← Back
Elevator cooperative
Ocean Plaza Condominium
1580 EAST 13 STREET · Midwood · BIN 3181718
💬 Discuss this project
1961Year Built
6Stories
D4Building Class
R4-1Zoning
80,600 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized15 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: 1580 EAST 13TH STREET CORP · 19,000 sf lot · 4.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 7 docs
Floor 62p · 1 filing · 4 docs
Floor 52p · 1 filing · 4 docs
Floor 42p · 1 filing · 4 docs
Floor 32p · 1 filing · 4 docs
Floor 22p · 1 filing · 4 docs
Floor 14p · 2 filings · 7 docs
Cellar11p · 4 filings · 20 docs
Site & exteriorUnder Construction19p · 4 filings · 12 docs
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DSJ MANAGEMENT1509/23/2026
TOPLINE NYC CONTRACTING707/08/2026
GARDEN REALTY503/21/2026
OCEAN PLAZA CONDO304/08/2026
1580 EAST 13TH STREET CORP303/22/2026
PHOENIX103/21/2026
PHOENIX BRIDGING INC DBA PHOENIX103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
YOUBER DESIGN203/21/2026
NEW YORK ENGINEERING203/21/2026
AE DESIGN SOLUTION203/21/2026
SANDEEP GUNNALA ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor607/08/2026
SASCO BUILDERS INCGeneral Contractor309/23/2026
ALLSTATE RENOVATION INCGeneral Contractor104/09/2026
AQEL SHEET METAL INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEO Y LEE ASSOCIATES2481109/16/2025
SANDEEP GUNNALA ENGINEERI8482103/25/2025
NEW YORK ENGINEERING ASSO851104/07/2023
NS ENGINEERS, P.C.1442106/24/2020
Building Lifecycle
All (94)Filed (9)Permit Issued (12)Signed Off (4)Violation (60)Inspection (1)Special Inspection (8)
09/22/2026
Permit issued — Sidewalk Shed
B01286827-I1-SH
04/06/2026
Permit issued — General Construction
B01286636-I1-GC-CX
01/06/2026
Signed off — Alteration
CELLAR RESTORATION AS PER DESIGN DRAWINGS INCLUDING BUT NOT LIMITED TO CEILING CRACK REPAIR, BEAM CRACK REPAIR, CEILING REPAIR, WALL CRACK REPAIR, BEAM REPAIR, SLAB REPAIR, WALL REPAIR, SLAB CRACK REPAIR, COLUMN CRACK REPAIR.
B01196875-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2025
Permit issued — Suspended Scaffold
B01289374-I1-SC
10/02/2025
Filed — Alteration
B01286827-I1
10/02/2025
Permit issued — Sidewalk Shed
B01286827-I1-SH
09/26/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
B01289374-I1
09/16/2025
Filed — Alteration
B01286636-I1
04/02/2025
Permit issued — Structural
B01196875-I1-ST
03/25/2025
Filed — Alteration
CELLAR RESTORATION AS PER DESIGN DRAWINGS INCLUDING BUT NOT LIMITED TO CEILING CRACK REPAIR, BEAM CRACK REPAIR, CEILING REPAIR, WALL CRACK REPAIR, BEAM REPAIR, SLAB REPAIR, WALL REPAIR, SLAB CRACK REPAIR, COLUMN CRACK REPAIR.
B01196875-I1
03/25/2025
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
03/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sandeep Gunnala
03/25/2025
Special inspection requirement — Concrete - Cast-In-Place
Sandeep Gunnala
03/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
03/18/2025
Special inspection requirement — Final
Sandeep Gunnala
11/09/2024
Violation issued (HPD, open)
B
11/09/2024
Violation issued (HPD, open)
B
11/09/2024
Violation issued (HPD, closed)
B
11/09/2024
Violation issued (HPD, closed)
C
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/05/2024
Violation issued (HPD, closed)
C
08/05/2024
Violation issued (HPD, closed)
B
08/05/2024
Violation issued (HPD, open)
B
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
B
08/05/2024
Violation issued (HPD, closed)
B
08/05/2024
Violation issued (HPD, closed)
B
08/05/2024
Violation issued (HPD, closed)
B
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, closed)
B
05/06/2024
Violation issued (HPD, closed)
B
05/06/2024
Violation issued (HPD, closed)
B
05/06/2024
Violation issued (HPD, closed)
B
05/06/2024
Violation issued (HPD, closed)
B
05/06/2024
Violation issued (HPD, closed)
B
05/06/2024
Violation issued (HPD, closed)
C
05/06/2024
Violation issued (HPD, closed)
C
05/06/2024
Violation issued (HPD, closed)
C
01/20/2024
Violation issued (HPD, closed)
C
01/20/2024
Violation issued (HPD, closed)
C
01/20/2024
Violation issued (HPD, closed)
C
08/25/2023
Signed off — Alteration
ABANDON BURIED OIL TANK IN YARD AND REPLACE WITH ABOVEGROUND OIL TANK IN CELLAR.
B00852770-I1
07/17/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2023
Permit issued — Boiler Equipment
B00852770-I1-BE
04/07/2023
Filed — Alteration
ABANDON BURIED OIL TANK IN YARD AND REPLACE WITH ABOVEGROUND OIL TANK IN CELLAR.
B00852770-I1
04/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
03/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
03/30/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
03/22/2023
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
A
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/08/2021
Violation issued (HPD, closed)
I
04/08/2021
Violation issued (HPD, closed)
A
02/01/2021
Signed off — Alteration
B00327913-I1
12/24/2020
Permit issued — Sidewalk Shed
B00439204-I1-SH
12/24/2020
Permit issued — Sidewalk Shed
B00383880-I1-SH
12/16/2020
Permit issued — Sidewalk Shed
B00383880-I1-SH
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSASCO BUILDERS INC09/22/2026
DOB NOWGeneral ConstructionPermit IssuedSASCO BUILDERS INC04/06/2026
DOB NOWSuspended ScaffoldPermit IssuedSASCO BUILDERS INC10/06/2025
DOB NOWSidewalk ShedPermit IssuedSASCO BUILDERS INC10/02/2025
DOB NOWStructuralSigned-offALLSTATE RENOVATION INC04/02/2025
DOB NOWBoiler EquipmentSigned-offSERVICE TECH MECH&PLBG IN04/19/2023
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING12/24/2020
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING12/24/2020
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING12/16/2020
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING08/12/2020
DOB NOWMechanical SystemsSigned-offAQEL SHEET METAL INC06/25/2020
DOB NOWBoiler EquipmentSigned-offSERVICE TECH MECH&PLBG IN05/27/2020
BISOTISSUEDSTANDARD CONSTRUCTION COR06/18/2021
BISOTISSUEDRIGGERS CONSTRUCTION CORP11/02/2020
BISEQISSUEDPHOENIX SUTTON STR INC11/21/2012
BISEQISSUEDB & S RESTORATION INC08/11/2010
BISOTISSUEDSODHI CONSTRUCTION CORP.08/06/2008
BISOTISSUEDSODHI CONSTRUCTION CORP.07/29/2008
BISEQISSUEDB & S RESTORATION INC.06/06/2008
BISOTISSUEDSODHI CONSTRUCTION CORP.05/06/2008
BISEQISSUEDB & S RESTORATION INC.03/28/2008
BISPLISSUEDJOSEPH FERRIGNO P&H CO12/04/2003
BISFSISSUEDSTAR INDUSTRIAL SERVICE CO INC12/04/2003
4 projects · most recent 02/11/2026
General Wiring Boiler Controls
FiledStatusContractorScope
02/11/2026CompleteAMSTERDAM ELECTRIC CORPGeneral Wiring
10/03/2025Permit IssuedRICHARD NEU—
01/04/2023CompleteLIVE WIRE ELECTRICAL, INCBoiler Controls
08/12/2020Permit IssuedRICHARD NEU—
1 project · most recent 09/26/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/26/2025Permit IssuedSASCO BUILDERS INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/17/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/25/2025Post-installed AnchorsSandeep Gunnalaspecial
03/25/2025Structural Stability – Alterations of existing buildingsSandeep Gunnalaspecial
03/25/2025Concrete - Cast-In-PlaceSandeep Gunnalaspecial
03/19/2025Tenant Protection Plan ComplianceSandeep Gunnalaspecial
03/18/2025FinalSandeep Gunnalaprogress
04/03/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
03/30/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/30/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
▾Documents — 102 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch5
08/27/2026B00852770-I1Request digital key ↗
08/22/2026B01196875-I1Request digital key ↗
08/20/2026B01286636-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00383880-I1Request digital key ↗
09/02/2026B00439204-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00327913-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00350609-I1Request digital key ↗
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION10
06/21/2021340765817Open ↗
11/02/2020340765817Open ↗
11/26/2012320573143Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
10/19/2020340765817Open ↗
11/26/2012320573143Open ↗
08/11/2010320197620Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications34
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
07/15/2013320573143Open ↗
07/15/2013320573143Open ↗
11/26/2012320573143Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/02/2026B00383880-I1Open ↗
09/02/2026B00439204-I1Open ↗
08/20/2026B01286636-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B00852770-I1Open ↗
08/29/2026B01196875-I1Open ↗
08/29/2026B01196875-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
11/26/2012320573143Open ↗
08/11/2010320197620Open ↗
04/25/2008310130818Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
11/26/2012320573143Open ↗
08/11/2010320197620Open ↗
04/25/2008310130818Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/19/2020340765817Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/19/2020340765817Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/19/2020340765817Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026B01196875-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan4
08/13/2026B00383880-I1Open ↗
08/13/2026B00327913-I1Open ↗
08/13/2026B00350609-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
10/19/2020340765817Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
08/11/2010320197620Open ↗
04/25/2008310130818Open ↗
03/27/2008310124264Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026B01286636-I1Open ↗
08/13/2026B01196875-I1Open ↗
08/13/2026B00852770-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00350609-I1Open ↗
08/13/2026B00327913-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/03/2010320196453Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/19/2020340765817Open ↗
▸Energy Compliance4
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/16/2022340765817Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/19/2020340765817Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/19/2020340765817Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00327913-I1Open ↗
▸Inspections & Test Reports2
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
06/16/2022340765817Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/19/2020340765817Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS4
08/11/2010320197620Open ↗
08/03/2010320196453Open ↗
04/25/2008310130818Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
11/14/2008310130818Open ↗
11/07/2008310130818Open ↗
10/21/2008310130818Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
06/21/2021340765817Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
10/19/2020340765817Open ↗
08/03/2010320196453Open ↗
11/07/2008310130818Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/23/2022340765817Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET5
11/26/2012320573143Open ↗
08/11/2010320197620Open ↗
08/03/2010320196453Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/19/2020340765817Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01289374-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01289374-I1Open ↗