← Back
BuildNYC
Elevator cooperative
1580 AMSTERDAM AVENUE
MANHATTAN · BIN 1079852
💬 Discuss this project
1905Year Built
7Stories
D4Building Class
R7AZoning
53,984 sfGross Floor Area
21Units
LL97 CoveredRent Stabilized4 Active Violations 2 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: 1580 Amsterdam Ave HDFC · 10,000 sf lot · 5.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 3 docs
Floor 6Sixth floor apartment plumbing1 filing · 4 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Installation of heavy duty sidewalk shed4p · 1 filing · 2 docs
CellarOcean Bay Rad LLC1p · 1 filing · 11 docs
Basement1 filing · 3 docs
Site & exteriorOcean Bay Rad LLC25p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1580 Amsterdam Ave HDFC1203/22/2026
Ocean Bay Rad703/22/2026
1580 Amste303/21/2026
NY Landmark Gen Construction103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Architect Associates208/13/2025
SRL Associates201/21/2024
Enthink Engineers204/13/2023
Milev Architects102/09/2020
Com-EX Engineering of NY101/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Enkay Design Consulting203/21/2026
Architect403/21/2026
GC1 Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Modern Services SolutionsGeneral Contractor303/21/2026
MNK EnterprisesScaffold303/21/2026
Jimmy G ConstructionScaffold203/21/2026
Golam ConstructionGeneral Contractor107/08/2026
Syed-Naqvi AltafElectrical103/21/2026
Dorion Norton Electrical ContElectrical103/21/2026
Lens ElectricElectrical103/22/2026
Alson Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Arc-HI-Tech Associates6963208/13/2025
AA Building & Inspection1519201/21/2024
Frame Design and Construction7971201/21/2024
Elevated Engineering3692101/21/2019
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
06/26/2026
Elevator Category 1 inspection report filed
05/07/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
12/09/2025
Signed off — Alteration
APPLICATION FOR FACADE REPAIR WORK. REPAIR MINOR CRACKS ON THE EXP#4 (NORTHEAST), GRINDING & POINTING THROUGHOUT THE FACADE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01151883-I1
11/17/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
285 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGolam Construction01/03/2025
DOB NOWGeneral ConstructionSigned-offModern Services Solutions09/21/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises04/14/2023
DOB NOWSidewalk ShedPermit IssuedJimmy G Construction06/15/2021
BISPLISSUEDP.S.I. Mechanical01/14/2019
BISOTISSUEDJudson Realty01/11/2019
BISOTISSUEDNY Landmarks Gen Construction09/14/2018
BISPLISSUEDVSP Mechanical08/14/2018
BISOTISSUEDYZ Remodeling05/18/2018
BISPLISSUEDGanic Plumbing & Heating03/12/2014
BISOTISSUEDH4H Construction04/02/2013
BISPLISSUEDOrbit Plumbing & Heating08/23/2011
BISOTISSUEDPoler Contracting07/22/2011
BISEQISSUEDJ & G GNRL Contracting03/21/2011
BISPLISSUEDFireball Piping & Heating05/25/2006
BISMHISSUEDP & C Restoration04/14/2006
BISPLISSUEDRock E Small Plumbing & Heating02/07/2006
BISEQISSUEDAp. Tek Restoration09/07/2005
BISOTISSUEDAp. Tek Restoration09/07/2005
BISEQISSUEDAp. Tek Restoration09/06/2005
BISEQISSUEDHI Tech Bridging08/29/2005
BISPLISSUEDD.C. Plumbing04/10/2000
BISMHISSUEDZoolander Contracting03/21/2000
BISEQISSUEDGold Scaffolding07/15/1991
1 project · most recent 02/09/2020
Gas Water/Sanitary
FiledStatusContractorScope
02/09/2020——Gas, Water/Sanitary
7 projects · most recent 04/13/2023
General Wiring
FiledStatusContractorScope
04/13/2023Permit IssuedRichard Neu—
06/15/2021Permit IssuedRichard Neu—
04/15/2020Permit IssuedGeorge HolnessGeneral Wiring
08/08/2019CompleteAntonio Ceriello ElectricGeneral Wiring
11/12/2018Permit IssuedLens ElectricGeneral Wiring
07/21/2018CompleteJam Electrical—
07/21/2018CompleteJam Electrical—
1 project · most recent 06/15/2021
Sidewalk Shed
FiledStatusContractorScope
06/15/2021Permit IssuedJimmy G ConstructionSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
10/24/2025Structural Stability – Alterations of existing buildingsIGOR LISOVENKOspecial
10/24/2025Energy Code Compliance InspectionsIGOR LISOVENKOprogress
10/24/2025FinalIGOR LISOVENKOprogress
10/24/2025Tenant Protection Plan ComplianceIGOR LISOVENKOspecial
10/24/2025MasonryIGOR LISOVENKOspecial
08/12/2025FinalIGOR LISOVENKOprogress
08/12/2025MasonryIGOR LISOVENKOspecial
08/12/2025Structural Stability – Alterations of existing buildingsIGOR LISOVENKOspecial
08/12/2025Tenant Protection Plan ComplianceIGOR LISOVENKOspecial
08/12/2025Energy Code Compliance InspectionsIGOR LISOVENKOprogress
01/31/2024MasonrySURESH WARRENspecial
01/31/2024Tenant Protection Plan ComplianceYounes Abouyaalaspecial
01/31/2024FinalSean Lenahanprogress
01/17/2024Final—progress
01/17/2024Tenant Protection Plan ComplianceYounes Abouyaalaspecial
01/17/2024MasonrySURESH WARRENspecial
152 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account