6 Open Violations 3 unresolved · 3 paperwork only▸
ECB02/11/2020FAILURE TO COMPLY W/COMM'S ORDER CONTAINED IN SUMMONS/VIO#39002471Z ISSUED ON 4-30-19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28.201.1 & 1RCNY 102-01(D)(2). AN ACCEPTIPLE CERTIFICATE HAS NOT YET BEEN FILED$12 due
HPD11/24/2005SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT FRONT AND WEST ROOM CEILINGS, 2ND STORY APT.
HPD11/24/2005SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE WINDOW SILL FRONT ROOM WINDOW, 2ND STORY APT.
ECB04/30/2019AT TIME OF INSPECTION IN BOILER ROOM I OBSERVED NEW HOT WATER HEATER. NO PERMIT ON DOB RECORDS TO PERFORM THIS JOB. GAS METER VALVE WAS LOCKED BY UTILITY, OBTAIN ALL PERMITSNothing owed — awaiting certificate of correction
ECB04/27/2019WORK W/O A PERMIT. OBSERVED IN THE BASEMENT LEVEL,REAR BLDG. A KITCHEN W/A SINK & GAS STOVE. ALSO OBSERVED A 3PC BATHROOM W/TOILET,SINK & URINAL. NO PERMIT ON RECORD FOR NOTED WORK AT DOB'S. REMEDY: OBTAIN PERMNothing owed — awaiting certificate of correction
ECB04/27/2019OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERT OF OCCUPANCY OR BLDG DEPT RECORDS. OBSERVED BASEMENT OCCUPIED AS A CHURCH MEETING HALL W/FOLDING CHAIRS(APPROX 40)& TABLES. ALSO A KITCHEN W/COOKING POTS & CASESNothing owed — awaiting certificate of correction
Two family converted from one family · 2,500 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.