← Back
Two family converted from one family
158-17 90 STREET
QUEENS · Howard Beach-Lindenwood · BIN 4293019
💬 Discuss this project
1950Year Built
1.5Stories
B3Building Class
R2Zoning
1,125 sfGross Floor Area
2Units
3 Open Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family converted from one family · 5,000 sf lot · 0.23 FAR built · Flood zone AE
Locations of Work
ArchitectureLandscapeGeneral
Filed — no permit issued6p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHN D CALCAGNILE ARCHITECT310/09/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495310/09/2025
Building Lifecycle
All (18)Filed (3)Violation (6)Special Inspection (9)
10/24/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/24/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rajasekhar Sakhamuri
10/24/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
10/09/2025
Filed — Alteration
Install a drywell, grit chamber and underground storm drainage piping system in rear yard inconjuncton with the legalization of existing wood frame roofed covered portico/canopy at rear first floor.
Q01072170-P1
10/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rajasekhar Sakhamuri
10/09/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/09/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
09/11/2025
Special inspection requirement — Lowest Floor Elevation
08/22/2025
Filed — Alteration
Install a drywell, grit chamber and underground storm drainage piping system in rear yard inconjuncton with the legalization of existing wood frame roofed covered portico/canopy at rear first floor.
Q01072170-S1
09/19/2024
Filed — Alteration
Install a drywell, grit chamber and underground storm drainage piping system in rear yard inconjuncton with the legalization of existing wood frame roofed covered portico/canopy at rear first floor.
Q01072170-I1
09/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
09/09/2024
Special inspection requirement — Subgrade Inspections
Rajasekhar Sakhamuri
09/21/2012
Violation issued (ECB, closed)
Zoning
02/03/2012
Violation issued (ECB, closed)
Construction
05/18/2011
Violation issued (ECB, open)
Unknown
09/10/2010
Violation issued (ECB, open)
Construction
05/07/2010
Violation issued (ECB, closed)
Construction
12/03/2008
Violation issued (ECB, open)
Construction
Nothing on file for this building.
1 project · most recent 10/09/2025
Storm
FiledStatusContractorScope
10/09/2025——Storm
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/24/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/24/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRajasekhar Sakhamurispecial
10/24/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
10/09/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRajasekhar Sakhamurispecial
10/09/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/09/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
09/11/2025Lowest Floor Elevation—progress
09/09/2024Fire-Resistance Rated Construction—progress
09/09/2024Subgrade InspectionsRajasekhar Sakhamurispecial
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q01072170-I1Request digital key ↗
08/21/2026Q01072170-P1Request digital key ↗
08/21/2026Q01072170-S1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
09/17/2012420025626Open ↗
06/04/2009420025626Open ↗
▸BISWORK PERMIT APPLICATION1
07/22/2009420025626Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01072170-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q01072170-S1Open ↗
09/02/2026Q01072170-S1Open ↗
09/02/2026Q01072170-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q01072170-P1Open ↗
08/21/2026Q01072170-S1Open ↗
08/21/2026Q01072170-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/22/2009420025626Open ↗
06/04/2009420025626Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/05/2009420025626Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/04/2009420025626Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/04/2009420025626Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q01072170-P1Open ↗
08/13/2026Q01072170-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01072170-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
06/04/2009420025626Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/04/2009420025626Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/04/2009420025626Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01072170-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01072170-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01072170-I1Open ↗