← Back
BuildNYC
Elevator apt, fireproof with stores
159-10 71ST AVENUE
QUEENS · BIN 4467448
💬 Discuss this project
2000Year Built
8Stories
D6Building Class
R6Zoning
209,525 sfGross Floor Area
142Units
LL97 CoveredRent Stabilized22 Active Violations 21 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: Atria 2000 Associates · 69,234 sf lot · 3.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAntenna layouts existing and proposed4p · 2 filings · 6 docs
Floor 1U.S. Renalcare South Flushing DialysisUnder Construction13p · 4 filings · 20 docs
Cellar902 Quentin RD. LLCUnder Construction5p · 2 filings · 20 docs
Site & exterior902 Quentin RD. LLC13p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Atria 2000 Associates6003/22/2026
902 Quentin Rd2707/08/2026
8MDR of Queens707/08/2026
Marx Development303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gga Studios107/06/2026
SW Engineering Company106/03/2026
Gad Ashoori PE811/26/2025
Scherer Design Group107/29/2020
Baileys Engineering105/21/2018
Arcnet Architects102/16/2018
HC Engineering112/07/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Avrohom Ackerman803/21/2026
CCM Services Group103/21/2026
JP Expedite203/21/2026
Construction Permit Services103/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Metro City ConstructionGeneral Contractor603/21/2026
Metro City ConstructionScaffold507/08/2026
Jacobs TelecommunGeneral Contractor303/21/2026
Associated Electric Cont of NElectrical203/21/2026
BLZ ElectricElectrical103/21/2026
Atria BuildersGeneral Contractor107/16/2026
Itc Service Group*General Contractor107/08/2026
Empire NY InstallationsScaffold107/08/2026
Cad Signs NYCSign hanger107/08/2026
Mega Electrical ContractingElectrical103/22/2026
Village P & H NYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL Engineering Inspectio6912106/03/2026
Special Testing & Consulting1688411/26/2025
JCT Development NY5030206/30/2021
Papay Engineering & Construction4506102/16/2018
Building Lifecycle
All (170)Filed (14)Permit Issued (12)Signed Off (7)Facade (FISP) (9)Violation (60)Inspection (6)Objection (32)Special Inspection (30)
07/23/2026
Permit issued — Structural
Q01408152-I1-ST
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
A
07/22/2026
Violation issued (HPD, open)
A
07/15/2026
Permit issued — General Construction
Q01418596-I1-GC
07/06/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR REMOVALS OF THE 1ST FLOOR OF AN 8 STORY BUILDING. NO CHANGE TO USE OR EGRESS UNDER THIS APPLICATION
Q01418596-I1
06/27/2026
Violation issued (ECB, open)
Unknown
06/17/2026
Special inspection requirement — Final
LESLEY SCHMERZLER
06/15/2026
Violation issued (HPD, closed)
C
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, closed)
C
06/03/2026
Filed — Alteration
GARAGE REPAIRS (REINFORCEMENT OF EXISTING STEEL MEMBERS ANDMETAL DECK)
Q01408152-I1
06/01/2026
Special inspection requirement — Structural Steel - Details
JOSHUA LUCKRITZ
05/29/2026
Violation issued (HPD, open)
C
05/29/2026
Violation issued (HPD, closed)
B
05/27/2026
Special inspection requirement — Structural Steel - Welding
JOSHUA LUCKRITZ
05/27/2026
Special inspection requirement — Final
Yakov Weinstein
05/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSHUA LUCKRITZ
05/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
03/20/2026
Violation issued (HPD, closed)
C
03/09/2026
Violation issued (HPD, closed)
C
03/09/2026
Violation issued (HPD, closed)
C
12/18/2025
Violation issued (HPD, closed)
A
12/18/2025
Violation issued (HPD, closed)
B
12/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
12/18/2025
Special inspection requirement — Concrete - Cast-In-Place
SEBASTIAN SETTEDUCATE JR., P.E
12/18/2025
Special inspection requirement — Structural Steel - Welding
SEBASTIAN SETTEDUCATE JR., P.E
12/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/18/2025
Special inspection requirement — Structural Steel - Details
SEBASTIAN SETTEDUCATE JR., P.E
12/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
12/18/2025
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
12/13/2025
Violation issued (HPD, closed)
B
12/13/2025
Violation issued (HPD, closed)
B
12/13/2025
Violation issued (HPD, closed)
A
12/13/2025
Violation issued (HPD, closed)
A
11/26/2025
Filed — Alteration
REPAIR WORK FOR 1ST FLOOR CONCRETE SLAB & METAL DECK
Q08049457-P3
11/25/2025
Special inspection requirement — Concrete - Cast-In-Place
SEBASTIAN SETTEDUCATE JR., P.E
11/25/2025
Special inspection requirement — Structural Steel - Details
SEBASTIAN SETTEDUCATE JR., P.E
11/25/2025
Special inspection requirement — Structural Steel - Welding
SEBASTIAN SETTEDUCATE JR., P.E
11/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/25/2025
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
11/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
10/20/2025
Violation issued (FDNY_ORDER, closed)
10/20/2025
Violation issued (FDNY_ORDER, closed)
05/16/2025
Violation issued (HPD, open)
B
05/09/2025
Violation issued (HPD, open)
A
05/09/2025
Violation issued (HPD, open)
B
05/09/2025
Violation issued (HPD, closed)
C
02/21/2025
Violation issued (HPD, closed)
A
02/03/2025
Violation issued (HPD, closed)
A
02/03/2025
Violation issued (HPD, open)
C
02/03/2025
Violation issued (HPD, closed)
B
02/03/2025
Violation issued (HPD, closed)
B
01/13/2025
Violation issued (HPD, open)
C
01/13/2025
Violation issued (HPD, open)
B
01/13/2025
Violation issued (HPD, open)
B
12/09/2024
Violation issued (FDNY_NOV, closed)
11/07/2024
Filed — Alteration
REPAIR WORK FOR 1ST FLOOR CONCRETE SLAB & METAL DECK
Q08049457-P2
10/07/2024
Permit issued — Construction Fence
Q08049457-S1-FN
Latest 60 of 170 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedEci Contracting Group07/23/2026
DOB NOWGeneral ConstructionPermit IssuedAtria Builders07/15/2026
DOB NOWConstruction FencePermit IssuedMetro City Construction10/07/2024
DOB NOWGeneral ConstructionPermit IssuedMetro City Construction09/15/2023
DOB NOWConstruction FencePermit IssuedMetro City Construction09/14/2023
DOB NOWPlumbingSigned-offVillage P & H NY08/17/2021
DOB NOWStructuralSigned-offMetro City Construction07/21/2021
DOB NOWConstruction FenceSigned-offMetro City Construction07/19/2021
DOB NOWAntennaSigned-offArmentum Digital Infrastr08/17/2020
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I05/21/2018
DOB NOWAntennaSigned-offItc Service Group*04/09/2018
DOB NOWSignSigned-offCad Signs NYC12/08/2017
BISBLISSUEDMaxwell Plumbing Mechanical02/18/2020
BISBLISSUEDMaxwell Plumbing Mechanical04/11/2019
BISOTISSUEDAtlas Construction of NY07/31/2018
BISOTISSUEDAtria Builders06/14/2018
BISOTISSUEDAtria Builders04/30/2018
BISPLISSUEDAura Plumbing12/15/2017
BISPLISSUEDA&H Express Plumbing & Heating11/20/2017
BISOTISSUEDAtria Builders07/26/2017
BISOTISSUEDAtria Builders07/20/2017
BISEQISSUEDAtria Builders07/13/2017
BISOTISSUEDCharles M Dwyer04/19/2017
BISOTISSUEDAtria Builders12/01/2016
BISOTISSUEDBechtel Infrastructure An10/26/2016
BISOTISSUEDBechtel Infrastructure An04/06/2016
BISOTISSUEDBechtel Infrastructure An02/19/2016
BISOTISSUEDBechtel Infrastructure An10/24/2014
BISPLISSUEDAura Plumbing08/29/2014
BISOTISSUEDOdyssia Global Commercial08/21/2014
BISMHISSUEDOdyssia Global Commercial08/21/2014
BISOTISSUEDEastern Alliance04/07/2011
BISSPISSUEDThe Plumbing Company06/10/2005
BISPLISSUEDThe Plumbing Company06/01/2005
BISPLISSUEDThe Plumbing Company04/08/2004
BISSPISSUEDArco Plumbing and Heating02/12/2004
BISPLISSUEDWagner Ziv Plumbing & Heating09/17/2003
BISMHISSUEDAtria Builders08/27/2003
BISOTISSUEDAtria Builders08/21/2003
BISMHISSUEDHillside Homes06/11/2003
+ 11 more permits on file
2 projects · most recent 08/17/2026
FiledStatusContractorScope
08/17/2026CompleteAll Ways Electric Corp.w—
05/16/2018CompleteMega Electrical Contracting—
2 projects · most recent 06/03/2026
Steel Concrete
FiledStatusContractorScope
06/03/2026Permit IssuedEci Contracting GroupSteel
11/26/2025Permit IssuedMetro City ConstructionSteel, Concrete
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/15/2021Pass-Final Fence Non-Directive 14PassView ↗
10/14/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/13/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/13/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/05/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/28/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
06/17/2026FinalLESLEY SCHMERZLERprogress
06/01/2026Structural Steel - DetailsJOSHUA LUCKRITZspecial
05/27/2026Structural Steel - WeldingJOSHUA LUCKRITZspecial
05/27/2026FinalYakov Weinsteinprogress
05/27/2026Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
05/27/2026Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
12/18/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
12/18/2025Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
12/18/2025Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
12/18/2025Tenant Protection Plan Compliance—special
12/18/2025Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
12/18/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
12/18/2025FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
11/25/2025Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
11/25/2025Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
11/25/2025Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
11/25/2025Tenant Protection Plan Compliance—special
11/25/2025FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
11/25/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
11/25/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
06/10/2024Tenant Protection Plan Compliance—special
06/07/2024Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
06/07/2024Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
06/07/2024Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
06/07/2024Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 32.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
U.S. Renalcare South Flushing DialysisMedical / HealthcareFloor 1
Project Q00002350 Alteration · LOC Issued · 12/07/2017
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 311 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
08/29/2026Q00002350-I1Request digital key ↗
08/27/2026Q00549496-I1Request digital key ↗
08/27/2026Q00549459-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
08/28/2026Q00350911-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION30
05/18/2020421386351Open ↗
12/23/2019440579376Open ↗
05/15/2019420958510Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION21
12/23/2019440579376Open ↗
04/19/2019421887676Open ↗
08/21/2018421513810Open ↗
Showing 3 of 21 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
06/14/2018421266668Open ↗
06/07/2018421266668Open ↗
▸Seals & Professional Certifications75
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
03/23/2020421887676Open ↗
02/14/2020440579376Open ↗
05/20/2019420958510Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/29/2026Q00015467-I1Open ↗
08/28/2026Q00350911-I1Open ↗
08/16/2026Q01408152-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026Q08049457-P3Open ↗
08/28/2026Q08049457-P1Open ↗
08/27/2026Q08049457-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026Q08049457-P3Open ↗
08/28/2026Q01418596-I1Open ↗
08/28/2026Q08049457-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
12/23/2019440579376Open ↗
04/19/2019421887676Open ↗
04/25/2018440478948Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/19/2019421887676Open ↗
06/26/2017421518931Open ↗
06/13/2017421513482Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/23/2019440579376Open ↗
04/25/2018440478948Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/23/2019440579376Open ↗
04/25/2018440478948Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
02/15/2018421266668Open ↗
12/06/2017420958510Open ↗
12/05/2016421266668Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION2
03/23/2020421887676Open ↗
03/23/2020421887676Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/19/2019421887676Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes6
04/19/2019421887676Open ↗
06/06/2018421513810Open ↗
10/24/2016421375425Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
11/03/2018421677938Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00350911-I1Open ↗
▸Environmental & Asbestos19
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
06/06/2018421513810Open ↗
04/25/2018440478948Open ↗
04/27/2017421386351Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/16/2026Q01418596-I1Open ↗
08/14/2026Q00015467-I1Open ↗
08/13/2026Q08049457-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
03/23/2020421887676Open ↗
02/14/2020440579376Open ↗
05/20/2019420958510Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
05/29/2020421386351Open ↗
03/23/2020421887676Open ↗
02/14/2020440579376Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
05/29/2020421386351Open ↗
12/24/2019440579376Open ↗
12/23/2019440579376Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/23/2019440579376Open ↗
04/25/2018440478948Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/29/2020421386351Open ↗
12/23/2019440579376Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/24/2016421266668Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
02/24/2016421266668Open ↗
▸Approvals, Objections & Sign-offs38
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
05/29/2020421386351Open ↗
03/23/2020421887676Open ↗
02/14/2020440579376Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
09/09/2019420958510Open ↗
08/30/2019420958510Open ↗
04/19/2019421887676Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
01/19/2016421255019Open ↗
Showing 1 of 6 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
11/03/2018421677938Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT26
03/23/2020421887676Open ↗
02/14/2020440579376Open ↗
12/23/2019440579376Open ↗
Showing 3 of 26 on file for this type
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET12
04/19/2019421887676Open ↗
11/03/2018421677938Open ↗
06/06/2018421513810Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION8
09/09/2019420958510Open ↗
05/07/2019420958529Open ↗
01/12/2019421513810Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM7
05/15/2019420958529Open ↗
10/20/2018440478948Open ↗
06/07/2018421513482Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/23/2019440579376Open ↗
04/25/2018440478948Open ↗