← Back
Walk-up cooperative
158 PROSPECT PARK WEST
BROOKLYN · BIN 3026225
💬 Discuss this project
1899Year Built
4Stories
C6Building Class
R7AZoning
5,028 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 158 P.P.W. HOUSING CORPORATION · 1,773 sf lot · 2.84 FAR built · Flood zone X
Locations of Work
Architecture
Floor 22p · 2 filings · 14 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
158 PPW HOUSING CORP203/22/2026
158 PROSPECT PARK WEST OWNERS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GESTURE INK ARCHITECTURE205/16/2024
MBTORRE ARCHITECTS AND PLANNERS106/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GNS HOME IMPROVMENT LLCGeneral Contractor603/21/2026
HT PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM DESIGN STUDIO LLC4413105/16/2024
MARTIN B TORRE ARHITECTUR3419106/27/2021
Building Lifecycle
All (30)Filed (3)Permit Issued (3)Signed Off (2)Violation (12)Inspection (2)Objection (2)Special Inspection (6)
05/05/2026
Violation issued (HPD, open)
A
06/10/2025
Violation issued (HPD, closed)
A
12/13/2024
Signed off — Alteration
B01043625-I1
11/12/2024
Signed off — Alteration
Interior alteration proposes modifications to the 2nd floor apartment including a newmaster bathroom, a new closet and modifcation of the existing master bedroom and study room. No change to use, egress or occupancy.)
B01043630-I1
11/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/12/2024
Permit issued — General Construction
B01043625-I1-GC
07/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/15/2024
Permit issued — Plumbing
B01043630-I1-PL
06/24/2024
Permit issued — General Construction
B01043625-I1-GC
05/16/2024
Filed — Alteration
B01043625-I1
05/16/2024
Filed — Alteration
Interior alteration proposes modifications to the 2nd floor apartment including a newmaster bathroom, a new closet and modifcation of the existing master bedroom and study room. No change to use, egress or occupancy.)
B01043630-I1
04/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
04/30/2024
Special inspection requirement — Final
MEL SARKOR-CLINTON
04/30/2024
Special inspection requirement — Energy Code Compliance Inspections
MEL SARKOR-CLINTON
04/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALLENDE MATOS
04/30/2024
Special inspection requirement — Interior lighting power
MEL SARKOR-CLINTON
04/30/2024
Special inspection requirement — Lighting controls
MEL SARKOR-CLINTON
11/20/2023
Violation issued (HPD, closed)
I
03/24/2023
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
I
06/28/2021
Objection raised — Other
06/28/2021
Objection resolved — Addressed
06/27/2021
Filed — Alteration
Install rooftop deck. No change of use, egress or occupancy.
B00534704-I1
04/12/2021
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
I
10/31/2019
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
03/25/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/1987
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGNS HOME IMPROVMENT LLC09/12/2024
DOB NOWPlumbingSigned-offHT PLUMBING & HEATING COR07/15/2024
DOB NOWGeneral ConstructionSigned-offGNS HOME IMPROVMENT LLC06/24/2024
BISBLISSUEDSTEPHEN BRAUN08/04/2000
1 project · most recent 09/16/2024
General Wiring
FiledStatusContractorScope
09/16/2024Permit IssuedCINTRON ELECL SVCS & LIGTGeneral Wiring
1 project · most recent 06/27/2021
Steel
FiledStatusContractorScope
06/27/2021——Steel
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/30/2024Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
04/30/2024FinalMEL SARKOR-CLINTONprogress
04/30/2024Energy Code Compliance InspectionsMEL SARKOR-CLINTONprogress
04/30/2024Fire-Resistance Rated ConstructionALLENDE MATOSprogress
04/30/2024Interior lighting powerMEL SARKOR-CLINTONenergy_progress
04/30/2024Lighting controlsMEL SARKOR-CLINTONenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026B01043630-I1Request digital key ↗
08/25/2026B01043625-I1Request digital key ↗
08/15/2026B00534704-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/15/2026B00534704-I1Open ↗
08/13/2026B01043630-I1Open ↗
08/13/2026B01043625-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026B01043625-I1Open ↗
08/26/2026B01043625-I1Open ↗
08/26/2026B01043625-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00534704-I1Open ↗
08/25/2026B01043630-I1Open ↗
08/13/2026B01043625-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B01043625-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026B01043630-I1Open ↗
08/15/2026B00534704-I1Open ↗
08/13/2026B01043625-I1Open ↗