← Back
Walk-up apt, over six families with stores
1580 YORK AVENUE
MANHATTAN · Upper East Side-Yorkville · BIN 1051179
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R10Zoning
7,700 sfGross Floor Area
10Units
Rent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: YORKVILLE REALTY LLC · 1,869 sf lot · 4.12 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar10p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KENNY607/08/2026
YORKVILLE REALTY LLC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.302/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CALRAY GAS HEAT CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851202/09/2023
Building Lifecycle
All (40)Filed (3)Permit Issued (2)Signed Off (2)Violation (27)Inspection (2)Special Inspection (4)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2025
Violation issued (HPD, closed)
A
04/02/2024
Violation issued (HPD, closed)
A
03/16/2023
Violation issued (HPD, closed)
A
03/14/2023
Signed off — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT GAS BOILER
M00542913-I1
03/14/2023
Signed off — Alteration
INSTALL GAS BOILER
M00542891-I1
03/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/09/2023
Filed — Alteration
INSTALL GAS BOILER
M00542891-P1
01/30/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/30/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
01/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
01/30/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
01/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/25/2023
Violation issued (HPD, closed)
B
02/16/2022
Violation issued (HPD, closed)
A
08/11/2021
Permit issued — Boiler Equipment
M00542891-I1-BE
08/11/2021
Permit issued — Plumbing
M00542913-I1-PL
07/28/2021
Filed — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT GAS BOILER
M00542913-I1
07/28/2021
Filed — Alteration
INSTALL GAS BOILER
M00542891-I1
04/15/2021
Violation issued (HPD, open)
C
04/15/2021
Violation issued (HPD, open)
A
04/15/2021
Violation issued (HPD, closed)
C
04/02/2021
Violation issued (HPD, closed)
A
03/10/2021
Violation issued (HPD, closed)
C
03/10/2021
Violation issued (HPD, closed)
C
03/10/2021
Violation issued (HPD, closed)
C
03/10/2021
Violation issued (HPD, closed)
C
03/10/2021
Violation issued (HPD, open)
C
01/15/2020
Violation issued (HPD, closed)
C
01/15/2020
Violation issued (HPD, closed)
C
01/15/2020
Violation issued (HPD, closed)
C
01/15/2020
Violation issued (HPD, closed)
C
10/27/2016
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
03/28/2008
Violation issued (ECB, closed)
Plumbing
03/24/2008
Violation issued (ECB, open)
Construction
02/27/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCALRAY GAS HEAT CORP08/11/2021
DOB NOWPlumbingSigned-offCALRAY GAS HEAT CORP08/11/2021
BISEQISSUEDHI-TECH BRIDGING INC07/05/2006
BISFPISSUEDN.Y. BUSINESS FIRE SYSTEM INC.10/16/2001
BISOTISSUEDJ.N.L. CONSTRUCTION INC.09/28/2001
BISFPISSUEDALLLIED FIRE CONTROL05/07/1996
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
01/30/2023Heating SystemsLOUIS ARENAspecial
01/30/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/30/2023Maintenance informationLOUIS ARENAenergy_progress
01/30/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/03/2026M00542913-I1Request digital key ↗
08/31/2026M00542891-I1Request digital key ↗
08/31/2026M00542891-P1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026M00542891-P1Open ↗
08/29/2026M00542891-P1Open ↗
08/29/2026M00542891-P1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026M00542891-P1Open ↗
08/31/2026M00542891-I1Open ↗
08/13/2026M00542913-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026M00542891-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026M00542891-I1Open ↗
08/31/2026M00542891-P1Open ↗
08/13/2026M00542913-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00542891-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00542891-I1Open ↗