2 Open Violations 0 unresolved · 2 paperwork only▸
ECB11/21/2009WORK W.O A PERMIT. AT FRONT YARD EXISTING PORCH HAS BEEN FULLY DEMO INCLUDING POSTS FOR ROOF, TEMP POST HAVE BEEN INSTALLED & NEW CCA LEDGERINSTALLED. WORK APPROX 40% COMPLETE. STOP ALL WORK. REMEDY: OBTAIN A PNothing owed — awaiting certificate of correction
ECB11/21/2009FAIL TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. STAIRCASE TO MAIN ENTRANCE WITH 6 RISERS MISSING REQUIRED HANDRAILS. ALSO FRONT STEPS ROTTED& IN NEED OF REPAIR. REMEDY: MAINTAIN BLDGNothing owed — awaiting certificate of correction
Two family frame · 5,000 sf lot · 0.28 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.