← Back
Library
1570 ROCKAWAY PARKWAY
BROOKLYN · Canarsie · BIN 3230120
💬 Discuss this project
1963Year Built
1Stories
P8Building Class
R4-1Zoning
8,250 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Library · 12,000 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 20 docs
Floor 2Under Construction143p · 1 filing · 20 docs
Floor 1Under Construction143p · 1 filing · 20 docs
CellarUnder Construction142p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1403/21/2026
EXPEDITER303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHAWMUT WOODWORKING & SUPPLYGeneral Contractor407/28/2026
BREEZE NATIONAL INCGeneral Contractor404/09/2026
KING HOIST & SCAFFOLDINGGeneral Contractor209/09/2026
M&T PLBG AND HTG CO., INCPlumbing107/25/2026
RUTTURA & SONS CONSTRUCTIGeneral Contractor107/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection107/08/2026
MACCARONE PLUMBING INCPlumbing109/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842711/24/2025
Building Lifecycle
All (120)Filed (13)Permit Issued (14)Signed Off (1)Violation (5)Inspection (5)Objection (74)Special Inspection (8)
09/08/2026
Permit issued — Construction Fence
B01283678-I1-FN
09/01/2026
Permit issued — Plumbing
B01098556-S3-PL
08/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/27/2026
Permit issued — Protection and Mechanical Methods
B01432196-I1-PMM
07/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. TEMPORARY PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01432196-I1
07/24/2026
Permit issued — Plumbing
B01098556-S6-PL
06/26/2026
Violation issued (ECB, closed)
Construction
06/26/2026
Violation issued (ECB, closed)
Construction
06/26/2026
Violation issued (ECB, closed)
Construction
06/26/2026
Violation issued (ECB, closed)
Construction
06/26/2026
Violation issued (ECB, open)
Construction
05/14/2026
Permit issued — Protection and Mechanical Methods
B01399375-I1-PMM
05/13/2026
Filed — Alteration
Use of telehandler for site servicing during building construction. This application is filed in conjunction with NB B01098556
B01399375-I1
04/23/2026
Permit issued — Earth Work
B01098556-S2-EA
04/22/2026
Permit issued — Foundation
B01098556-S1-GC-CX
04/09/2026
Objection resolved — Addressed
03/04/2026
Objection resolved — Addressed
02/03/2026
Permit issued — General Construction
B01098556-I1-GC
02/02/2026
Permit issued — Sprinklers
B01098556-S7-EW-SP
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
12/30/2025
Signed off — Full Demolition
Full demolition of a 1 story building
B01242098-I1
12/18/2025
Special inspection requirement — Demolition
CONNIE PISANI
12/18/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
CONNIE PISANI
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
11/24/2025
Filed — Full Demolition
Full demolition of a 1 story building
B01242098-P1
11/20/2025
Objection resolved — Addressed
11/20/2025
Objection resolved — Addressed
11/14/2025
Permit issued — Full Demolition
B01242098-I1-FD
11/10/2025
Permit issued — Full Demolition
B01242098-I1-FD
11/07/2025
Permit issued — Full Demolition
B01242098-I1-FD
10/28/2025
Objection resolved — Addressed
09/24/2025
Objection resolved — Addressed
09/16/2025
Permit issued — General Construction
B01242117-I1-GC
09/16/2025
Objection resolved — Addressed
09/08/2025
Filed — Alteration
B01283678-I1
09/08/2025
Permit issued — Construction Fence
B01283678-I1-FN
08/18/2025
Objection raised — Other
07/31/2025
Filed — Full Demolition
Full demolition of a 1 story building
B01242098-I1
07/21/2025
Objection resolved — Addressed
07/11/2025
Filed — Alteration
Interior Demolition of 1 story public library building
B01242117-I1
06/19/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
04/17/2025
Objection resolved — Addressed
04/17/2025
Objection resolved — Addressed
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedKING HOIST & SCAFFOLDING09/08/2026
DOB NOWPlumbingPermit IssuedMACCARONE PLUMBING INC09/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSHAWMUT WOODWORKING & SUPPLY07/27/2026
DOB NOWPlumbingPermit IssuedM&T PLBG AND HTG CO., INC07/24/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedRUTTURA & SONS CONSTRUCTI05/14/2026
DOB NOWEarth WorkPermit IssuedSHAWMUT WOODWORKING & SUPPLY04/23/2026
DOB NOWFoundationPermit IssuedSHAWMUT WOODWORKING & SUPPLY04/22/2026
DOB NOWGeneral ConstructionPermit IssuedSHAWMUT WOODWORKING & SUPPLY02/03/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP02/02/2026
DOB NOWFull DemolitionSigned-offBREEZE NATIONAL INC11/14/2025
DOB NOWFull DemolitionSigned-offBREEZE NATIONAL INC11/10/2025
DOB NOWFull DemolitionSigned-offBREEZE NATIONAL INC11/07/2025
DOB NOWGeneral ConstructionSigned-offBREEZE NATIONAL INC09/16/2025
DOB NOWConstruction FencePermit IssuedKING HOIST & SCAFFOLDING09/08/2025
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR12/29/2016
1 project · most recent 02/21/2025
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/21/2025Permit IssuedSHAWMUT WOODWORKING & SUPHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Daikin Daikin - FXMQ48PBVJU 1,375 CFM · Vrf Indoor ×3
Daikin - FXAQ24PVJU 635 CFM · Vrf Indoor ×2
Daikin - FXMQ15PBVJU 560 CFM · Vrf Indoor ×2
Daikin - FXMQ18PBVJU 635 CFM · Vrf Indoor ×2
Daikin - FXMQ30PBVJU 1,090 CFM · Vrf Indoor ×2
Daikin - FXMQ36PBVJU 1,135 CFM · Vrf Indoor ×2
Daikin - FXSQ12TAVJU 335 CFM · Vrf Indoor ×2
RXYQ96AATJA 108,000 BTU · Vrf Outdoor ×2
Daikin - FXSQ07TAVJU 280 CFM · Vrf Indoor ×1
Daikin - FXSQ09TAVJU 315 CFM · Vrf Indoor ×1
REYQ144AATJA 162,000 BTU · Vrf Outdoor ×1
REYQ168AATJA 189,000 BTU · Vrf Outdoor ×1
Heating
Stelpro Pulsair ARWF1008T 1 kW · Electric Heater ×4
Pulsair - ARWF1008T 1 kW · Electric Heater ×1
Pulsair- ARWF1008T 1 kW · Electric Heater ×1
Neptronic Neptronic - DF FI00H 25,597 BTU · Doas ×2
Ventilation
Daikin Daikin FXMQ96MFVJU 1,195 CFM · Vrf Indoor ×2
Greenheck Greenheck - USF-4-VG 300 CFM · Exhaust Fan ×1
Greenheck USF-10-VG 750 CFM · Exhaust Fan ×1
1 project · most recent 02/21/2025
Storm Water/Sanitary
FiledStatusContractorScope
02/21/2025Permit IssuedBANCKER PLUMBING CORPStorm, Water/Sanitary
1 project · most recent 09/16/2026
General Wiring
FiledStatusContractorScope
09/16/2026Permit IssuedBIGMAN BROS., INC.General Wiring
1 project · most recent 02/21/2025
Wood
FiledStatusContractorScope
02/21/2025Permit IssuedBANCKER PLUMBING CORPWood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/12/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/31/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
12/18/2025DemolitionCONNIE PISANIspecial
12/18/2025Structural Stability – Alterations of existing BuildingsCONNIE PISANIspecial
11/15/2024Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
11/15/2024HVAC-R and service water heating equipmentCONNIE PISANIenergy_progress
11/15/2024HVAC-R and service water piping design and insulationCONNIE PISANIenergy_progress
11/15/2024HVAC-R and service water heating system controlsCONNIE PISANIenergy_progress
11/15/2024Sprinkler SystemsCONNIE PISANIspecial
11/15/2024Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Canarsie LibraryEducationGround
Project B01399375 Alteration · Permit Entire · 05/13/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/22/2026B01098556-S3Request digital key ↗
08/22/2026B01098556-S1Request digital key ↗
08/22/2026B01098556-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/28/2016340458882Open ↗
▸BISWORK PERMIT APPLICATION1
12/28/2016340458882Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01098556-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01098556-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01098556-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/22/2026B01098556-S3Open ↗
08/22/2026B01098556-I1Open ↗
08/22/2026B01098556-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01242098-P1Open ↗
09/01/2026B01242098-P1Open ↗
08/31/2026B01242098-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/28/2016340458882Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/28/2016340458882Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/28/2016340458882Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/14/2017340458882Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B01098556-S6Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B01098556-I1Open ↗
08/13/2026B01098556-S1Open ↗
▸BISSCHEDULE B - PLUMBING1
12/28/2016340458882Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01242098-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01242098-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01242098-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01242098-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B01098556-I1Open ↗
08/13/2026B01098556-S1Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026B01098556-I1Open ↗
08/13/2026B01098556-S1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01242117-I1Open ↗
08/13/2026B01242098-P1Open ↗
08/13/2026B01242098-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/28/2016340458882Open ↗
▸DOB NOWRodent Control1
08/13/2026B01242098-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/28/2016340458882Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/14/2017340458882Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/14/2017340458882Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/28/2016340458882Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01098556-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01098556-S1Open ↗
▸Approvals, Objections & Sign-offs25
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/20/2026B01283678-I1Open ↗
08/17/2026B01399375-I1Open ↗
08/16/2026B01432196-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
08/17/2026B01399375-I1Open ↗
08/13/2026B01098556-S4Open ↗
08/13/2026B01098556-I1Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/14/2017340458882Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/14/2017340458882Open ↗
12/28/2016340458882Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/28/2016340458882Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification2
08/13/2026B01242098-I1Open ↗
08/13/2026B01242098-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01098556-S1Open ↗
08/13/2026B01098556-I1Open ↗
▸DOB NOWStructure Photographs2
08/13/2026B01242098-P1Open ↗
08/13/2026B01242098-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B01098556-I1Open ↗
08/13/2026B01098556-S1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01242098-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/22/2026B01098556-S2Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01242098-I1Open ↗