RoofUnder Construction7p · 15 filings · 20 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Supported Scaffold
TEMPORARY SYSTEMS SCAFFOLD AS PER DRAWINGS. SYSTEMS SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
25 documents
TEMPORARY MONORAIL SYSTEM AS PER DRAWINGS. MONORAIL SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
4 documents
TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTIES DURING BLDG ALTERATION, FILED SEP. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 42Under Construction41p · 6 filings · 20 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Structural
Modification to mechanical systems as per plans filed herewith.
On file for this job
14 documents · 1 drawing sheet
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Structural modifications as per plans filed herewith.
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 41Under Construction109p · 12 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Interior renovation as per plans filed herewith. No change of use, egress or occupancy under this application.
On file for this job
9 documents · 4 drawing sheets
Structural modifications as per plans filed herewith.
On file for this job
3 documents · 1 drawing sheet
Structural modification as per plans filed herewith.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4068p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Interior renovation as per plans filed herewith.
On file for this job
15 documents · 4 drawing sheets
Structural modification as per plans filed herewith.
On file for this job
3 documents · 2 drawing sheets
Modification to mechanical systems as per plans filed herewith.
On file for this job
3 documents
Latest 3 of 8 filings on this floor.
Floor 3981p · 18 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
Structural modification as per plans filed herewith.
On file for this job
3 documents · 2 drawing sheets
Modification to mechanical systems as per plans filed herewith.
On file for this job
3 documents
USE OF GLASS MANIPULATOR DURING EXISTING BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121326038.
On file for this job
2 documents
Latest 3 of 8 filings on this floor.
Floor 3862p · 13 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Modification to Plumbing and Sprinkler systems as per plans filed herewith. No change in use occupancy or egress.
On file for this job
6 documents · 1 drawing sheet
Modification to Plumbing and Sprinkler systems as per plans filed herewith. No change in use occupancy or egress.
On file for this job
7 documents · 1 drawing sheet
INSTALLATION OF SPRINKLER HEADS AND INSTALLATION OF TEMP LOOP SYSTEM. INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 37Under Construction42p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Modification to Plumbing and Sprinkler systems as per plans filed herewith. No change in use occupancy or egress.
On file for this job
6 documents · 3 drawing sheets
Interior renovation as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
15 documents · 9 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 36Under Construction13p · 8 filings · 20 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this job
4 documents
INSTALLATION OF SPRINKLER HEADS AND INSTALLATION OF TEMP LOOP SYSTEM. INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 35Under Construction50p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
INSTALLATION OF SPRINKLER HEADS AND INSTALLATION OF TEMP LOOP SYSTEM. INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
3 documents · 2 drawing sheets
installation of air conditioning systems and associated duct / piping as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
16 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 34Under Construction52p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
INSTALLATION OF SPRINKLER HEADS AND INSTALLATION OF TEMP LOOP SYSTEM. INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
3 documents · 2 drawing sheets
installation of air conditioning systems and associated duct / piping as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
16 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 33Under Construction51p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Modification to Plumbing and Sprinkler systems as per plans filed herewith. No change in use occupancy or egress.
On file for this job
7 documents · 3 drawing sheets
Modification to Mechanical systems as per plans filed herewith. No change in use, occupancy or egress
On file for this job
13 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 32Under Construction38p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Modification to Plumbing and Sprinkler systems as per plans filed herewith. No change in use occupancy or egress.
On file for this job
6 documents · 3 drawing sheets
Interior renovation as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
15 documents · 6 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 31Under Construction28p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Modification to plumbing and sprinkler systems as per plans filed herewith.
On file for this job
15 documents · 5 drawing sheets
Interior renovation as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
27 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 30Under Construction29p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Modification to plumbing and sprinkler systems as per plans filed herewith.
On file for this job
15 documents · 3 drawing sheets
Interior renovation as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
27 documents · 7 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 29Under Construction45p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modification to sprinkler systems as per plans filed herewith.
On file for this job
4 documents · 2 drawing sheets
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Modification to Mechanical systems as per plans filed herewith.
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 28Under Construction31p · 2 filings · 16 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
On file for this job
11 documents · 3 drawing sheets
Floor 27Under Construction19p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Modifications to existing sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
3 documents · 1 drawing sheet
Removal and installation of interior non bearing partitions as per plans filed herewith. Partial removal of walls and related finishes. New walls, ceilings, and finishes. No change in use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 26Under Construction14p · 4 filings · 18 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Modifications to plumbing systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
4 documents · 1 drawing sheet
Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 25Under Construction6p · 1 filing · 5 docs
Fire Protection
Issued Permit Scope
Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Floor 24Under Construction6p · 1 filing · 5 docs
Fire Protection
Issued Permit Scope
Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Floor 23Under Construction57p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
INSTALLATION OF SPRINKLER HEADS AND INSTALLATION OF TEMP LOOP SYSTEM. INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
3 documents · 4 drawing sheets
installation of air conditioning systems and associated duct / piping as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
16 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 22Under Construction7p · 2 filings · 8 docs
Fire ProtectionPlumbing
Issued Permit Scope
Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
INSTALLATION OF SPRINKLER HEADS AND INSTALLATION OF TEMP LOOP SYSTEM. INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
3 documents · 1 drawing sheet
Floor 21Under Construction6p · 1 filing · 5 docs
Fire Protection
Issued Permit Scope
Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Floor 20Under Construction42p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Modification to Plumbing and Sprinkler systems as per plans filed herewith. No change in use occupancy or egress.
On file for this job
6 documents · 3 drawing sheets
Interior renovation as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
15 documents · 10 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 19Under Construction39p · 3 filings · 19 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Interior renovation as per plans filed herewith.
On file for this job
10 documents · 7 drawing sheets
Modification to mechanical systems as per plans filed herewith.
On file for this job
4 documents
Floor 18Under Construction40p · 3 filings · 19 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Interior renovation as per plans filed herewith.
On file for this job
10 documents · 8 drawing sheets
Modification to mechanical systems as per plans filed herewith.
On file for this job
4 documents
Floor 17Under Construction7p · 2 filings · 8 docs
Fire ProtectionMechanical
Issued Permit Scope
Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
MORGAN STANLEY - 17TH FLOOR MODIFICATIONS - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
Floor 16Under Construction6p · 1 filing · 5 docs
Fire Protection
Issued Permit Scope
Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Floor 1518p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Sprinklers
Modification to plumbing and sprinkler systems as per plans filed herewith.
On file for this job
4 documents · 3 drawing sheets
Modification to Mechanical system as per plans filed herewith.
On file for this job
15 documents · 1 drawing sheet
Interior renovation as per plans filed herewith.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 14Under Construction9p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Modification to plumbing and sprinkler systems as per plans filed herewith.
On file for this job
4 documents · 1 drawing sheet
Modification to plumbing and sprinkler system as per plans filed herewith.
On file for this job
11 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 13Under Construction6p · 1 filing · 5 docs
Fire Protection
Issued Permit Scope
Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Floor 12Under Construction8p · 3 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
9 documents · 1 drawing sheet
Modification to plumbing and sprinkler system as per plans filed herewith.
On file for this job
11 documents · 1 drawing sheet
Floor 11Under Construction6p · 1 filing · 5 docs
Fire Protection
Issued Permit Scope
Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Floor 10Under Construction12p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers
Modifications to existing sprinkler system as per plans filed herewith. Replacement of all existing sprinkler control valve assemblies at every floor with new. All sprinkler heads existing to remain. No change in use egress or occupancy.
On file for this job
5 documents
Interior renovation as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
24 documents · 2 drawing sheets
Structural modifications as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 943p · 16 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
Additions / modifications to existing plumbing system. No change in use, egress or occupancy.
On file for this job
13 documents · 2 drawing sheets
Modifications to Plumbing, Sprinkler and Standpipe systems as per plans filed herewith. No change in use occupancy or egress.
On file for this job
10 documents · 2 drawing sheets
Interior renovation as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
24 documents · 8 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 836p · 13 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
Additions / modifications to existing plumbing system. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Modifications to Plumbing, Sprinkler and Standpipe systems as per plans filed herewith. No change in use occupancy or egress.
On file for this job
10 documents · 1 drawing sheet
Modification to plumbing and sprinkler systems as per plans filed herewith.
On file for this job
36 documents · 6 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 7Under Construction45p · 12 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods · Sprinklers
TEMPORARY SYSTEMS SCAFFOLD AS PER DRAWINGS. SYSTEMS SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
25 documents · 1 drawing sheet
Additions / modifications to existing plumbing system. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Interior Partitions, fixtures/finishes to construct employee cafeteria w/ accessory roof terrace (See Alt-1# 121326038), exterior roof terrace fixtures & finishes, new exterior doors. No change in use egress or occupancy.
On file for this job
14 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 6Under Construction13p · 17 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers
INSTALLATION OF DUAL 7000# CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPL SUB SEP TO ELEVATOR DEPT.
On file for this job
12 documents · 2 drawing sheets
Additions / modifications to existing plumbing system. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Installation of weather wall as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 5Under Construction13p · 12 filings · 20 docs
ArchitectureDMFire ProtectionGeneralPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers
Installation of curtain wall, storefront and adjacent metal cladding as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
12 documents · 6 drawing sheets
Additions / modifications to existing plumbing system. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Structural modification as per plans filed herewith.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 4Under Construction13p · 19 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers
INSTALLATION OF DUAL 7000# CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPL SUB SEP TO ELEVATOR DEPT.
On file for this job
12 documents · 6 drawing sheets
Additions / modifications to existing plumbing system. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Interior modification as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
3 documents · 6 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 313p · 22 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
Additions / modifications to existing plumbing system. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
12 documents · 11 drawing sheets
New mechanical mezzanine, new slab infills, new beam web penetrations. No change in use, egress or occupancy.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2Under Construction13p · 17 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Structural modifications as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
3 documents · 1 drawing sheet
Installation of curtain wall, storefront and adjacent metal cladding as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
12 documents · 6 drawing sheets
Additions / modifications to existing plumbing system. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 113p · 29 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Interior renovation as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
10 documents · 1 drawing sheet
Installation of temp walls as per plans filed herewith. Scope transferred from #M08014936-I1. No change in use, occupancy or egress.
On file for this job
24 documents · 2 drawing sheets
Modification to plumbing and sprinkler systems as per plans filed herewith. First floor, Cellar (LLA), Sub-Cellar (LLB)
On file for this job
23 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Mezzanine13p · 28 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modification to existing Mechanical System as per plans filed herewith.
On file for this job
19 documents · 2 drawing sheets
Modification to structural systems as per plans filed herewith. No change in use occupancy or egress.
On file for this job
12 documents · 3 drawing sheets
Modification to Mechanical systems as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
21 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
CellarUnder Construction336p · 28 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Structural modifications as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
3 documents · 2 drawing sheets
Removal and installation of interior non-bearing partitions, related finishes, storefront and interior stairs as per plans filed herewith. No change in use or occupancy. Change in egress.
On file for this job
6 documents
Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
6 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Sub-CellarUnder Construction300p · 24 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Structural modifications as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
3 documents · 2 drawing sheets
Removal and installation of interior non-bearing partitions, related finishes, storefront and interior stairs as per plans filed herewith. No change in use or occupancy. Change in egress.
On file for this job
6 documents
Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
6 documents · 4 drawing sheets