← Back
Old law tenement
158 WEST 129 STREET
MANHATTAN · Harlem (North) · BIN 1057965
💬 Discuss this project
1923Year Built
5Stories
C4Building Class
R7-2Zoning
11,880 sfGross Floor Area
10Units
Rent Stabilized13 Open Violations ▸
Old law tenement · Owner of record: AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP. · 2,748 sf lot · 4.32 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof1p · 1 filing · 16 docs
Floor 51p · 1 filing · 16 docs
Floor 41p · 1 filing · 16 docs
Floor 31p · 1 filing · 16 docs
Floor 21p · 1 filing · 16 docs
Floor 16p · 3 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST HARLEM GROUP ASSISTANCE3807/08/2026
METRO CONTRACTING NY503/22/2026
AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP.203/22/2026
J&G GNRL CONTRACT INC103/21/2026
WHGA GARVEY HDFC403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC1212/19/2025
ASHRAF CORP108/22/2025
MSM ENGINEERING SERVICES, PLLC110/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HORIZON CONSTRUCTION INCGeneral Contractor507/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing507/08/2026
METRO CONTRACTING NY, INC.General Contractor203/21/2026
RICHARD NEUElectrical103/21/2026
ALPHA SCAFFOLDING INCGeneral Contractor107/08/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING49831004/29/2025
Building Lifecycle
All (141)Filed (14)Permit Issued (11)Signed Off (7)Violation (60)Inspection (9)Objection (10)Special Inspection (30)
06/16/2026
Violation issued (HPD, open)
A
06/16/2026
Violation issued (HPD, open)
B
06/16/2026
Violation issued (HPD, open)
B
06/16/2026
Violation issued (HPD, open)
B
06/16/2026
Violation issued (HPD, closed)
C
05/19/2026
Violation issued (HPD, closed)
C
05/19/2026
Violation issued (HPD, open)
B
05/05/2026
Violation issued (HPD, open)
A
05/05/2026
Violation issued (HPD, open)
B
05/05/2026
Violation issued (HPD, open)
B
05/05/2026
Violation issued (HPD, open)
A
05/01/2026
Signed off — Alteration
Replace and relocate plumbing fixtures at kitchen and bath per revised layout at apts. 1A and 1B. No change in use egress or occupancy.
M00829353-I1
04/01/2026
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047518-S1
03/26/2026
Signed off — Alteration
Renovated bathrooms and kitchens at apts. 1A and 1B for ADA compliance. No change to use egress or occupancy.
M00830734-I1
03/26/2026
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047518-S2
03/25/2026
Violation issued (HPD, open)
A
03/25/2026
Violation issued (HPD, open)
A
03/25/2026
Violation issued (HPD, open)
B
03/25/2026
Violation issued (HPD, open)
B
03/12/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/05/2026
Signed off — Alteration
Interior work at common space of building and roof. All work is as per plan. No change to use, egress, or occupancy under this filing.
M00826954-I1
01/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
12/19/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047518-P3
11/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/08/2025
Permit issued — Plumbing
M00829353-I1-PL
10/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01273164-I1
08/22/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01273164-I1
08/22/2025
Permit issued — Supported Scaffold
M01273164-I1-SF
08/13/2025
Violation issued (HPD, closed)
A
08/06/2025
Violation issued (HPD, closed)
B
08/06/2025
Violation issued (HPD, closed)
B
08/06/2025
Violation issued (HPD, closed)
B
08/06/2025
Violation issued (HPD, closed)
A
07/25/2025
Permit issued — General Construction
M00830734-I1-GC
07/24/2025
Permit issued — General Construction
M00826954-I1-GC
07/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/14/2025
Permit issued — Boiler Equipment
M01047518-S2-BE
05/08/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/29/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047518-S2
04/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/24/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047518-P2
04/24/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047518-P1
03/13/2025
Signed off — Alteration
M01134568-I1
02/20/2025
Violation issued (HPD, closed)
A
12/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
12/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
12/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
10/30/2024
Filed — Alteration
M01134568-I1
10/30/2024
Permit issued — Sidewalk Shed
M01134568-I1-SH
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.10/08/2025
DOB NOWSupported ScaffoldSigned-offALPHA SCAFFOLDING INC08/22/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/25/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/24/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.05/14/2025
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.10/30/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/06/2024
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.09/05/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/05/2024
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/22/2024
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/18/2024
BISPLISSUEDTHE PLUMBING COMPANY INC05/14/2012
BISBLISSUEDTHE PLUMBING COMPANY INC05/14/2012
BISEQISSUEDJ & G GNRL CONTRACT INC05/08/2012
BISEQISSUEDJ & G GNRL CONTRACT INC05/04/2012
BISOTISSUEDAP. TEK RESTORATION INC03/30/2012
BISEQISSUEDJ & G GNRL CONTRACT INC03/12/2012
BISEQISSUEDJ & G GNRL CONTRACT INC03/08/2012
BISOTISSUEDAP. TEK RESTORATION INC08/05/2010
2 projects · most recent 10/30/2024
General Wiring
FiledStatusContractorScope
10/30/2024CompleteRICHARD NEU—
10/23/2024CompleteHI-RITE ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/12/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2025Pass-Final Boiler Equipment InspectionPassView ↗
05/08/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
12/22/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
11/13/2025Tenant Protection Plan Compliance—special
04/29/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
12/16/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
12/16/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
12/16/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
12/05/2024Tenant Protection Plan Compliance—special
12/05/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
12/05/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
12/05/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
12/05/2024Heating SystemsALEXIS SCHLESSINGERMANspecial
06/17/2024Fenestration and door U-factor and product ratingsALEXIS SCHLESSINGERMANenergy_progress
06/17/2024Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
06/17/2024Exterior lighting powerALEXIS SCHLESSINGERMANenergy_progress
06/17/2024Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
06/17/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/17/2024FinalALEXIS SCHLESSINGERMANprogress
06/17/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/17/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
06/17/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
06/17/2024Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
06/17/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
06/17/2024Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
06/17/2024Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
06/17/2024Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
Latest 25 of 45.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/31/2026M00826954-P1Request digital key ↗
08/31/2026M00826954-I1Request digital key ↗
08/27/2026M00829353-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION8
05/15/2012121051173Open ↗
05/14/2012121051173Open ↗
05/14/2012121003449Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
05/07/2012121051173Open ↗
04/10/2012121008710Open ↗
03/14/2012121003449Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/31/2026M00826954-I1Open ↗
08/31/2026M00826954-P1Open ↗
08/27/2026M00830734-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026M00826954-I1Open ↗
09/02/2026M00826954-I1Open ↗
08/28/2026M01047518-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026M01047518-S1Open ↗
09/02/2026M00826954-I1Open ↗
08/28/2026M01047518-S2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/08/2014121003430Open ↗
09/04/2014121003449Open ↗
09/04/2014121003449Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/07/2012121051173Open ↗
04/10/2012121008710Open ↗
03/14/2012121003449Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
05/07/2012121051173Open ↗
04/10/2012121008710Open ↗
03/14/2012121003449Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
05/07/2012121051173Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/31/2026M00826954-I1Open ↗
08/31/2026M00826954-P1Open ↗
08/27/2026M00830734-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/15/2012121003449Open ↗
08/09/2010120431176Open ↗
03/28/2012121003449Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY1
05/07/2012121051173Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/27/2026M01047518-I1Open ↗
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/27/2026M01047518-I1Open ↗
08/27/2026M01047518-P3Open ↗
08/27/2026M01047518-P2Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
05/07/2012121051173Open ↗
04/10/2012121008710Open ↗
03/14/2012121003449Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/08/2012121003430Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/04/2014121003449Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/07/2012121051173Open ↗
04/10/2012121008710Open ↗
08/09/2010120431176Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET5
05/07/2012121051173Open ↗
04/10/2012121008710Open ↗
03/14/2012121003449Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M00826954-I1Open ↗
08/13/2026M00826954-P1Open ↗