Office with commercial, 7-19 stories
158 WEST 29 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1015134
💬 Discuss this project
1912Year Built
12Stories
O6Building Class
M1-8A/R11Zoning
58,764 sfGross Floor Area
13Units
LL97 Covered0 Open ViolationsFISP: SAFE
Office with commercial, 7-19 stories · 4,937 sf lot · 11.9 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 121p · 1 filing · 14 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 12p · 2 filings · 19 docs
Cellar3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY607/08/2026
BRO REALTY103/22/2026
DRUCKER ASSOCIATES103/22/2026
LOFTSPACE INC103/22/2026
OTB103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.101/20/2024
JACK GREEN ASSOCIATES211/14/2022
MATTHEW DIPROPERZIO, ARCHITECT105/04/2022
GURVINDER SINGH107/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.603/21/2026
NEW YORK ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEONARD KRITZElectrical303/21/2026
KINGS GROUP NY CORPGeneral Contractor307/08/2026
MOREAIR MECHANICAL SERVICGeneral Contractor203/21/2026
BRAUNSTEIN, HOWARDElectrical103/21/2026
M & C IMPACT IRON WORKElectrical103/21/2026
ABCO DRYWALL AND CEILINGSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES422211/14/2022
CROSSCHECK INSPECTION SER544105/04/2022
Building Lifecycle
All (78)Filed (5)Permit Issued (6)Signed Off (3)Facade (FISP) (13)Violation (42)Special Inspection (9)
01/26/2024
Permit issued — Boiler Equipment
M00989269-I1-BE
01/20/2024
Filed — Alteration
M00989269-I1
09/18/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
M00192304-I1
11/18/2022
Signed off — Alteration
FILING FOR INTERIOR REMOVALS AND NEW PARTITIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00719089-I1
11/18/2022
Signed off — Alteration
FILING FOR NEW/REPLACEMENT AC UNIT. NO CHANGE TO OCCUPANCY, USE OR EGRESS.
M00711029-I1
11/14/2022
Filed — Alteration
FILING FOR NEW/REPLACEMENT AC UNIT. NO CHANGE TO OCCUPANCY, USE OR EGRESS.
M00711029-P1
11/02/2022
Special inspection requirement — Mechanical Systems
JACK GREEN
11/02/2022
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
11/02/2022
Special inspection requirement — Final
JACK GREEN
11/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
11/02/2022
Special inspection requirement — Shutoff dampers
JACK GREEN
11/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
11/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
06/03/2022
Permit issued — General Construction
M00719089-I1-GC
05/05/2022
Permit issued — Mechanical Systems
M00711029-I1-MS
05/04/2022
Filed — Alteration
FILING FOR INTERIOR REMOVALS AND NEW PARTITIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00719089-I1
05/02/2022
Filed — Alteration
FILING FOR NEW/REPLACEMENT AC UNIT. NO CHANGE TO OCCUPANCY, USE OR EGRESS.
M00711029-I1
04/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
04/14/2022
Special inspection requirement — Final
MATTHEW DIPROPERZIO
01/11/2022
Cycle 9 facade report submitted
01/11/2022
Cycle 9 facade report signed — SAFE
12/08/2021
Cycle 9 facade inspection completed
09/22/2020
Permit issued — Sidewalk Shed
M00192304-I1-SH
09/24/2019
Permit issued — Sidewalk Shed
M00192304-I1-SH
07/17/2019
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
M00192304-I1
07/17/2019
Permit issued — Sidewalk Shed
M00192304-I1-SH
07/18/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/18/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/18/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/17/2017
Cycle 8 facade report submitted
02/15/2017
Cycle 8 facade report signed — SWARMP
02/02/2017
Cycle 8 facade inspection completed
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/17/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/17/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/17/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/25/2012
Cycle 7 facade report submitted
05/15/2012
Cycle 7 facade report signed — SAFE
04/16/2012
Cycle 7 facade inspection completed
04/11/2012
Violation issued (ECB, closed)
Local Law
02/16/2012
Cycle 6 facade report submitted
02/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/24/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/04/2010
Violation issued (ECB, closed)
Local Law
03/10/2010
Violation issued (ECB, closed)
Elevators
07/08/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/28/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/28/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/28/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/10/2008
Violation issued (ECB, closed)
Elevators
06/25/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/13/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/20/2007
Cycle 6 facade report submitted
02/15/2007
Cycle 6 facade report signed — UNSAFE
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedC C CONTROLLED COMBUSTION01/26/2024
DOB NOWGeneral ConstructionSigned-offABCO DRYWALL CEILINGS06/03/2022
DOB NOWMechanical SystemsSigned-offMOREAIR MECHANICAL SERVIC05/05/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/22/2020
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/24/2019
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP07/17/2019
BISOTISSUEDTITAN CONSTRUCTION SERVIC04/13/2021
BISOTISSUEDTITAN CONSTRUCTION SERVIC12/21/2020
BISSPISSUEDMETRO INCORPORATED09/13/2018
BISPLISSUEDMETRO INCORPORATED09/12/2018
BISOTISSUEDABCO DRYWALL AND CEILINGS07/13/2018
BISMHISSUEDABCO DRYWALL AND CEILINGS07/13/2018
BISMHISSUED5H & CO, INC01/27/2012
BISPLISSUEDBEST PLUMBING & HVAC INC08/16/2011
BISEQISSUEDOUTDOOR INSTALLATIONS LLC07/28/2011
BISOTISSUED5H & CO, INC07/08/2011
BISOTISSUEDLCS RESTORATION CORP03/22/2011
BISEQISSUEDOUTDOOR INSTALLATIONS LLC08/03/2010
BISOTISSUEDLCS RESTORATION CORP05/28/2010
BISEQISSUEDOUTDOOR INSTALLATIONS LLC04/28/2010
BISOTISSUEDON TRAC CONSTRUCTION ASSO12/12/2008
BISEQISSUEDOUTDOOR INSATLLATION LLC10/28/2008
BISEQISSUEDOUTDOOR INSATLLATION LLC02/26/2008
BISEQISSUEDOUTDOOR INSATLLATION LLC04/10/2007
BISEQISSUEDSPRING SCAFFOLDING01/31/2003
3 projects · most recent 02/23/2023
General Wiring
FiledStatusContractorScope
02/23/2023CompleteK & G ELECTRIC CO., INC.General Wiring
07/11/2019Permit IssuedRICHARD NEU—
10/19/2018CompleteP & Z ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
11/02/2022Mechanical SystemsJACK GREENspecial
11/02/2022Energy Code Compliance InspectionsJACK GREENprogress
11/02/2022FinalJACK GREENprogress
11/02/2022HVAC-R and service water heating equipmentJACK GREENenergy_progress
11/02/2022Shutoff dampersJACK GREENenergy_progress
11/02/2022HVAC-R and service water heating system controlsJACK GREENenergy_progress
11/02/2022HVAC-R and service water piping design and insulationJACK GREENenergy_progress
04/14/2022Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
04/14/2022FinalMATTHEW DIPROPERZIOprogress
▾Documents — 143 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
09/02/2026M00711029-I1Request digital key ↗
09/02/2026M00711029-P1Request digital key ↗
09/02/2026M00719089-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00192304-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION16
02/15/2022123556749Open ↗
01/24/2022123556749Open ↗
06/18/2019123556749Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION12
12/27/2019123126269Open ↗
08/05/2019123126269Open ↗
09/13/2018123476513Open ↗
Showing 3 of 12 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/14/2012120429928Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZoning Diagram (ZD1)1
11/30/2010110416390Open ↗
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
02/06/2019123476513Open ↗
10/17/2018123126269Open ↗
07/12/2018123476513Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026M00719089-I1Open ↗
08/25/2026M00711029-P1Open ↗
08/25/2026M00711029-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026M00711029-I1Open ↗
09/02/2026M00711029-P1Open ↗
08/28/2026M00989269-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/12/2018123476513Open ↗
07/11/2011120750197Open ↗
08/05/2010120429928Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/12/2018123476513Open ↗
07/12/2018123476513Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/11/2011120750197Open ↗
08/05/2010120429928Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M00719089-I1Open ↗
08/25/2026M00711029-P1Open ↗
▸Trade Schedules & Equipment8
▸BISEQUIPMENT USE PERMITS2
02/25/2019123476513Open ↗
05/22/2013120750197Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
03/19/2012120750197Open ↗
02/21/2012120750197Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
02/25/2019123476513Open ↗
05/22/2013120750197Open ↗
▸BISSCHEDULE B - PLUMBING1
07/11/2011120750197Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/12/2018123476513Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes1
10/17/2018123126269Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/17/2018123126269Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00192304-I1Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
12/04/2018123556749Open ↗
10/17/2018123126269Open ↗
07/12/2018123476513Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026M00711029-I1Open ↗
09/02/2026M00711029-P1Open ↗
08/28/2026M00989269-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
07/11/2011120750197Open ↗
05/18/2009120040829Open ↗
11/25/2008110416390Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/05/2010120429928Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/06/2019123476513Open ↗
10/17/2018123126269Open ↗
07/12/2018123476513Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/30/2021123126269Open ↗
02/21/2019123476513Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/30/2021123126269Open ↗
07/30/2021123126269Open ↗
▸BISTECHNICAL REPORT: ENERGY2
07/11/2011120750197Open ↗
07/11/2011120750197Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00711029-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/30/2021123126269Open ↗
07/30/2021123126269Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
02/06/2019123476513Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
07/30/2021123126269Open ↗
02/21/2019123476513Open ↗
01/11/2013120040829Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
07/11/2011120750197Open ↗
08/05/2010120429928Open ↗
05/18/2009120040829Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/05/2019123126269Open ↗
05/24/2010110416390Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
07/30/2021123126269Open ↗
07/30/2021123126269Open ↗
02/21/2019123476513Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET8
12/04/2018123556749Open ↗
10/17/2018123126269Open ↗
07/12/2018123476513Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
11/14/2018123126269Open ↗
10/17/2018123126269Open ↗
04/12/2013120750197Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
02/21/2019123476513Open ↗