← Back
BuildNYC
Two family brick
158-31 77TH ROAD
QUEENS · BIN 4147854
💬 Discuss this project
2022Year Built
2.5Stories
B1Building Class
R3-2Zoning
2,493 sfGross Floor Area
2Units
Rent StabilizedFDNY Report ↗
Two family brick · 3,000 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 20 docs
AtticNew 2-family Dwelling19p · 2 filings · 20 docs
Floor 2New 2-family Dwelling22p · 3 filings · 20 docs
Floor 1New 2-family Dwelling21p · 4 filings · 20 docs
CellarNew 2-family Dwelling21p · 3 filings · 20 docs
Site & exteriorNew 2-family Dwelling6p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Commerce Realty Group1707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/12/2022$1.6M—HOLLYWOOD MEADOWS LLC → Private party$649/sf building
04/12/2021$995K—Private party → HOLLYWOOD MEADOWS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ameriland Brook908/03/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Daj EmrScaffold603/21/2026
Daj EmrGeneral Contractor603/21/2026
Daj Emrspecialty_contractor303/21/2026
Rock E Small Plumbing & HeatingPlumbing207/08/2026
C & A ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ameriland Brook1506708/03/2022
Building Lifecycle
10/04/2022
Signed off — New Building
PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O
Q00514360-I1
10/04/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/23/2022
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB# Q00514360
Q00514369-I1
08/12/2022
Signed off — Alteration
FILE MH WORTYPE IN CONJUNCTION WITH NB JOB#Q00514360
Q00514370-I1
08/12/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
58 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDaj Emr07/07/2022
DOB NOWCurb CutSigned-offDaj Emr05/03/2022
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating01/20/2022
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating11/12/2021
DOB NOWGeneral ConstructionPermit IssuedDaj Emr10/07/2021
DOB NOWConstruction FenceSigned-offDaj Emr07/15/2021
DOB NOWConstruction FenceSigned-offDaj Emr07/07/2021
BIS—ISSUEDDaj Emr08/19/2021
1 project · most recent 05/29/2022
General Wiring
FiledStatusContractorScope
05/29/2022CompleteC & A ElectricalGeneral Wiring
1 project · most recent 08/03/2022
FiledStatusContractorScope
08/03/2022Permit IssuedDaj Emr—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/04/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/02/2022Pass-Final CND-Occupancy InspectionPassView ↗
07/19/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/05/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
02/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 120
DateRequirementInspectorRole
08/12/2022Protection of exposed foundation insulationXIAOHONG ZHAOenergy_progress
08/12/2022Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
08/12/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/12/2022Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
08/12/2022Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
08/12/2022MasonryXIAOHONG ZHAOspecial
08/12/2022Subgrade InspectionsXIAOHONG ZHAOspecial
08/12/2022Footing and FoundationXIAOHONG ZHAOprogress
08/12/2022FinalXIAOHONG ZHAOprogress
08/12/2022Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
08/12/2022Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
08/12/2022Fenestration and door U-factor and product ratingsXIAOHONG ZHAOenergy_progress
08/12/2022Interior lighting powerXIAOHONG ZHAOenergy_progress
08/12/2022Exterior lighting powerXIAOHONG ZHAOenergy_progress
08/12/2022Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
08/12/2022Fenestration air leakageXIAOHONG ZHAOenergy_progress
08/12/2022Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
08/12/2022Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
08/12/2022Maintenance informationXIAOHONG ZHAOenergy_progress
08/12/2022Permanent certificateXIAOHONG ZHAOenergy_progress
08/12/2022Fenestration areasXIAOHONG ZHAOenergy_progress
08/12/2022Lighting controlsXIAOHONG ZHAOenergy_progress
08/12/2022Air barrier — testing XIAOHONG ZHAOenergy_progress
08/12/2022HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
08/12/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
Latest 25 of 120.
116 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account