← Back
BuildNYC
Elevator apt, semi-fireproof without stores
157 WEST KINGSBRIDGE ROAD
BRONX · BIN 2129015
💬 Discuss this project
2021Year Built
6Stories
D1Building Class
R6Zoning
13,934 sfGross Floor Area
20Units
Rent Stabilized7 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: Terrace Acquisition III · 4,781 sf lot · 2.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTelehandler installation and use1p · 1 filing · 3 docs
Floor 6Telehandler installation and use1p · 1 filing · 3 docs
Floor 5Telehandler installation and use1p · 1 filing · 3 docs
Floor 4Telehandler installation and use1p · 1 filing · 3 docs
Floor 3Telehandler installation and use1p · 1 filing · 3 docs
Floor 2Telehandler installation and use1p · 1 filing · 3 docs
Floor 1Nostrand Land LLC4p · 2 filings · 5 docs
Site & exteriorTerrace Acqusition Lll, LLC15p · 4 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Terrace Acquisition III3207/08/2026
Cavu Property Group907/08/2026
Agra Masonry503/22/2026
Cavu Property303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/27/2016$127K—TERRACE HEALTH CARE CENTER, INC. → TERRACE ACQUISITION III, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Lombardo Professional Engineering103/21/2026
BMG Group USA203/21/2026
Green Studio403/21/2026
George E Berger Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cityscape BuildersScaffold1107/08/2026
Manhattan D EnterprisesScaffold607/08/2026
Cityscape BuildersGeneral Contractor303/21/2026
Blake Electric Contracting Co., IElectrical103/21/2026
Y.S. ElectricElectrical103/21/2026
Building Lifecycle
10/08/2026
Elevator Category 1 inspection report filed
06/13/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT COMPACTOR CLOSET, 2nd STORY
HPD violation · open
06/13/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT COMPACTOR CLOSET, 2nd STORY
HPD violation · open
08/17/2024
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THEN 10 SQ FT AT NORTH WALL IN THE 1st ROOM FROM EAST…
HPD violation · open
07/14/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
42 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedCityscape Builders09/09/2022
DOB NOWCurb CutSigned-offCityscape Builders09/03/2022
DOB NOWConstruction FenceSigned-offCityscape Builders07/08/2022
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises05/06/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises04/08/2022
DOB NOWConstruction FenceSigned-offCityscape Builders08/02/2021
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises05/06/2021
DOB NOWProtection and Mechanical MethodsSigned-offCityscape Builders05/04/2021
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises04/26/2021
DOB NOWConstruction FenceSigned-offCityscape Builders08/31/2020
BISSPISSUEDTarget Piping NY05/19/2022
BIS—ISSUEDCityscape Builders03/30/2022
BISPLISSUEDB&B Mechanical Plumbing & Heating03/14/2022
BIS—ISSUEDCityscape Builders04/13/2021
BISPLISSUEDB&B Mechanical Plumbing & Heating03/18/2021
BISOTISSUEDCityscape Builders02/05/2021
BIS—ISSUEDCityscape Builders02/05/2021
BISEQISSUEDCityscape Builders02/05/2021
BIS—ISSUEDCityscape Builders02/05/2021
BISOTISSUEDCityscape Builders01/11/2021
BIS—ISSUEDCityscape Builders11/13/2020
BIS—ISSUEDCityscape Builders11/13/2020
BIS—ISSUEDCityscape Builders08/12/2020
BIS—ISSUEDCityscape Builders08/12/2020
BISEQISSUEDCityscape Builders08/10/2020
BIS—ISSUEDXolle Demo05/02/2017
BISEQISSUEDXolle Demo04/28/2017
BISOTISSUEDRelaible Quality Construction02/12/2002
4 projects · most recent 12/19/2022
General Wiring
FiledStatusContractorScope
12/19/2022CompleteStar Electrical Contractors—
05/15/2022CompleteLightforce Electrical Contng I—
05/15/2022CompleteLightforce Electrical Contng IGeneral Wiring
03/06/2022CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/10/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
11/03/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
11/03/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/16/2021FinalFADY HABEELprogress
04/14/2021FinalFADY HABEELprogress
03/17/2021FinalMichael Lombardoprogress
07/12/2018FinalSoorjbally Harilallprogress
326 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account