← Back
Two stories - detached, small or mid-size
158-39 80 STREET
QUEENS · BIN 4292786
💬 Discuss this project
1965Year Built
1Stories
A1Building Class
R2Zoning
2,195 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,360 sf lot · 0.5 FAR built · Flood zone AE
Locations of Work
ArchitecturePlumbingOther
Floor 211p · 2 filings · 20 docs
Floor 111p · 2 filings · 20 docs
Cellar11p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2023$697K—Private party → Private party$318/sf building
10/31/2017$675K—Private party → Private party$308/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADRIAGA ENGINEERING P.C.509/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BERNARDO GAMBA503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DFE CONTRACTOR LLCGeneral Contractor507/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637409/26/2025
Building Lifecycle
All (56)Filed (5)Permit Issued (4)Inspection (4)Objection (16)Special Inspection (27)
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
09/26/2025
Filed — Alteration
PL APPLICATION FILED IN CONJUNCTION WITH DOB NOW APPLICATION Q00932597-I1
Q00933063-P1
08/01/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Admin
05/12/2025
Filed — Alteration CO
Proposed vertical extension on the 2nd floor, along with interior renovations.
Q00932597-P2
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
04/02/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Robert Truskosky
04/02/2025
Special inspection requirement — Masonry
Robert Truskosky
04/02/2025
Special inspection requirement — Mechanical Systems
Robert Truskosky
04/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Robert Truskosky
04/02/2025
Special inspection requirement — Structural Steel - Details
Robert Truskosky
04/02/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Robert Truskosky
04/02/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
04/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
04/02/2025
Special inspection requirement — Final
Robert Truskosky
04/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
04/02/2025
Special inspection requirement — Fenestration air leakage
Robert Truskosky
04/02/2025
Special inspection requirement — Insulation placement and R values
Robert Truskosky
04/02/2025
Special inspection requirement — Ventilation and air distribution system
Robert Truskosky
04/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Robert Truskosky
04/02/2025
Special inspection requirement — Interior lighting power
Robert Truskosky
04/02/2025
Special inspection requirement — Maintenance information
Robert Truskosky
04/02/2025
Special inspection requirement — Metering
Robert Truskosky
04/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
04/02/2025
Special inspection requirement — Fenestration areas
Robert Truskosky
04/02/2025
Special inspection requirement — Duct leakage testing, insulation and design
Robert Truskosky
04/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
04/02/2025
Special inspection requirement — Permanent certificate
Robert Truskosky
04/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
04/02/2025
Special inspection requirement — Air barrier - visual inspection
Robert Truskosky
04/02/2025
Special inspection requirement — Electric vehicle service equipment requirements
Robert Truskosky
12/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/25/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/04/2024
Permit issued — Plumbing
Q00933063-I1-PL
10/04/2024
Permit issued — Construction Fence
Q00924115-I1-FN
02/23/2024
Permit issued — General Construction
Q00932597-I1-GC-CX
02/12/2024
Objection resolved — Addressed
01/26/2024
Objection raised — Other
11/16/2023
Objection resolved — Addressed
11/01/2023
Objection resolved — Addressed
11/01/2023
Objection resolved — Addressed
10/26/2023
Permit issued — Construction Fence
Q00924115-I1-FN
09/25/2023
Objection raised — Scope
09/25/2023
Objection raised — Zoning
09/25/2023
Objection raised — Zoning
09/18/2023
Filed — Alteration
PL APPLICATION FILED IN CONJUNCTION WITH DOB NOW APPLICATION Q00932597-I1
Q00933063-I1
09/18/2023
Filed — Alteration CO
Proposed vertical extension on the 2nd floor, along with interior renovations.
Q00932597-I1
09/08/2023
Objection resolved — Addressed
09/08/2023
Objection resolved — Addressed
09/08/2023
Objection resolved — Addressed
09/06/2023
Objection raised — Scope
09/06/2023
Objection raised — Other
09/06/2023
Objection raised — Structural
08/29/2023
Filed — Alteration
PROPOSE TEMPORARY 8' HIGH CONSTRUCTION FENCE
Q00924115-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC10/04/2024
DOB NOWConstruction FencePermit IssuedDFE CONTRACTOR LLC10/04/2024
DOB NOWGeneral ConstructionPermit IssuedDFE CONTRACTOR LLC02/23/2024
DOB NOWConstruction FencePermit IssuedDFE CONTRACTOR LLC10/26/2023
1 project · most recent 05/12/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/12/2025Permit IssuedDFE CONTRACTOR LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Goodman GMS921004CNA 100,000 BTU · Furnace ×2
GSXC16-0361F 36,000 BTU · Furnace ×2
1 project · most recent 09/26/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/26/2025Permit IssuedVILLAGE P & H NY INCGas, Water/Sanitary
2 projects · most recent 06/07/2024
General Wiring
FiledStatusContractorScope
06/07/2024CompleteAAA'S ELECTL CONTG CORPGeneral Wiring
01/14/2019CompleteVENTURE HOME SOLAR LLC—
1 project · most recent 05/12/2025
Wood
FiledStatusContractorScope
05/12/2025Permit IssuedDFE CONTRACTOR LLCWood
1 project · most recent 08/29/2023
Fence
FiledStatusContractorScope
08/29/2023Permit IssuedDFE CONTRACTOR LLCFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/25/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
10/16/2025Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
04/02/2025Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
04/02/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Robert Truskoskyspecial
04/02/2025MasonryRobert Truskoskyspecial
04/02/2025Mechanical SystemsRobert Truskoskyspecial
04/02/2025Structural Stability – Alterations of existing buildingsRobert Truskoskyspecial
04/02/2025Structural Steel - DetailsRobert Truskoskyspecial
04/02/2025Wood – Prefabricated I-JoistsRobert Truskoskyspecial
04/02/2025Construction Utilizing CLT or SCL, Type IV—special
04/02/2025Energy Code Compliance InspectionsRobert Truskoskyprogress
04/02/2025FinalRobert Truskoskyprogress
04/02/2025Fire-Resistance Rated ConstructionRobert Truskoskyprogress
04/02/2025Fenestration air leakageRobert Truskoskyenergy_progress
04/02/2025Insulation placement and R valuesRobert Truskoskyenergy_progress
04/02/2025Ventilation and air distribution systemRobert Truskoskyenergy_progress
04/02/2025Fenestration and door U-factor and product ratingsRobert Truskoskyenergy_progress
04/02/2025Interior lighting powerRobert Truskoskyenergy_progress
04/02/2025Maintenance informationRobert Truskoskyenergy_progress
04/02/2025MeteringRobert Truskoskyenergy_progress
04/02/2025HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
04/02/2025Fenestration areasRobert Truskoskyenergy_progress
04/02/2025Duct leakage testing, insulation and designRobert Truskoskyenergy_progress
04/02/2025HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
04/02/2025Permanent certificateRobert Truskoskyenergy_progress
04/02/2025HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
Latest 25 of 27.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026Q00924115-I1Request digital key ↗
08/20/2026Q00932597-I1Request digital key ↗
08/20/2026Q00932597-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/16/2018440516666Open ↗
▸BISWORK PERMIT APPLICATION1
10/16/2018440516666Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram3
08/20/2026Q00932597-P1Open ↗
08/20/2026Q00932597-I1Open ↗
08/13/2026Q00932597-P2Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
10/16/2018440516666Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00932597-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q00932597-I1Open ↗
08/20/2026Q00932597-P1Open ↗
08/18/2026Q00933063-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q00932597-P2Open ↗
09/01/2026Q00932597-P2Open ↗
09/01/2026Q00932597-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/17/2026Q00933063-I1Open ↗
09/01/2026Q00932597-P2Open ↗
09/01/2026Q00932597-P2Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/16/2018440516666Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/16/2018440516666Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/16/2018440516666Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/20/2026Q00932597-P1Open ↗
08/20/2026Q00932597-I1Open ↗
08/13/2026Q00932597-P2Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/20/2026Q00932597-P1Open ↗
08/20/2026Q00932597-I1Open ↗
08/13/2026Q00932597-P2Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
10/16/2018440516666Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q00932597-I1Open ↗
08/20/2026Q00932597-P1Open ↗
08/13/2026Q00932597-P2Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/16/2018440516666Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/21/2019440516666Open ↗
10/16/2018440516666Open ↗
10/16/2018440516666Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/16/2018440516666Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/21/2019440516666Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/16/2018440516666Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/21/2019440516666Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
03/21/2019440516666Open ↗
03/21/2019440516666Open ↗
10/16/2018440516666Open ↗
Showing 3 of 4 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
10/16/2018440516666Open ↗
▸Approvals, Objections & Sign-offs2
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/21/2019440516666Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/21/2019440516666Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/21/2019440516666Open ↗
10/16/2018440516666Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
03/04/2019440516666Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/16/2018440516666Open ↗
▸Other Documents13
▸DOB NOWPlot Diagram3
08/20/2026Q00932597-P1Open ↗
08/20/2026Q00932597-I1Open ↗
08/13/2026Q00932597-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q00932597-P1Open ↗
08/20/2026Q00932597-I1Open ↗
08/13/2026Q00932597-P2Open ↗
▸DOB NOWSite Survey: Initial3
08/20/2026Q00932597-I1Open ↗
08/20/2026Q00932597-P1Open ↗
08/13/2026Q00932597-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/20/2026Q00932597-P1Open ↗
08/20/2026Q00932597-I1Open ↗
08/13/2026Q00932597-P2Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/16/2018440516666Open ↗