← Back
Two family brick
1581 COLDEN AVENUE
BRONX · Morris Park · BIN 2087121
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R4Zoning
1,572 sfGross Floor Area
2Units
2 Open Violations ▸
Two family brick · 2,500 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 5 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2016$570K—— → —$363/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAYM S. GROSS, ARCHITECT410/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAPE PLUMBING INCPlumbing407/08/2026
LATICE ROBINSONElectrical103/21/2026
C PLUS DESIGN GROUP INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965210/11/2023
Building Lifecycle
All (19)Filed (4)Permit Issued (2)Signed Off (2)Violation (4)Inspection (4)Special Inspection (3)
01/09/2025
Violation issued (ECB, closed)
Construction
01/09/2025
Violation issued (ECB, closed)
Unknown
12/13/2023
Signed off — Alteration
Plumbing work at BASEMENT level associated with the interior renovation under job #X08028737: Removal of existing gas range, kitchen sink and tub. Relocate existing slop sink, dryer and washer.
X08035311-I1
12/13/2023
Signed off — Alteration
Interior work of existing cellar: removal of partitions, alter existing 3-piece bathroom and removal of existing kitchen. No change in use, egress or occupancy under this application.
X08028737-I1
10/16/2023
Filed — Alteration
Plumbing work at BASEMENT level associated with the interior renovation under job #X08028737: Removal of existing gas range, kitchen sink and tub. Relocate existing slop sink, dryer and washer.
X08035311-P2
10/11/2023
Filed — Alteration
Plumbing work at BASEMENT level associated with the interior renovation under job #X08028737: Removal of existing gas range, kitchen sink and tub. Relocate existing slop sink, dryer and washer.
X08035311-P1
10/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
09/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/13/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/05/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/30/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2023
Permit issued — Plumbing
X08035311-I1-PL
01/23/2023
Permit issued — General Construction
X08028737-I1-GC
11/12/2022
Filed — Alteration
Plumbing work at BASEMENT level associated with the interior renovation under job #X08028737: Removal of existing gas range, kitchen sink and tub. Relocate existing slop sink, dryer and washer.
X08035311-I1
11/05/2022
Filed — Alteration
Interior work of existing cellar: removal of partitions, alter existing 3-piece bathroom and removal of existing kitchen. No change in use, egress or occupancy under this application.
X08028737-I1
10/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
10/26/2022
Special inspection requirement — Final
HAYM GROSS
09/12/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/12/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCAPE PLUMBING INC06/06/2023
DOB NOWGeneral ConstructionSigned-offC PLUS DESIGN GROUP INC01/23/2023
BISOTISSUEDSUNRUN INSTALLATION SVC09/19/2022
2 projects · most recent 01/21/2025
General Wiring
FiledStatusContractorScope
01/21/2025Permit IssuedELECSERV INCGeneral Wiring
09/20/2022CompleteSUNRUN SOLAR ELECTL CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/05/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/04/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
10/27/2022Fire-Resistant Penetrations and JointsSYED RIZVIspecial
10/26/2022FinalHAYM GROSSprogress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026X08028737-I1Request digital key ↗
08/23/2026X08035311-P1Request digital key ↗
08/23/2026X08035311-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/16/2022240336490Open ↗
▸BISWORK PERMIT APPLICATION1
09/19/2022240336490Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026X08028737-I1Open ↗
08/23/2026X08035311-I1Open ↗
08/23/2026X08035311-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026X08028737-I1Open ↗
08/24/2026X08035311-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/16/2022240336490Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/16/2022240336490Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/16/2022240336490Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026X08028737-I1Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
09/19/2022240336490Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026X08028737-I1Open ↗
08/23/2026X08035311-I1Open ↗
08/23/2026X08035311-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/16/2022240336490Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/11/2024240336490Open ↗
09/16/2022240336490Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/11/2024240336490Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
03/14/2024240336490Open ↗
▸BISNYCECC ANALYSIS1
09/16/2022240336490Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/16/2022240336490Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/16/2022240336490Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/11/2024240336490Open ↗
09/16/2022240336490Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/14/2024240336490Open ↗
03/14/2024240336490Open ↗
09/16/2022240336490Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/14/2024240336490Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/11/2024240336490Open ↗
09/16/2022240336490Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
09/16/2022240336490Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/16/2022240336490Open ↗