← Back
Large suburban residence
157 WESTCOTT BOULEVARD
STATEN ISLAND · Westerleigh-Castleton Corners · BIN 5010413
💬 Discuss this project
1955Year Built
2Stories
A3Building Class
R2Zoning
4,068 sfGross Floor Area
1Units
Large suburban residence · 6,000 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC202/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272202/09/2024
Building Lifecycle
All (14)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (10)
05/20/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00998666-I1
02/14/2024
Permit issued — Solar
S00998666-I1-SL
02/09/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00998666-P1
02/09/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
02/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
02/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
02/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
02/09/2024
Special inspection requirement — Final
Walid Abdulla
02/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
02/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
02/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
02/08/2024
Special inspection requirement — Final
Walid Abdulla
02/08/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
02/07/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00998666-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/14/2024
BISPLISSUEDLOUIS L.BUTTERMARK & SONS07/06/2018
BISOTISSUEDTROOST BROS INC06/26/2018
BISEQISSUEDTROOST BROS INC08/08/2006
BISPLISSUEDSTEVEN THOMAS HTG INC01/12/2006
BISEQISSUEDTROOST BROS INC01/06/2006
BISEQISSUEDTROOST BROS INC11/29/2005
BIS—ISSUEDTROOST BROS INC11/29/2005
2 projects · most recent 02/07/2024
General Wiring Lighting
FiledStatusContractorScope
02/07/2024CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
07/15/2018CompleteRIDGE ELECTRIC CORP.General Wiring, Lighting
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
02/09/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
02/09/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
02/09/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
02/09/2024Energy Code Compliance InspectionsWalid Abdullaprogress
02/09/2024FinalWalid Abdullaprogress
02/08/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
02/08/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
02/08/2024Energy Code Compliance InspectionsWalid Abdullaprogress
02/08/2024FinalWalid Abdullaprogress
02/08/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026S00998666-I1Request digital key ↗
08/21/2026S00998666-P1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
07/09/2018520334282Open ↗
06/28/2018520334282Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/28/2018520334282Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026S00998666-I1Open ↗
08/26/2026S00998666-I1Open ↗
08/26/2026S00998666-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026S00998666-I1Open ↗
08/26/2026S00998666-I1Open ↗
08/26/2026S00998666-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/05/2018520334282Open ↗
06/28/2018520334282Open ↗
06/28/2018520334282Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026S00998666-I1Open ↗
08/13/2026S00998666-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/28/2018520334282Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/28/2018520334282Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/28/2018520334282Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
06/28/2018520334282Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026S00998666-I1Open ↗
08/13/2026S00998666-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/28/2018520334282Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/05/2018520334282Open ↗
06/28/2018520334282Open ↗
06/28/2018520334282Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/05/2018520334282Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/05/2018520334282Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/28/2018520334282Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S00998666-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/05/2018520334282Open ↗
06/28/2018520334282Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
06/28/2018520334282Open ↗
▸BISBOROUGH INTAKE FORM1
09/05/2018520334282Open ↗