Five to six families
1582 DEKALB AVENUE
BROOKLYN · BIN 3073912
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6Zoning
5,100 sfGross Floor Area
6Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Five to six families · Owner of record: 1582 Dekalb · 2,500 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 1 filing · 20 docs
Floor 3Unit 3A, Unit 3BUnder Construction43p · 1 filing · 20 docs
Floor 2Unit 2A, Unit 2BUnder Construction43p · 1 filing · 20 docs
Floor 1Unit 1RUnder Construction44p · 1 filing · 20 docs
CellarUnder Construction43p · 1 filing · 20 docs
Sub-BasementRemedial soil grouting1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Net Zero Property Managment2209/13/2026
Trifecta Equities303/22/2026
1582 Dekalb103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/03/2022$1.3M—GOOD START MANAGEMENT LLC → 1582 DEKALB LLC$255/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Hany Rizkalla Architect1707/28/2026
Mueser Rutledge Consulting Engineering105/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xpdite Group LLC (104)1503/21/2026
Xpdite Group LLC 104503/21/2026
Xpdite Group LLC 105503/21/2026
Xpdite Group 103103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pragmatic DevelopersGeneral Contractor407/08/2026
Owners GC NYGeneral Contractor307/08/2026
Triple Crown ConstructionGeneral Contractor107/08/2026
Pipe Solutions AdvisPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Citiscape Consulting7621507/28/2026
Building Lifecycle
08/31/2026
Failure to provide unobstructed exit passageway. At time of inspection, observed at exposure #3 (backyard), installation of a deck railing and…
ECB violation · open
08/27/2026
Closed: Seal all accessible openings/door to safeguard the property
DOB violation · closed on the city's record
08/27/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/25/2026
Closed: VIO23-50183
DOB violation · closed on the city's record
08/14/2026
Closed: Ftm.bldg in safe condition-bldg vacant under a full gutrenovation cellar slab cracked@the EXP3/4 corner @ least apprx 12LFW/the crack emanating up…
DOB violation · closed on the city's record
258 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offOwners GC NY05/18/2026
DOB NOWGeneral ConstructionPermit IssuedOwners GC NY03/13/2026
DOB NOWPlumbingSigned-offPipe Solutions Advis12/11/2025
DOB NOWGeneral ConstructionPermit IssuedOwners GC NY10/27/2025
DOB NOWGeneral ConstructionPermit IssuedTriple Crown Construction07/11/2025
DOB NOWEarth WorkSigned-offPragmatic Developers06/27/2024
DOB NOWGeneral ConstructionPermit IssuedPragmatic Developers04/05/2023
1 project · most recent 07/28/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
07/28/2026Signed-offOwners GC NYHeating and Air Conditioning Systems
1 project · most recent 07/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/28/2026Signed-offPipe Solutions AdvisGas, Storm, Water/Sanitary
3 projects · most recent 06/10/2026
General Wiring Boiler Controls
FiledStatusContractorScope
06/10/2026CompleteAccurate ElectricalGeneral Wiring
05/26/2026CompleteAccurate ElectricalBoiler Controls
05/26/2026CompleteAccurate Electrical—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/27/2026Fail-Final CND-Occupancy InspectionFailView ↗
03/20/2026Certified Storm Drainage-ST-Piping-Water TestCertifiedView ↗
03/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 120
DateRequirementInspectorRole
07/28/2026Fire-Resistance Rated ConstructionJoe Liebermanprogress
07/28/2026Fenestration areasJoe Liebermanenergy_progress
07/28/2026Lighting in dwelling unitsJoe Liebermanenergy_progress
07/28/2026Fenestration air leakageJoe Liebermanenergy_progress
07/28/2026Fenestration and door U-factor and product ratingsJoe Liebermanenergy_progress
07/28/2026Concrete - Cast-In-PlaceJoe Liebermanspecial
07/28/2026Exterior Insulation and Finish Systems (EIFS)Joe Liebermanspecial
07/28/2026Fire-Resistant Penetrations and JointsJoe Liebermanspecial
07/28/2026MasonryJoe Liebermanspecial
07/28/2026Post-installed AnchorsJoe Liebermanspecial
07/28/2026Structural Stability – Alterations of existing buildingsJoe Liebermanspecial
07/28/2026Subgrade InspectionsJoe Liebermanspecial
07/28/2026Energy Code Compliance InspectionsJoe Liebermanprogress
05/13/2026HVAC-R and service water heating system controlsJoe Liebermanenergy_progress
05/13/2026Fire-Resistant Penetrations and JointsJoe Liebermanspecial
05/13/2026Mechanical SystemsJoe Liebermanspecial
05/13/2026FinalJoe Liebermanprogress
05/13/2026HVAC-R and service water piping design and insulationJoe Liebermanenergy_progress
05/13/2026Maintenance informationJoe Liebermanenergy_progress
05/13/2026HVAC-R and service water heating equipmentJoe Liebermanenergy_progress
05/12/2026Energy Code Compliance InspectionsJoe Liebermanprogress
05/12/2026MasonryJoe Liebermanspecial
05/12/2026Concrete - Cast-In-PlaceJoe Liebermanspecial
05/12/2026Exterior Insulation and Finish Systems (EIFS)Joe Liebermanspecial
05/12/2026Fire-Resistant Penetrations and JointsJoe Liebermanspecial
Latest 25 of 120.
146 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account