One story retail building
159-02 HILLSIDE AVENUE
QUEENS · BIN 4208976
💬 Discuss this project
1917Year Built
1Stories
K1Building Class
C4-4DZoning
11,837 sfGross Floor Area
13Units
5 Open Violations ▸FDNY Report ↗
One story retail building · Owner of record: EIK JAMAICA ASSOCIATES, LLC · 14,621 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof18p · 3 filings · 20 docs
Bulkhead2p · 2 filings · 20 docs
Floor 811p · 2 filings · 20 docs
Floor 77p · 2 filings · 20 docs
Floor 68p · 2 filings · 20 docs
Floor 57p · 2 filings · 20 docs
Floor 48p · 2 filings · 20 docs
Floor 312p · 2 filings · 20 docs
Floor 216p · 2 filings · 20 docs
Floor 116p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS209/13/2026
KHEDOURI ASSOCIATES703/22/2026
EIK JAMAICA ASSOCIATES,LL103/22/2026
ELK JAMAICA ASSOCIATES LL103/22/2026
KAEDOURI ASSOCIATES LLC103/22/2026
EIK SPACE JAMAICA ASSOCIATES103/21/2026
LARRY KHEDOURI ASSOCIATES203/21/2026
PARSON CAR SERVICE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)303/21/2026
LOUIS STRIAR203/21/2026
YOUN DESIGN CORP203/21/2026
XPDITE GROUP 103303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK MANAGEMENT USA CORPGeneral Contractor409/02/2026
DACON, CHADElectrical103/21/2026
J & G CONSTRUCTION SVCSGeneral Contractor107/11/2026
CANALE, WILLIAMElectrical103/21/2026
YATZIV CORPGeneral Contractor107/10/2026
NEPTUNE SIGNS AWNINGSScaffold108/18/2026
SIGNSTAR NYCScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADROIT ENGINEERING PLLC8885108/13/2024
Building Lifecycle
All (87)Filed (18)Permit Issued (6)Signed Off (2)Violation (18)Objection (13)Special Inspection (30)
09/10/2026
Filed — Alteration
BPP FILED HEREWITH FOR A NEW SIDEWALK, CURB & ROADWAY FILED IN CONJUNCTION TO NEW BUILDING APPLICATION # Q01360563-I1
Q01457551-I1
09/01/2026
Permit issued — Construction Fence
Q01276900-I1-FN
08/24/2026
Objection resolved — Resolved
08/17/2026
Signed off — Full Demolition
Full demolition to a one story building
Q01082907-I1
08/17/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
08/12/2026
Objection raised — Other
08/10/2026
Objection raised — Other
08/06/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION JOB #Q01360563-I1
Q01360563-S8
08/06/2026
Special inspection requirement — Standpipe Systems
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/06/2026
Special inspection requirement — Post-installed Anchors
08/04/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION JOB #Q01360563-I1
Q01360563-S7
07/30/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION JOB #Q01360563-I1
Q01360563-S4
07/29/2026
Objection resolved — Addressed
07/28/2026
Special inspection requirement — Standpipe Systems
07/28/2026
Special inspection requirement — Sprinkler Systems
07/13/2026
Objection resolved — Addressed
07/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01403432-I1
07/10/2026
Permit issued — Sidewalk Shed
Q01403432-I1-SH
07/08/2026
Permit issued — Full Demolition
Q01082907-I1-FD
06/22/2026
Filed — Alteration
Q01241214-I1
06/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/16/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/16/2026
Special inspection requirement — Maintenance information
06/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/15/2026
Objection resolved — Addressed
06/08/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION JOB #Q01360563-I1
Q01360563-S6
06/04/2026
Special inspection requirement — Post-installed Anchors
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/03/2026
Special inspection requirement — Sprinkler Systems
06/02/2026
Special inspection requirement — Electrical motors and elevators
06/02/2026
Special inspection requirement — Metering
05/27/2026
Objection raised — Other
05/26/2026
Objection raised — Other
05/25/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION JOB #Q01360563-I1
Q01360563-S5
05/21/2026
Objection raised — Other
05/20/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION JOB #Q01360563-I1
Q01360563-S1
05/20/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION JOB #Q01360563-I1
Q01360563-S2
05/20/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION JOB #Q01360563-I1
Q01360563-S3
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/20/2026
Special inspection requirement — Maintenance information
05/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/20/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/20/2026
Special inspection requirement — Shutoff dampers
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
05/20/2026
Special inspection requirement — Post-installed Anchors
05/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/19/2026
Special inspection requirement — Final
05/19/2026
Special inspection requirement — Deep Foundation Elements
05/19/2026
Special inspection requirement — Mechanical Systems
05/19/2026
Special inspection requirement — Concrete - Cast-In-Place
05/19/2026
Special inspection requirement — Masonry
03/23/2026
Objection raised — Other
02/25/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION JOB #Q01360563-I1
Q01360563-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/05/2025
Permit issued — Construction Fence
Q01276900-I1-FN
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPARK MANAGEMENT USA CORP09/01/2026
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS07/10/2026
DOB NOWFull DemolitionSigned-offYATZIV CORP07/08/2026
DOB NOWConstruction FencePermit IssuedPARK MANAGEMENT USA CORP09/05/2025
DOB NOWSignSigned-offSIGNSTAR NYC08/21/2023
DOB NOWSignPermit IssuedG BUILDERS MANAGEMENT INC10/25/2019
BISPLISSUEDKATAN P & H INC06/25/2019
BISOTISSUEDMODERN G.C. RENOVATION CO06/17/2019
BISPLISSUEDTOP DOG PLBG & HTG CORP07/25/2011
BISPLISSUEDTOP DOG PLBG & HTG CORP10/08/2009
BISBLISSUEDTOP DOG PLBG & HTG CORP10/08/2009
BISFPISSUEDFIRE COMMAND CO, INC08/04/2009
BISPLISSUEDCATMAN PLUMBING INC12/03/2008
BISBLISSUEDCATMAN PLUMBING INC12/03/2008
BISOTISSUEDGOLDSMITH CONSTRUCTION CORP04/01/2008
BISPLISSUEDTHE PLUMBING COMPANY11/16/2005
BISOTISSUEDGOLD SMITH CONSTRUCTION CORP10/28/2005
BISMHISSUEDA INTERNATIONAL LTD05/25/2004
BISOTISSUEDCHINESE AMERICAN URBAN CONSTRUCT04/20/2004
BISMHISSUEDSUPERIOR CITY APARTMENT09/09/2003
BISPLISSUEDMAINLAND PLG. & HTG.07/28/2000
BISPLISSUEDMAINLAND PLG. & HTG.06/23/2000
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM06/23/2000
BISOTISSUEDORIENT CONSTRUCTION GROUP INC06/13/2000
BISFSISSUEDPUBLIC FUEL SERVICE CO.10/03/1996
BISOTISSUEDN/A06/17/1993
BIS—ISSUEDBANDOW CO06/22/1992
BISOTISSUEDWEI ASSOCIATES01/15/1992
1 project · most recent 08/06/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/06/2026——Ventilation Systems
Ventilation
Greenheck ERV-10-20H-VG 350 CFM · Erv ×1
1 project · most recent 08/06/2026
Sprinkler System
FiledStatusContractorScope
08/06/2026——Sprinkler System
8 projects · most recent 05/18/2026
General Wiring
FiledStatusContractorScope
05/18/2026Permit IssuedRICHARD NEU—
12/07/2025Permit IssuedPOWER DIRECT ELECTRIC INC1 meters, 1 new_meters
12/07/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
12/07/2025Permit IssuedPOWER DIRECT ELECTRIC INC101 meters, 101 new_meters
02/07/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
08/22/2023CompleteRAINBOW ELECTRIC CO., INC—
08/05/2019CompleteJONG HYUN KIM—
05/09/2019Permit IssuedWCK ELECTRIC CORP.General Wiring
2 projects · most recent 08/06/2026
Concrete Masonry
FiledStatusContractorScope
08/06/2026——1 scope_items
05/14/2025——Concrete, Masonry
2 projects · most recent 07/10/2026
Sidewalk Shed Fence
FiledStatusContractorScope
07/10/2026Permit IssuedJ & G CONSTRUCTION SVCSSidewalk Shed
08/25/2025Permit IssuedPARK MANAGEMENT USA CORPFence
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
08/06/2026Post-installed Anchors—special
08/06/2026Standpipe Systems—special
08/06/2026Fire-Resistant Penetrations and Joints—special
07/28/2026Sprinkler Systems—special
07/28/2026Standpipe Systems—special
06/16/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/16/2026HVAC-R and service water piping design and insulation—energy_progress
06/16/2026Fire-Resistant Penetrations and Joints—special
06/16/2026HVAC-R and service water heating system controls—energy_progress
06/16/2026HVAC-R and service water heating equipment—energy_progress
06/16/2026Maintenance information—energy_progress
06/04/2026Fire-Resistant Penetrations and Joints—special
06/04/2026Post-installed Anchors—special
06/03/2026Sprinkler Systems—special
06/02/2026Electrical motors and elevators—energy_progress
06/02/2026Metering—energy_progress
05/20/2026HVAC-R and service water heating system controls—energy_progress
05/20/2026HVAC-R and service water piping design and insulation—energy_progress
05/20/2026Shutoff dampers—energy_progress
05/20/2026Duct leakage testing, insulation and design—energy_progress
05/20/2026Energy Code Compliance Inspections—progress
05/20/2026Post-installed Anchors—special
05/20/2026Fire-Resistant Penetrations and Joints—special
05/20/2026HVAC-R and service water heating equipment—energy_progress
05/20/2026Maintenance information—energy_progress
Latest 25 of 79.
▾Documents — 192 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
09/21/2026Q01457551-I1Request digital key ↗
08/24/2026Q00900922-I1Request digital key ↗
08/21/2026Q01082907-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Sign1
08/28/2026Q00217125-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION15
02/26/2026421843633Open ↗
05/06/2019421739989Open ↗
10/28/2016421367087Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION10
07/17/2019421739989Open ↗
06/26/2019421739989Open ↗
08/11/2011410173878Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records20
▸DOB NOWRestrictive Declaration/Easement 16
08/16/2026Q01360563-I1Open ↗
08/16/2026Q01360563-S8Open ↗
08/16/2026Q01360563-S7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWRestrictive Declaration/Easement 26
08/16/2026Q01360563-I1Open ↗
08/16/2026Q01360563-S8Open ↗
08/16/2026Q01360563-S7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/16/2026Q01360563-I1Open ↗
08/13/2026Q01360563-I1Open ↗
08/13/2026Q01189789-I1Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
11/10/2008410173878Open ↗
11/05/2008410152472Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
02/26/2026421843633Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q01360563-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026Q01360563-I1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/21/2026Q01457551-I1Open ↗
08/28/2026Q00217125-I1Open ↗
08/24/2026Q00900922-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
05/29/2019421739989Open ↗
05/06/2019421739989Open ↗
09/24/2016421367087Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
05/29/2019421739989Open ↗
05/06/2019421739989Open ↗
10/01/2008410173878Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/29/2019421739989Open ↗
05/06/2019421739989Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/01/2008410173878Open ↗
09/08/2008410152472Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026Q01082907-I1Open ↗
08/26/2026Q01082907-I1Open ↗
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING8
09/27/2010410173878Open ↗
11/27/2009410152472Open ↗
11/12/2009410152472Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
09/01/2011410173878Open ↗
08/18/2011410173878Open ↗
02/24/2011410173878Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
08/05/2009410173878Open ↗
10/01/2008410173878Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/06/2019421739989Open ↗
09/24/2016421367087Open ↗
▸DOB NOWGas Cut-Off1
08/21/2026Q01082907-I1Open ↗
▸DOB NOWWater Cut-Off1
08/21/2026Q01082907-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/21/2026Q01082907-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/21/2026Q01082907-I1Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes2
05/29/2019421739989Open ↗
05/06/2019421739989Open ↗
▸DOB NOWStreet Tree Checklist2
09/21/2026Q01457551-I1Open ↗
08/16/2026Q01360563-I1Open ↗
▸BISSTREET TREE CHECKLIST1
09/24/2016421367087Open ↗
▸DOB NOWBPP: Street Trees Site Plan A451
09/21/2026Q01457551-I1Open ↗
▸DOB NOWStreet Trees: Receipt Of Street Trees Site Plan P241
09/21/2026Q01457551-I1Open ↗
▸Environmental & Asbestos15
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
10/01/2008410173878Open ↗
09/08/2008410152472Open ↗
09/08/2008410152472Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
06/27/2009420042698Open ↗
03/04/2008410070792Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/06/2019421739989Open ↗
10/27/2016421367087Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026Q00900922-I1Open ↗
08/21/2026Q01082907-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
05/22/2019421739989Open ↗
▸DOB NOWRodent Control1
08/21/2026Q01082907-I1Open ↗
▸DOB NOWOER: Notice to Proceed1
08/28/2026Q00217125-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/29/2019421739989Open ↗
05/06/2019421739989Open ↗
09/24/2016421367087Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/16/2026Q01360563-S2Open ↗
08/15/2026Q01360563-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/16/2026Q01360563-S2Open ↗
08/15/2026Q01360563-S1Open ↗
▸DOB NOWTR5 Test Report1
08/15/2026Q01360563-S1Open ↗
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS5
06/27/2009420042698Open ↗
11/05/2008410152472Open ↗
10/01/2008410173878Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/03/2011410173878Open ↗
08/21/2009410070792Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
10/03/2011410173878Open ↗
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
09/01/2011410173878Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/30/2011410173878Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
05/29/2019421739989Open ↗
05/06/2019421739989Open ↗
09/24/2016421367087Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET6
02/26/2026421843633Open ↗
05/06/2019421739989Open ↗
09/24/2016421367087Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION1
05/24/2019421739989Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial4
09/21/2026Q01457551-I1Open ↗
08/16/2026Q01360563-I1Open ↗
08/13/2026Q01189789-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification2
08/16/2026Q01360563-I1Open ↗
08/13/2026Q01082907-I1Open ↗
▸DOB NOWExisting Sidewalk Photographs1
09/21/2026Q01457551-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/21/2026Q01082907-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01082907-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01360563-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/21/2026Q01082907-I1Open ↗