/2025CompleteLAREDO ELECTRIC, INC.General Wiring
11/18/2024CompleteORPHEOUS ELECTRICAL INC1 meters
09/27/2023CompleteY.S ELECTRICGeneral Wiring, Lighting
03/02/2023CompleteY.S ELECTRICGeneral Wiring, Lighting
02/05/2020CompleteSTAR ELEC'L CONTRACTORS C—
03/22/2019CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
06/20/2025HVAC-R and service water heating equipmentCONNIE PISANIenergy_progress
06/20/2025HVAC-R and service water piping design and insulationCONNIE PISANIenergy_progress
06/20/2025Maintenance informationCONNIE PISANIenergy_progress
06/20/2025Energy Code Compliance InspectionsCONNIE PISANIprogress
06/20/2025FinalCONNIE PISANIprogress
06/20/2025Mechanical SystemsCONNIE PISANIspecial
06/20/2025Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
06/20/2025HVAC-R and service water heating system controlsCONNIE PISANIenergy_progress
01/09/2025Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
01/09/2025Sprinkler SystemsCONNIE PISANIspecial
01/09/2025Post-installed AnchorsCONNIE PISANIspecial
12/27/2024Lighting controlsCONNIE PISANIenergy_progress
12/27/2024Fire-Resistance Rated ConstructionCONNIE PISANIprogress
12/27/2024FinalCONNIE PISANIprogress
12/27/2024Energy Code Compliance InspectionsCONNIE PISANIprogress
12/27/2024Post-installed AnchorsCONNIE PISANIspecial
12/27/2024Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
12/27/2024Fenestration air leakageCONNIE PISANIenergy_progress
12/27/2024Exterior lighting powerCONNIE PISANIenergy_progress
12/27/2024Insulation placement and R valuesCONNIE PISANIenergy_progress
12/27/2024Fenestration and door U-factor and product ratingsCONNIE PISANIenergy_progress
12/27/2024Interior lighting powerCONNIE PISANIenergy_progress
12/12/2024Exterior lighting powerCONNIE PISANIenergy_progress
11/13/2024HVAC-R and service water piping design and insulationCONNIE PISANIenergy_progress
11/13/2024Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
Latest 25 of 47.
▾Documents — 347 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch9
08/28/2026M00914227-S2Request digital key ↗
08/28/2026M00914227-S4Request digital key ↗
08/28/2026M00914227-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/05/2026M00144387-I1Request digital key ↗
08/15/2026M00144387-P3Request digital key ↗
08/15/2026M00144387-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00144718-I1Request digital key ↗
09/04/2026M00423050-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/28/2026M00966305-I1Request digital key ↗
▸Applications & Permits69
▸BISPLAN / WORK APPROVAL APPLICATION38
12/17/2025121189515Open ↗
04/11/2025121189515Open ↗
10/11/2023121189515Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION30
08/25/2022121189515Open ↗
07/21/2021121189515Open ↗
07/19/2021121189515Open ↗
Showing 3 of 30 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/01/2021121189515Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
04/21/2022121189515Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications63
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
05/24/2019121189515Open ↗
05/06/2019121189515Open ↗
05/06/2019121189515Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/05/2026M00144387-I1Open ↗
08/28/2026M00914227-S3Open ↗
08/28/2026M00914227-S4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026M00914227-P2Open ↗
09/23/2026M00914227-P2Open ↗
08/31/2026M00144718-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00914227-P2Open ↗
08/27/2026M00914227-S2Open ↗
08/27/2026M00914227-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment26
▸BISEQUIPMENT USE PERMITS8
08/01/2022121189515Open ↗
03/14/2022121189515Open ↗
03/14/2022121189515Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING7
12/23/2021140837995Open ↗
12/06/2021140837995Open ↗
06/11/2019140837995Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
08/01/2022121189515Open ↗
05/06/2022121189515Open ↗
03/14/2022121189515Open ↗
Showing 3 of 4 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
02/15/2022123850500Open ↗
02/03/2022121189515Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
02/15/2022123850500Open ↗
02/03/2022121189515Open ↗
▸BISSTANDPIPE SYSTEMS1
02/04/2022140837995Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
02/04/2022140837995Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
04/21/2022121189515Open ↗
Showing 1 of 2 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
02/03/2022121189515Open ↗
▸BISSTREET TREE SIGNOFF1
06/20/2022121189515Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026M00914227-S1Open ↗
08/28/2026M00914227-S2Open ↗
08/28/2026M00914227-S4Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
05/15/2019121189515Open ↗
04/01/2019123850500Open ↗
Showing 2 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
05/24/2019121189515Open ↗
05/06/2019121189515Open ↗
05/06/2019121189515Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/05/2025121189515Open ↗
02/15/2022123850500Open ↗
▸BISINTERIOR LIGHTING POWER2
02/15/2022123850500Open ↗
02/03/2022121189515Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLIGHTING CONTROLS2
02/15/2022123850500Open ↗
02/03/2022121189515Open ↗
▸BIS* HVAC INSULATION AND SEALING2
02/15/2022123850500Open ↗
02/03/2022121189515Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/03/2022121189515Open ↗
▸BISFENESTRATION AREAS1
02/03/2022121189515Open ↗
▸BISFENESTRATION AIR LEAKAGE1
02/03/2022121189515Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY9
05/06/2019121189515Open ↗
05/06/2019121189515Open ↗
04/01/2019140837995Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX7
07/25/2019121189515Open ↗
07/25/2019121189515Open ↗
07/11/2019121189515Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
07/11/2019121189515Open ↗
06/11/2019121189515Open ↗
▸BISMECHANICAL SYSTEMS2
02/15/2022123850500Open ↗
02/03/2022121189515Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
02/15/2022123850500Open ↗
02/03/2022121189515Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
02/03/2022121189515Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/03/2022121189515Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
02/04/2022121189515Open ↗
▸BISSOIL REPORT1
03/27/2019121189515Open ↗
▸BISMASONRY1
02/03/2022121189515Open ↗
▸BISPOST-INSTALLED ANCHORS1
02/03/2022121189515Open ↗
▸Approvals, Objections & Sign-offs23
▸BISSCHEDULE A - OCCUPANCY / USE7
12/17/2025121189515Open ↗
10/11/2023121189515Open ↗
08/11/2023121189515Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER5
07/21/2021121189515Open ↗
07/19/2021121189515Open ↗
09/30/2020121189515Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/14/2026123714070Open ↗
01/09/2023140837995Open ↗
02/16/2022123850500Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/03/2022121189515Open ↗
07/21/2021121189515Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT8
04/10/2025121189515Open ↗
04/01/2019140837995Open ↗
03/22/2019123714070Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
08/23/2022121189515Open ↗
07/19/2021121189515Open ↗
09/30/2020121189515Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
01/13/2026123714070Open ↗
01/03/2023140837995Open ↗
02/15/2022123850500Open ↗
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION16
08/03/2022121189515Open ↗
04/21/2022121189515Open ↗
01/19/2022121189515Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET8
03/26/2019121189515Open ↗
Showing 1 of 8 on file for this type
▸BISBOROUGH INTAKE FORM3
07/19/2021121189515Open ↗
07/08/2020123850500Open ↗
06/12/2020121189515Open ↗
▸BISeFiling Job Application Cover Sheet2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents6
▸BISPLOT DIAGRAM2
04/19/2022121189515Open ↗
06/10/2019121189515Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/17/2019123850500Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
12/30/2025121189515Open ↗
▸BISUNDERPINNING1
02/03/2022121189515Open ↗