← Back
Two family frame
159-03 84 DRIVE
QUEENS · BIN 4209423
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R4AZoning
3,082 sfGross Floor Area
2Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Two family frame · Owner of record: MADAL BAL NY LLC · 4,360 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof7p · 1 filing · 14 docs
Floor 249p · 4 filings · 20 docs
Floor 147p · 2 filings · 20 docs
Cellar52p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORDEST SERVICE807/08/2026
CONTRACTI WA103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/02/2019$764K—THE AURORA L. MAKICH RESIDENCE TRUST → MADAL BAL NY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING3803/21/2026
Advanced Solar Solutions103/21/2026
NORTHEAST SERVICE INTERIORS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRIGGS SERVICES LLCGeneral Contractor1907/08/2026
NORDEST SERVICES LLCGeneral Contractor407/08/2026
ADVANCED SOLAR SOLUTIONSGeneral Contractor203/21/2026
WA CONTRACTING CORPGeneral Contractor203/21/2026
IMPACT PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MB INSPECTIONS, CORP.8703106/14/2024
ASSURE PROFESSIONAL ENGIN69621108/11/2023
MJ ENGINEERING & DESIGN5546109/02/2021
Building Lifecycle
All (122)Filed (22)Permit Issued (16)Signed Off (7)Violation (1)Inspection (8)Objection (38)Special Inspection (30)
02/27/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/15/2024
Signed off — Alteration
Q01063177-I1
08/02/2024
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES FOR NEWTWO FAMILY DWELLING AS SHOWN ON PLANS. THERE IS NO CHNAGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Q00505535-I1
07/22/2024
Permit issued — Solar
Q01063177-I1-SL
07/10/2024
Special inspection requirement — Air barrier - visual inspection
JESS WALKER
07/10/2024
Special inspection requirement — Permanent certificate
JESS WALKER
07/10/2024
Special inspection requirement — Fenestration air leakage
JESS WALKER
07/10/2024
Special inspection requirement — Maintenance information
JESS WALKER
07/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JESS WALKER
07/10/2024
Special inspection requirement — Air barrier — testing
JESS WALKER
07/10/2024
Special inspection requirement — Interior lighting power
JESS WALKER
07/10/2024
Special inspection requirement — Fenestration areas
JESS WALKER
07/10/2024
Special inspection requirement — Electric vehicle service equipment requirements
JESS WALKER
07/10/2024
Special inspection requirement — Insulation placement and R values
JESS WALKER
07/10/2024
Special inspection requirement — Protection of exposed foundation insulation
JESS WALKER
07/10/2024
Special inspection requirement — Metering
JESS WALKER
07/10/2024
Special inspection requirement — Air barrier continuity plan testing
JESS WALKER
06/25/2024
Filed — New Building
NEW 2 STORY, 2 FAMILY DWELLING
Q00591851-P4
06/14/2024
Filed — Alteration
Q01063177-I1
04/25/2024
Special inspection requirement — Permanent certificate
JESS WALKER
04/25/2024
Special inspection requirement — Electric vehicle service equipment requirements
JESS WALKER
04/25/2024
Special inspection requirement — Maintenance information
JESS WALKER
04/25/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JESS WALKER
04/25/2024
Special inspection requirement — Fenestration areas
JESS WALKER
04/25/2024
Special inspection requirement — Air barrier continuity plan testing
JESS WALKER
04/25/2024
Special inspection requirement — Fenestration air leakage
JESS WALKER
04/25/2024
Special inspection requirement — Metering
JESS WALKER
04/25/2024
Special inspection requirement — Insulation placement and R values
JESS WALKER
04/25/2024
Special inspection requirement — Air barrier — testing
JESS WALKER
04/25/2024
Special inspection requirement — Protection of exposed foundation insulation
JESS WALKER
04/25/2024
Special inspection requirement — Air barrier - visual inspection
JESS WALKER
04/25/2024
Special inspection requirement — Interior lighting power
JESS WALKER
03/20/2024
Filed — New Building
NEW 2 STORY, 2 FAMILY DWELLING
Q00591851-P3
03/04/2024
Special inspection requirement — Protection of exposed foundation insulation
JESS WALKER
03/04/2024
Special inspection requirement — Fenestration areas
JESS WALKER
03/04/2024
Special inspection requirement — Permanent certificate
JESS WALKER
03/04/2024
Special inspection requirement — Air barrier — testing
JESS WALKER
01/04/2024
Signed off — Alteration
Mechanical work in conjunction with NB filing for new two family dwelling.
Q00482625-I1
12/19/2023
Signed off — Alteration
new concrete foundation for proposed 2 family detached dwelling as shown on plans.
Q00518462-I1
12/14/2023
Permit issued — Earth Work
Q00518462-I1-EA
12/05/2023
Signed off — Alteration
New concrete masonry unit walls, slabs on grade, elevated concrete slab, structural steel and light gauge metal framing for new two family dwelling as shown on plans.
Q00482596-I1
11/29/2023
Signed off — Alteration
Install plywood construction fence to protect site during full demolition operations
Q00362424-I1
11/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/09/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/10/2023
Permit issued — Structural
Q00482596-I1-ST
08/11/2023
Filed — Alteration
Mechanical work in conjunction with NB filing for new two family dwelling.
Q00482625-P2
08/11/2023
Filed — Alteration
Mechanical work in conjunction with NB filing for new two family dwelling.
Q00482625-P3
08/03/2023
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES FOR NEWTWO FAMILY DWELLING AS SHOWN ON PLANS. THERE IS NO CHNAGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Q00505535-P3
06/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/11/2023
Permit issued — Mechanical Systems
Q00482625-I1-MS
05/11/2023
Permit issued — General Construction
Q00591851-I1-GC
05/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/26/2023
Permit issued — Mechanical Systems
Q00482625-I1-MS
04/25/2023
Permit issued — General Construction
Q00591851-I1-GC
04/20/2023
Signed off — Alteration
SUPPORT OF EXCAVATION FILED FOR STRUCTURAL SUPPORT DURING EXCAVATION OF 10 FT, DEEP AT CELLAR LEVEL FOR THE PROPOSED NEW CELLER SEE ARCHITECTURAL PLANS NO CHANGE TO USE, AGSUPPORT
Q00587320-I1
03/23/2023
Permit issued — Support of Excavation
Q00587320-I1-SE
03/07/2023
Filed — Alteration
New concrete masonry unit walls, slabs on grade, elevated concrete slab, structural steel and light gauge metal framing for new two family dwelling as shown on plans.
Q00482596-P3
03/07/2023
Permit issued — Mechanical Systems
Q00482625-I1-MS
02/13/2023
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES FOR NEWTWO FAMILY DWELLING AS SHOWN ON PLANS. THERE IS NO CHNAGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Q00505535-P2
12/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offADVANCED SOLAR SOLUTIONS07/22/2024
DOB NOWEarth WorkPermit IssuedBRIGGS SERVICES LLC12/14/2023
DOB NOWStructuralSigned-offBRIGGS SERVICES LLC10/10/2023
DOB NOWMechanical SystemsSigned-offBRIGGS SERVICES LLC05/11/2023
DOB NOWGeneral ConstructionPermit IssuedBRIGGS SERVICES LLC05/11/2023
DOB NOWMechanical SystemsSigned-offBRIGGS SERVICES LLC04/26/2023
DOB NOWGeneral ConstructionPermit IssuedBRIGGS SERVICES LLC04/25/2023
DOB NOWSupport of ExcavationSigned-offBRIGGS SERVICES LLC03/23/2023
DOB NOWMechanical SystemsSigned-offBRIGGS SERVICES LLC03/07/2023
DOB NOWPlumbingSigned-offIMPACT PLUMBING INC07/20/2022
DOB NOWGeneral ConstructionPermit IssuedBRIGGS SERVICES LLC07/19/2022
DOB NOWStructuralSigned-offBRIGGS SERVICES LLC07/04/2022
DOB NOWConstruction FenceSigned-offBRIGGS SERVICES LLC04/28/2022
DOB NOWFoundationPermit IssuedWA CONTRACTING CORP04/15/2022
DOB NOWConstruction FenceSigned-offNORDEST SERVICES LLC09/10/2020
DOB NOWConstruction FenceSigned-offNORDEST SERVICES LLC06/29/2020
BISEQISSUEDNORDEST SERVICES LLC09/14/2020
BIS—ISSUEDNORDEST SERVICES LLC09/14/2020
3 projects · most recent 06/07/2024
General Wiring
FiledStatusContractorScope
06/07/2024CompleteFALCO ELEC'L SERVICES INC—
05/03/2024CompleteSALVATORE CAMPISI & SONSGeneral Wiring
02/06/2024CompleteSALVATORE CAMPISI & SONSGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/09/2023Fail-Final CND-Occupancy InspectionFailView ↗
06/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 126
DateRequirementInspectorRole
07/10/2024Fenestration air leakageJESS WALKERenergy_progress
07/10/2024MeteringJESS WALKERenergy_progress
07/10/2024Permanent certificateJESS WALKERenergy_progress
07/10/2024Interior lighting powerJESS WALKERenergy_progress
07/10/2024Air barrier - visual inspectionJESS WALKERenergy_progress
07/10/2024Air barrier — testing JESS WALKERenergy_progress
07/10/2024Electric vehicle service equipment requirementsJESS WALKERenergy_progress
07/10/2024Insulation placement and R valuesJESS WALKERenergy_progress
07/10/2024Fenestration areasJESS WALKERenergy_progress
07/10/2024Protection of exposed foundation insulationJESS WALKERenergy_progress
07/10/2024Fenestration and door U-factor and product ratingsJESS WALKERenergy_progress
07/10/2024Air barrier continuity plan testingJESS WALKERenergy_progress
07/10/2024Maintenance informationJESS WALKERenergy_progress
04/25/2024Air barrier continuity plan testingJESS WALKERenergy_progress
04/25/2024Fenestration areasJESS WALKERenergy_progress
04/25/2024Permanent certificateJESS WALKERenergy_progress
04/25/2024Electric vehicle service equipment requirementsJESS WALKERenergy_progress
04/25/2024Maintenance informationJESS WALKERenergy_progress
04/25/2024Protection of exposed foundation insulationJESS WALKERenergy_progress
04/25/2024Air barrier — testing JESS WALKERenergy_progress
04/25/2024Air barrier - visual inspectionJESS WALKERenergy_progress
04/25/2024Fenestration and door U-factor and product ratingsJESS WALKERenergy_progress
04/25/2024MeteringJESS WALKERenergy_progress
04/25/2024Fenestration air leakageJESS WALKERenergy_progress
04/25/2024Insulation placement and R valuesJESS WALKERenergy_progress
Latest 25 of 126.
▾Documents — 155 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch21
08/27/2026Q00482625-I1Request digital key ↗
08/27/2026Q00482625-P2Request digital key ↗
08/27/2026Q00482625-P3Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00362424-I1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION2
10/20/2020421944043Open ↗
10/20/2020421944043Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
01/30/2023440762293Open ↗
05/11/2020421944043Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
02/12/2024440762293Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/06/2023440762293Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/06/2023440762293Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/23/2026Q00591851-P3Open ↗
08/15/2026Q00591851-P1Open ↗
08/14/2026Q00591851-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00591851-I1Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/27/2026Q00482625-I1Open ↗
08/27/2026Q00482625-P2Open ↗
08/27/2026Q00482625-P3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/27/2026Q00591851-P3Open ↗
09/27/2026Q00591851-P3Open ↗
09/01/2026Q00482625-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00482625-I1Open ↗
09/01/2026Q00482625-I1Open ↗
09/01/2026Q00482625-I1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/30/2023440762293Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/30/2023440762293Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/23/2026Q00591851-P3Open ↗
08/15/2026Q00591851-P1Open ↗
08/14/2026Q00591851-P2Open ↗
Showing 3 of 5 on file for this type
▸BISGAS CUT-OFF1
10/20/2020421944043Open ↗
▸BISELECTRIC CUT-OFF1
10/20/2020421944043Open ↗
▸BISSEWER CUT-OFF1
10/20/2020421944043Open ↗
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist5
08/23/2026Q00591851-P3Open ↗
08/15/2026Q00591851-P1Open ↗
08/14/2026Q00591851-P2Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES SITE PLAN1
01/30/2024440762293Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/20/2020421944043Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/20/2020421944043Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
10/20/2020421944043Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/15/2023440762293Open ↗
▸BISSTREET TREE CHECKLIST1
05/22/2023440762293Open ↗
▸BISSTREET TREE SIGNOFF1
09/15/2023440762293Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00591851-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00591851-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00591851-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/20/2020421944043Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00482625-I1Open ↗
08/13/2026Q00505535-I1Open ↗
08/13/2026Q00591851-I1Open ↗
▸Inspections & Test Reports1
▸BISBPP: FIELD INSPECTION1
02/16/2024440762293Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/26/2020421944043Open ↗
10/20/2020421944043Open ↗
10/20/2020421944043Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/24/2024440762293Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
10/20/2020421944043Open ↗
▸BISLANDMARKS APPROVAL1
10/20/2020421944043Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01063177-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
10/20/2020421944043Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
10/20/2020421944043Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
02/16/2024440762293Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM1
05/11/2020421944043Open ↗
▸BISEFILING COVER SHEET1
05/11/2020421944043Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/30/2023440762293Open ↗
▸Other Documents25
▸DOB NOWProperty Ownership Certification5
08/23/2026Q00591851-P3Open ↗
08/15/2026Q00591851-P1Open ↗
08/14/2026Q00591851-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/23/2026Q00591851-P3Open ↗
08/15/2026Q00591851-P1Open ↗
08/14/2026Q00591851-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
02/16/2024440762293Open ↗
10/06/2023440762293Open ↗
10/06/2023440762293Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/23/2026Q00591851-P3Open ↗
08/14/2026Q00591851-I1Open ↗
08/13/2026Q00591851-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00518462-I1Open ↗
08/13/2026Q00587320-I1Open ↗
▸DOB NOWPlot Diagram2
08/26/2026Q00518462-I1Open ↗
08/13/2026Q00518462-P1Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
02/12/2024440762293Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
09/15/2023440762293Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00591851-I1Open ↗