Two family frame
1583 EAST 12 STREET
BROOKLYN · Midwood · BIN 3181730
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R4-1Zoning
2,163 sfGross Floor Area
2Units
6 Open Violations ▸FDNY Report ↗
Two family frame · 2,025 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneralOther
Permit Issued — active, not yet Signed-off
Attic10p · 1 filing · 20 docs
Floor 219p · 1 filing · 20 docs
Floor 1Under Construction33p · 2 filings · 20 docs
Cellar19p · 1 filing · 20 docs
Site & exterior27p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CUBE BUILDERS GROUP NY303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/11/2024$900K—— → —$416/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FOCAL POINT ARCHITECTS & ASS.806/16/2026
MSM ENGINEERING SERVICES, PLLC206/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor707/08/2026
PIPESTYLISTS, INCPlumbing207/08/2026
CROWN BUILDER & CONSTRUCTGeneral Contractor104/09/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
W.R. PLBG AND HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416506/16/2026
M. INT'L ENGINEERING PLLC3129206/06/2025
MSM ENGINEERING SERVICES,8449110/02/2024
Building Lifecycle
All (92)Filed (10)Permit Issued (10)Violation (6)Inspection (6)Objection (30)Special Inspection (30)
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
06/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
06/17/2026
Special inspection requirement — Permanent certificate
ELIAS RASABI
06/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
06/17/2026
Special inspection requirement — Maintenance information
ELIAS RASABI
06/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
06/16/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION WITH FACADE AND WINDOW REPLACEMENT TO THE REFERENCED TWO (2) STORY PLUS ATTIC AND CELLAR, TWO (2) FAMILY BUILDING AT THE REFERENCED PROPERTY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01061094-P4
06/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
06/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
06/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
06/16/2026
Special inspection requirement — Permanent certificate
ELIAS RASABI
06/16/2026
Special inspection requirement — Maintenance information
ELIAS RASABI
05/08/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION WITH FACADE AND WINDOW REPLACEMENT TO THE REFERENCED TWO (2) STORY PLUS ATTIC AND CELLAR, TWO (2) FAMILY BUILDING AT THE REFERENCED PROPERTY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01061094-P3
05/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
05/07/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
05/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
05/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
05/07/2026
Special inspection requirement — Permanent certificate
ELIAS RASABI
05/07/2026
Special inspection requirement — Maintenance information
ELIAS RASABI
04/28/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/16/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/20/2026
Permit issued — General Construction
B01061094-S1-GC
03/13/2026
Permit issued — Curb Cut
B01087116-S2-CC
03/04/2026
Permit issued — Plumbing
B01061094-S2-PL
02/26/2026
Permit issued — Plumbing
B01061094-S2-PL
02/25/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/30/2025
Permit issued — Mechanical Systems
B01061094-S3-MS
06/19/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION WITH FACADE AND WINDOW REPLACEMENT TO THE REFERENCED TWO (2) STORY PLUS ATTIC AND CELLAR, TWO (2) FAMILY BUILDING AT THE REFERENCED PROPERTY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01061094-S3
06/06/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION WITH FACADE AND WINDOW REPLACEMENT TO THE REFERENCED TWO (2) STORY PLUS ATTIC AND CELLAR, TWO (2) FAMILY BUILDING AT THE REFERENCED PROPERTY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01061094-P2
06/06/2025
Filed — Alteration CO
FILING FOR CURB CUT IN CONJUNCTION TO ALT1 APPLICATION NUMBER B01087116-I1
B01087116-S2
06/06/2025
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
06/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
06/06/2025
Special inspection requirement — Final
ELIAS RASABI
06/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
06/06/2025
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
06/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
06/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
06/06/2025
Special inspection requirement — Final
Feng Zhang
06/04/2025
Permit issued — Plumbing
B01061094-S2-PL
05/20/2025
Permit issued — Construction Fence
B01061094-I1-FN
04/23/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION WITH FACADE AND WINDOW REPLACEMENT TO THE REFERENCED TWO (2) STORY PLUS ATTIC AND CELLAR, TWO (2) FAMILY BUILDING AT THE REFERENCED PROPERTY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01061094-P1
03/28/2025
Permit issued — General Construction
B01061094-S1-GC
03/27/2025
Objection resolved — Addressed
03/11/2025
Special inspection requirement — Air barrier — testing
MOHAMED MAHMOUD
02/28/2025
Violation issued (ECB, open)
Construction
02/28/2025
Violation issued (ECB, open)
Site Safety
02/28/2025
Violation issued (ECB, open)
Construction
02/19/2025
Objection raised — Other
02/17/2025
Objection resolved — Addressed
02/17/2025
Objection resolved — Addressed
02/17/2025
Objection resolved — Addressed
02/17/2025
Objection resolved — Addressed
02/17/2025
Objection resolved — Addressed
02/17/2025
Objection resolved — Addressed
02/17/2025
Objection resolved — Addressed
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY03/20/2026
DOB NOWCurb CutPermit IssuedCROWN BUILDER & CONSTRUCT03/13/2026
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP03/04/2026
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP02/26/2026
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY06/30/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/04/2025
DOB NOWConstruction FencePermit IssuedCUBE BUILDERS GROUP NY05/20/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY03/28/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/30/2024
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY06/18/2024
1 project · most recent 06/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/16/2026Signed-offTRI CITY MECHANICAL GROUPGas, Water/Sanitary
1 project · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/28/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/16/2026Pass-Final PL - UndergroundPassView ↗
11/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/24/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/24/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
06/17/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
06/17/2026HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
06/17/2026Permanent certificateELIAS RASABIenergy_progress
06/17/2026HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
06/17/2026Maintenance informationELIAS RASABIenergy_progress
06/17/2026HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
06/17/2026Energy Code Compliance InspectionsELIAS RASABIprogress
06/16/2026HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
06/16/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
06/16/2026Energy Code Compliance InspectionsELIAS RASABIprogress
06/16/2026HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
06/16/2026HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
06/16/2026Permanent certificateELIAS RASABIenergy_progress
06/16/2026Maintenance informationELIAS RASABIenergy_progress
05/07/2026HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
05/07/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
05/07/2026Energy Code Compliance InspectionsELIAS RASABIprogress
05/07/2026HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
05/07/2026HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
05/07/2026Permanent certificateELIAS RASABIenergy_progress
05/07/2026Maintenance informationELIAS RASABIenergy_progress
06/06/2025Energy Code Compliance InspectionsNANIK MASSANDprogress
06/06/2025Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
06/06/2025FinalELIAS RASABIprogress
06/06/2025Fire-Resistance Rated ConstructionELIAS RASABIprogress
Latest 25 of 43.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026B01087116-S2Request digital key ↗
08/17/2026B01061094-P1Request digital key ↗
08/17/2026B01061094-P4Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01087116-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026B01087116-I1Open ↗
08/31/2026B01087116-I1Open ↗
08/27/2026B01061094-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026B01087116-S2Open ↗
08/21/2026B01087116-I1Open ↗
08/17/2026B01061094-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026B01087116-I1Open ↗
08/27/2026B01061094-P4Open ↗
08/26/2026B01061094-P3Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026B01087116-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/21/2026B01087116-S2Open ↗
08/17/2026B01061094-P4Open ↗
08/17/2026B01061094-P3Open ↗
Showing 3 of 9 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/15/2026B01087116-I1Open ↗