ECB06/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #907944. REMEDY: SUBMIT ACCEPTABLE REQUNothing owed — awaiting certificate of correction
General warehouse · 12,500 sf lot · 3.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.