← Back
Two stories - detached, small or mid-size
159-14 GRAND CENTRAL PKWY
QUEENS · BIN 4148633
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R4-1Zoning
1,340 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,677 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 19 docs
Floor 2Under Construction11p · 1 filing · 19 docs
Floor 1Under Construction12p · 2 filings · 20 docs
CellarUnder Construction13p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/01/2021$775K—— → —$578/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS508/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.403/21/2026
GERALD J CALIENDO R A P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAJO, CARLOSElectrical103/21/2026
WALTERS, JAMESElectrical103/21/2026
NORTHSHORE INDUSTRIES INCGeneral Contractor107/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616308/17/2026
Building Lifecycle
All (49)Filed (5)Permit Issued (1)Violation (8)Objection (8)Special Inspection (27)
08/17/2026
Filed — Alteration CO
PROPOSED ALTERATION OF AN EXISTING DETACHED TWO-STORY SINGLE-FAMILY DWELLING WITH CELLAR TO A TWO-FAMILY DWELLING. NO CHANGE TO BULK, HEIGHT, FAR, OR EGRESS. WORK TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01352639-P3
07/28/2026
Permit issued — General Construction
Q01352639-I1-GC-CX
05/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
05/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
03/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
03/13/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
03/13/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
03/13/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
03/13/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
03/13/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
03/11/2026
Special inspection requirement — Electric vehicle service equipment requirements
SHAHRIAR QUAYYUM
02/12/2026
Filed — Alteration CO
PROPOSED ALTERATION OF AN EXISTING DETACHED TWO-STORY SINGLE-FAMILY DWELLING WITH CELLAR TO A TWO-FAMILY DWELLING. NO CHANGE TO BULK, HEIGHT, FAR, OR EGRESS. WORK TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01352639-I1
02/12/2026
Filed — Alteration CO
PROPOSED ALTERATION OF AN EXISTING DETACHED TWO-STORY SINGLE-FAMILY DWELLING WITH CELLAR TO A TWO-FAMILY DWELLING. NO CHANGE TO BULK, HEIGHT, FAR, OR EGRESS. WORK TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01352639-S1
02/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Permanent certificate
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Air barrier — testing
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
02/04/2026
Objection raised — Admin
01/28/2026
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
01/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
01/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
01/28/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
01/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
01/06/2026
Filed — Alteration
FILED HEREWITH PLUMBING APPLICATION IN CONJUNCTION WITH APPLICATION #Q01320046-I1. TO OBTAIN A LETTER OF COMPLETION AND CERTIFICATION OF OCCUPANCY.
Q01339345-I1
01/02/2026
Objection raised — Fire_Protection
01/02/2026
Objection raised — Other
01/02/2026
Objection raised — Other
01/02/2026
Objection raised — Admin
01/02/2026
Objection raised — Energy
01/02/2026
Objection raised — Zoning
01/02/2026
Objection resolved — Addressed
12/17/2025
Filed — Alteration CO
Q01320046-I1
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/02/2025
Special inspection requirement — Combustible Exterior Wall Coverings
12/02/2025
Special inspection requirement — Concrete - Cast-In-Place
06/29/2010
Violation issued (ECB, closed)
Construction
05/14/2008
Violation issued (HPD, open)
C
04/30/2008
Violation issued (ECB, closed)
HPD
04/01/2008
Violation issued (ECB, closed)
Construction
03/25/2008
Violation issued (ECB, closed)
Quality of Life
03/25/2008
Violation issued (ECB, closed)
Quality of Life
03/23/2008
Violation issued (HPD, open)
B
03/23/2008
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNORTHSHORE INDUSTRIES INC07/28/2026
BISPLISSUEDPETER MICELI PLUMBING07/09/2015
BISOTISSUEDDNS FINE BUILDERS INC06/17/2015
1 project · most recent 08/17/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Permit IssuedNORTHSHORE INDUSTRIES INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MSZ-GL12NA 12,000 BTU · Heat Pump Outdoor ×12
MSZ-FS12NA 12,000 BTU · Split System ×4
MSZ-GL06NA 6,000 BTU · Heat Pump Outdoor ×2
Heating
Mitsubishi Electric MSZ-GL12NA 12,000 BTU · Heat Pump Outdoor ×12
MSZ-FS12NA 12,000 BTU · Split System ×4
MSZ-GL06NA 6,000 BTU · Heat Pump Outdoor ×2
Ventilation
Mitsubishi Electric MSZ-GL12NA 12,000 BTU · Heat Pump Outdoor ×12
MSZ-FS12NA 12,000 BTU · Split System ×4
MSZ-GL06NA 6,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 01/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/06/2026——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
05/11/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
05/11/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
03/19/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
03/13/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
03/13/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
03/13/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
03/13/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
03/13/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
03/11/2026Electric vehicle service equipment requirementsSHAHRIAR QUAYYUMenergy_progress
02/12/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
02/12/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
02/12/2026Permanent certificateSHAHRIAR QUAYYUMenergy_progress
02/12/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
02/12/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
02/12/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
02/12/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
02/12/2026MeteringSHAHRIAR QUAYYUMenergy_progress
02/12/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
01/28/2026Mechanical SystemsSHAHRIAR QUAYYUMspecial
01/28/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
01/28/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
01/28/2026FinalSHAHRIAR QUAYYUMprogress
01/28/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
01/28/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
12/02/2025Fire-Resistant Penetrations and Joints—special
Latest 25 of 27.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026Q01339345-I1Request digital key ↗
08/17/2026Q01352639-I1Request digital key ↗
08/17/2026Q01352639-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
07/20/2015421163813Open ↗
06/26/2015421163813Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/30/2015421163813Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026Q01352639-S1Open ↗
08/17/2026Q01352639-P3Open ↗
08/17/2026Q01352639-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/14/2016421163813Open ↗
05/30/2015421163813Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026Q01352639-I1Open ↗
08/31/2026Q01352639-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/30/2015421163813Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/30/2015421163813Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026Q01352639-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
12/01/2015421163813Open ↗
11/23/2015421163813Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/30/2015421163813Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/17/2026Q01352639-I1Open ↗
08/17/2026Q01352639-P3Open ↗
08/13/2026Q01320046-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026Q01352639-P3Open ↗
08/17/2026Q01352639-I1Open ↗
08/17/2026Q01352639-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/30/2015421163813Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/14/2016421163813Open ↗
05/30/2015421163813Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/14/2016421163813Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
05/30/2015421163813Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/24/2016421163813Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/14/2016421163813Open ↗
05/30/2015421163813Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/30/2015421163813Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/17/2026Q01352639-I1Open ↗
08/17/2026Q01352639-P3Open ↗
08/13/2026Q01320046-I1Open ↗