Two family frame
158 NICHOLS AVENUE
BROOKLYN · BIN 3091876
💬 Discuss this project
1910Year Built
2.5Stories
B2Building Class
R5Zoning
1,426 sfGross Floor Area
2Units
6 Open Violations ▸FDNY Report ↗
Two family frame · 1,928 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
Architecture
Floor 28p · 2 filings · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar9p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B Y CONSTRUCTION CORP1703/22/2026
OWNER OF 158 NICHOLS AVE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/06/2023$576K—— → —$404/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIZA WORKS OF ARCHITECTURE PLLC608/23/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B Y CONSTRUCTION CORPGeneral Contractor603/21/2026
DISCENZA, MICHAELElectrical103/21/2026
MICHAEL DISCENZAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIZA WORKS OF ARCH PLLC6101608/23/2024
JIAN ENGINEERING PLLC7397204/10/2024
Building Lifecycle
All (81)Filed (6)Permit Issued (2)Signed Off (2)Violation (8)Objection (33)Special Inspection (30)
08/27/2024
Signed off — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE FAMILY HOUSE. INTERIOR PARTITIONS TO BE REARRANGED TO MEET THE DESIRED DESIGN. BATHROOMS AND KITCHEN TO BE RELOCATED. NEW MINI-SPLIT HEATING AND AIR CONDITIONING THROUGHOUT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00914981-I1
08/26/2024
Special inspection requirement — Mechanical Systems
Nicolas Zapata
08/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicolas Zapata
08/26/2024
Special inspection requirement — Air barrier - visual inspection
Nicolas Zapata
08/26/2024
Special inspection requirement — Fenestration air leakage
Nicolas Zapata
08/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Nicolas Zapata
08/26/2024
Special inspection requirement — Interior lighting power
Nicolas Zapata
08/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Nicolas Zapata
08/26/2024
Special inspection requirement — Insulation placement and R values
Nicolas Zapata
08/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
Nicolas Zapata
08/26/2024
Special inspection requirement — Fenestration areas
Nicolas Zapata
08/26/2024
Special inspection requirement — Duct leakage testing, insulation and design
Nicolas Zapata
08/26/2024
Special inspection requirement — Final
Nicolas Zapata
08/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Zapata
08/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Nicolas Zapata
08/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Zapata
08/23/2024
Filed — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE FAMILY HOUSE. INTERIOR PARTITIONS TO BE REARRANGED TO MEET THE DESIRED DESIGN. BATHROOMS AND KITCHEN TO BE RELOCATED. NEW MINI-SPLIT HEATING AND AIR CONDITIONING THROUGHOUT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00914981-P1
08/19/2024
Special inspection requirement — Interior lighting power
Nicolas Zapata
08/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Zapata
08/19/2024
Special inspection requirement — Mechanical Systems
Nicolas Zapata
08/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Zapata
08/19/2024
Special inspection requirement — Final
Nicolas Zapata
08/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
Nicolas Zapata
08/19/2024
Special inspection requirement — Fenestration areas
Nicolas Zapata
08/19/2024
Special inspection requirement — Fenestration air leakage
Nicolas Zapata
08/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
Nicolas Zapata
08/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
Nicolas Zapata
08/19/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Nicolas Zapata
08/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicolas Zapata
08/19/2024
Special inspection requirement — Insulation placement and R values
Nicolas Zapata
08/19/2024
Special inspection requirement — Duct leakage testing, insulation and design
Nicolas Zapata
08/19/2024
Special inspection requirement — Air barrier - visual inspection
Nicolas Zapata
08/15/2024
Signed off — Alteration CO
CONVERSION OF AN EXISTING SINGLE FAMILY HOUSE TO A TWO-FAMILY HOUSE. INTERIOR PARTITIONS TO BE REARRANGED TO MEET THE DESIRED DESIGN. BATHROOMS AND KITCHEN TO BE RELOCATED. NEW MINI-SPLIT HEATING AND AIR CONDITIONING THROUGHOUT.
B00939750-S1
08/01/2024
Objection raised — Other
07/26/2024
Objection resolved — Resolved
07/26/2024
Objection resolved — Resolved
07/26/2024
Objection resolved — Resolved
07/10/2024
Objection resolved — Addressed
04/18/2024
Objection raised — Fire_Protection
04/18/2024
Objection raised — Structural
04/18/2024
Objection raised — Scope
04/18/2024
Objection resolved — Addressed
04/18/2024
Objection raised — Scope
04/18/2024
Objection resolved — Addressed
04/18/2024
Objection raised — Other
04/18/2024
Objection raised — Zoning
04/11/2024
Objection raised — Other
04/11/2024
Objection resolved — Addressed
04/11/2024
Objection raised — Other
04/11/2024
Objection resolved — Addressed
04/11/2024
Objection raised — Other
04/11/2024
Objection resolved — Addressed
04/10/2024
Filed — Alteration CO
CONVERSION OF AN EXISTING SINGLE FAMILY HOUSE TO A TWO-FAMILY HOUSE. INTERIOR PARTITIONS TO BE REARRANGED TO MEET THE DESIRED DESIGN. BATHROOMS AND KITCHEN TO BE RELOCATED. NEW MINI-SPLIT HEATING AND AIR CONDITIONING THROUGHOUT.
B00939750-P1
04/10/2024
Filed — Alteration CO
CONVERSION OF AN EXISTING SINGLE FAMILY HOUSE TO A TWO-FAMILY HOUSE. INTERIOR PARTITIONS TO BE REARRANGED TO MEET THE DESIRED DESIGN. BATHROOMS AND KITCHEN TO BE RELOCATED. NEW MINI-SPLIT HEATING AND AIR CONDITIONING THROUGHOUT.
B00939750-P2
12/12/2023
Permit issued — General Construction
B00939750-I1-GC-CX
11/29/2023
Objection resolved — Addressed
11/16/2023
Objection raised — Energy
11/16/2023
Objection resolved — Addressed
10/27/2023
Objection resolved — Addressed
10/25/2023
Objection raised — Other
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedB Y CONSTRUCTION CORP12/12/2023
DOB NOWGeneral ConstructionSigned-offB Y CONSTRUCTION CORP08/23/2023
1 project · most recent 04/10/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/10/2024Permit IssuedB Y CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Fujitsu FUJITSU HALCYON AOU36RLXFZ1 36,000 BTU · Condensing Unit ×4
FUJITSU AOU24RLXFZH 22,000 BTU · Condensing Unit ×1
FUJITSU AOUG15LZAH1 14,500 BTU · Condensing Unit ×1
1 project · most recent 04/10/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/10/2024——Gas, Storm, Water/Sanitary
1 project · most recent 05/09/2024
General Wiring
FiledStatusContractorScope
05/09/2024CompleteRM ELECTRIC CO., INC.General Wiring
1 project · most recent 04/10/2024
Wood
FiledStatusContractorScope
04/10/2024Permit IssuedB Y CONSTRUCTION CORPWood
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
08/26/2024Mechanical SystemsNicolas Zapataspecial
08/26/2024HVAC-R and service water piping design and insulationNicolas Zapataenergy_progress
08/26/2024Air barrier - visual inspectionNicolas Zapataenergy_progress
08/26/2024Fenestration air leakageNicolas Zapataenergy_progress
08/26/2024Fenestration and door U-factor and product ratingsNicolas Zapataenergy_progress
08/26/2024Interior lighting powerNicolas Zapataenergy_progress
08/26/2024HVAC-R and service water heating equipmentNicolas Zapataenergy_progress
08/26/2024Insulation placement and R valuesNicolas Zapataenergy_progress
08/26/2024HVAC-R and service water heating system controlsNicolas Zapataenergy_progress
08/26/2024Fenestration areasNicolas Zapataenergy_progress
08/26/2024Duct leakage testing, insulation and designNicolas Zapataenergy_progress
08/26/2024FinalNicolas Zapataprogress
08/26/2024Energy Code Compliance InspectionsNicolas Zapataprogress
08/26/2024Fire-Resistance Rated ConstructionNicolas Zapataprogress
08/26/2024Fire-Resistant Penetrations and JointsNicolas Zapataspecial
08/19/2024Interior lighting powerNicolas Zapataenergy_progress
08/19/2024Fire-Resistant Penetrations and JointsNicolas Zapataspecial
08/19/2024Mechanical SystemsNicolas Zapataspecial
08/19/2024Energy Code Compliance InspectionsNicolas Zapataprogress
08/19/2024FinalNicolas Zapataprogress
08/19/2024Fire-Resistance Rated ConstructionNicolas Zapataprogress
08/19/2024Fenestration areasNicolas Zapataenergy_progress
08/19/2024Fenestration air leakageNicolas Zapataenergy_progress
08/19/2024HVAC-R and service water heating system controlsNicolas Zapataenergy_progress
08/19/2024HVAC-R and service water heating equipmentNicolas Zapataenergy_progress
Latest 25 of 52.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00914981-I1Request digital key ↗
08/27/2026B00914981-P1Request digital key ↗
08/26/2026B00939750-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00939750-I1Open ↗
09/01/2026B00939750-I1Open ↗
08/31/2026B00914981-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00939750-P2Open ↗
08/26/2026B00939750-P1Open ↗
08/26/2026B00939750-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00939750-I1Open ↗
09/01/2026B00939750-I1Open ↗
08/31/2026B00914981-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00939750-I1Open ↗
08/13/2026B00939750-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026B00939750-S1Open ↗
08/26/2026B00939750-P1Open ↗
08/26/2026B00939750-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/26/2026B00939750-P1Open ↗
08/26/2026B00939750-I1Open ↗